Loading...
ITEM 5.2 Interim E-8 Lift Stationr eg Ot�co MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: OMMMMIMMMMM MEETING DATE: Planning City Engineer Wagner 25 April 2016 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner Finance Director Flaherty 5.2 — Interim E-8 Lift Station AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends approving a resolution accepting bids and awarding a contract to Burschville Construction. ARE YOU SEEKING APPROVAL OF A CONTRACT? I IS A PUBLIC HEARING REQUIRED? Yes. No. BACKGROUND/JUSTIFICATION: Bids for construction of an interim lift station required to provide sanitary sewer service to a new E-8 School being constructed near Maclver and 80th St were opened on April 19. Bids were higher than the engineers estimate. The Independent School District #728 has an agreement with the City of Otsego to pay for $1,100,000 in infrastructure improvements. If the agreed upon improvements exceed $1,100,000, the City has the option to assess the amount greater than $1,100,000. At this point, the project costs are estimated to be very close to $1,100,000. Five bids were received and the bids were tabulated and the Bid Tab is attached. Bids were as follows: • Burschville Construction $119,400.00 • Eagle Construction $129,428.20 • Northdale Construciton Co., Inc. $146,618.58 • Pember Construction, Inc. $147,785.60 • Kuechle Underground, Inc. $159,183.00 Burschville Construction is the contactor for adjacent tied project of 80th St Improvements. They have also worked on several developments and City of Otsego projects in the past. Therefore we recommend approval of a contract to Burschville Construction of Hanover MN. ✓ SUPPORTING DOCUMENTS: X ATTACHED ❑ NONE A. Engineers Estimate B. Bid Tab C. Resolution 2016-43 Accepting Bids and Awarding Contract POSSIBLE MOTION Please word motion as you would like it to appear in the Motion to approve Resolution 2016-43 accepting bids and awarding a contract to Burschville Construction. BUDGET INFORMATION FUNDING: BUDGETED: X YES ISD #728 o NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) City of Otsego INTERIM LIFT STATION FOR ISD #728 E-8 SCHOOL ENGINEER'S COST ESTIMATE Riri Arharinla "A" - Infarim I iff Rfafinn Item No. Spec. Ref Description Unit Estimated Quantity Unit Price Total Estimated Extension 1 Connect To Existing Gravity Sewer LS 1 $1 750.00 $1,750 2 Connect To Existing Forcemain LS 1 $1,750.00 $1,750 3 Forcemain DIP Fittings LBS 148 $5.00 $740 4 72" Diameter Liftstaion Manhole 0- 8 feet EACH 1 $5,000.00 $5,000 5 72" Diameter Manhole - Additional Depth VF 13 $250.00 $3,250 6 5 HP Pumps EACH 2 $10,000.00 $20 000 7 Electrical Enclosure EACH 1 $5 000.00 $5 000 8 Phase 3 Power LS 1 $1 500.00 $1,500 9 SCADA LS 1 $22,500.00 _ $22,500 10 Lift Station Appurtances LS 1 $10,000.00 $10,000 11 CL 5 Ton 340 $20.00 $6,800 12 4" HDPE Forcemain DR11 AWWA C906 LF 55 $50.00 $2,750 13 Grading LS 1 $3,000.00 $3,000 14 8" SanitarV Sewer Main LF 14 $50.00 $700 15 60" Diameter Valve Manhole 0- 8 feet EACH 1 $2,500.00 $2,500 16 60" Diameter Manhole -Additional Depth VF 2 $200.00 1 $400 rotal - Bid Schedule "A" �ai,owu Total - Bid Schedule "A" - Interim Lift Station $87,640 TOTAL CONSTRUCTION COST $87,640 25%Administration, Legal, & Engineering $21,910 TOTAL ESTIMATED PROJECT COST $109,550 C:\Users\Taml.OT6EGOWppData\LocalV�Aicrosoft\Windows\INetCache\Content.Outlook\1HD3FVW1\OT639 EngEst (3-10.16) Page 1 of 1 c O a+ ice+ 0 0 F-W J gU)E CO LL �o 0 � 0 M U u N 00 W 0 0 +�i o O o0 O 0o O ui N n N O o ui N a6 N co » �o N O oo N Z n m M NO ui N n o o N r M m N N N o r N io M N M a N m m �n O T» Z M m U LU O X u LL! C O O N 00 00 N N 00 M m O O N 2 z _ O On' o o o � f0 O M O m o m o 7 O o o o N O N N m N O m O S z ao rn m v r N E tu t- O U W C O_ 0» o o 0 0 0 0 0 0 o v 0 0 0 0 w » U a m m m am. rm N �n N NN mm m r nm m LL w w » rn F- W Z Z 0 » 0 T 0 O 0 O 0 » 0 O 0 C0 0 0 O (0�� N 0 fO 0 n 0 m 0 r 0 O 0 N m W M m f9 O X W C O U v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 j w O O O O o O d 00 ui N O ui (A ui M o N o o N Ix CO z Z J O Q F 7 O 0 w N w O F a w a � v t a _ U 0 0 ¢ v c m o = ¢ E 00 60 N � v c o o ¢� LL m v v v N O v 0 o u m 10 m u c m m m E a' m m c E a U L Q a a 0 o x = v U m S O 'O F Z O N M N m fD N M a N m r m rn W zoo 2 j§f /0 g�) mLg m 3 ) \ k \ \ § § \ \ \ c4 \ \ k M . . \ ) ) ) IZ \ � \ ) [ ` } } ( LU CL § : \ / / < ) 7Ej- - \ \ \ \ \ \ \ \ \ } \ \ ML \ \ « j j 1-1 ML 1 .1 .1 ;:1 -11 vi !pl RESOLUTION NO. 2016-43 RESOLUTION ACCEPTING BID AND AWARDING CONTRACT WHEREAS, pursuant to an advertisement for bids for the construction of City of Otsego Project No. 15-0_, E-8 School Interim Lift Station bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Total Base Bid 1. Burschville Construction, Inc. $119,400.00 2. Eagle Construction Company, Inc. $129,428.20 3. Northdale Construction Company, Inc. $146,618.58 4. Pember Companies, Inc. $147,785.60 5. Kuechle Underground, Inc. $159,183.00 AND WHEREAS, it appears that Burschville Construction, Inc. of Hanover, Minnesota is the lowest responsible bidder, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO MINNESOTA: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Burschville Construction, Inc. of Hanover, Minnesota in the name of the City of Otsego for the E-8 School Interim Lift Station Project, according to the plans and specifications therefore approved by the city council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the city council this 25t" day of April, 2016. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk