ITEM 3.4A Street Trail Project 15-04OtSeOTY F o MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works/Park & Rec City Engineer Wagner September 26, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda Finance Director Flaherty 3.4A AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Final Payment in the amount of $3,507.87 for the 90th Street Trail, City Proiect No. 15-04 to Omann Brothers. ARE YOU SEEKING APPROVAL OF A CONTRACT? No IS A PUBLIC HEARING REQUIRED? No BACKGROUND/JUSTIFICATION: All work has been completed for the 90th Street Trail project by the Final Completion date of October 15th, 2015. This final payment is for the 5% retainage which was held to ensure final vegetation established which is has. The final total project construction cost is $70,157.40. This exceeds the original contract amount, $61,365.00, by approximately 14.3%. This overage is due to Change Order #1. Additional areas beyond the original project boundaries were disturbed during the project to create more gradual and friendly slopes typical of a park setting. Additional topsoil borrow was needed to fill along the trail edge, around the culverts, and fill a depression area NW of the "sledding hill". Also, most of the salvaged topsoil on the project was unusable as topsoil as it was thick sod clumps. SUPPORTING DOCUMENTS: x ATTACHED ❑ NONE List: Final Pavment (Pav Estimate No. 3) POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve payment to Omann Brothers in the amount of $3,507.87 for the 90th Street Trail, City Project No. 15-04. BUDGET INFORMATION FUNDING: x YES Development . NO FINAL PAYMENT CITY OF OTSEGO 90th Street Trail City Improvement Project No. 15-04 Date: September 15, 2016 Honorable Mayor & City Council City of Otsego 13400 90th Street NE Otsego, MN 55330 RE: 90th Street Trail, City Improvement Project No. 15-04 Contractor: Omann Brothers Paving, Inc. Contract Amount: $61,365.00 Award Dater June 12, 2015 Completion Date: October 15, 2015 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Omann Brothers, Inc. Bid Schedule "A" ITEM NO. I ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 MOBILIZATION 1 LS $2,500.00 $2,500.00 1 $ 2,500.00 2 SALVAGE GRAVEL 1 LS $1,000.00 $1,000.00 1 $ 1,000.00 3 SALVAGE TOPSOIL 120 CY $15.00 $1.800.00 120 $ 1,800.00 4 SALVAGE SIGN 2 EA $40.00 $80.00 1 $ 40.00 5 SALVAGE END SECTION 3 EA $100.00 $300.00 2 $ 200.00 6 SALVAGE RIPRAP 4 CY $40.00 $160.00 $ 7 REMOVE CURB 20 LF $20.00 $400.00 32 $ 640.00 8 REMOVE CONCRETE PAVEMENT 210 SF $1.50 $315.00 210 $ 315.00 9 REMOVE BITUMINOUS PAVEMENT 140 SF $1.00 $140.00 152 $ 152.00 10 SAWING CONCRETE PAVEMENT FULL DEPTH 8 LF $5.00 $40.00 11.67 $ 58.35 11 SAWING BITUMINOUS PAVEMENT FULL DEPTH 40 LF $3.00 $120.00 69 $ 207.00 12 SUBGRADE PREPARATION 15 STA $110.00 $1,650.00 15 $ 1,650.00 13 COMMON BORROW L 150 CY $10.00 $1,500.00 154 $ 1,540.00 14 AGGREGATE BASE CLASS 5 P 825 TON $18.00 $14,850.00 825 $ 14,850.00 15 TYPE LV WEARING COURSE MIXTURE 3,B 250 TON $89.00 $22,250.00 241.25 $ 21,471.25 16 CONCRETE CURB & GUTTER DESIGN B612 20 LF $45.00 $900.00 36 $ 1,620.00 17 6" CONCRETE WALK 140 SF $13.00 $1,820.00 175 $ 2,275.00 18 TRUNCATED DOMES 24 SF $55.00 $1,320.00 16 $ 880.00 19 15" CMP 125 LF $20.00 $2,500.00 140 $ 2,800.00 20 18" CMP 30 LF $25.00 $750.00 36 $ 900.00 21 REPLACE SALVAGED END SECTION 3 EA $100.00 $300.00 2 $ 200.00 22 15" METAL END SECTION 2 EA $150.00 $300.00 3 $ 450.00 23 18" METAL END SECTION 2 EA $175.00 $350.00 2 $ 350.00 24 REPLACE SALVAGED SIGN 2 EA $150.00 $300.00 1 $ 150.00 25 REPLACE SALVAGED RIPRAP 4 CY $40.00 $160.00 $ 26 STABILIZED CONSTRUCTION EXIT 1 EA $1,500.00 $1,500.00 1 $ 1,500.00 27 SILT FENCE 350 I-F $3.20 $1,120.00 344 $ 1,100.80 S:\Municipal\AOTSEGO\724\Pay Estimates\OT724 PE.xfsx PE-3 FINAL PAYMENT CITY OF OTSEGO 90th Street Trail City Improvement Project No. 15-04 Rini Crhad„lo "A" ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 28 END SECTION SEDIMENT PROTECTION 4 EA $100.00 $400.00 5 $ 500.00 29 PREMIUM TOPSOIL BORROW L 50 CY $25.00 $1,250.00 50 $ 1,250.00 30 SEED MIXTURE 22-111 3 LBS $30.00 $90.00 3 $ 90.00 31 SEEDING 0.20 ACRE $3,000.00 $600.00 0.20 $ 600.00 32 MULCH MATERIAL TYPE 1 0.20 TON $3,000.00 $600.00 0.20 $ 600.00 Total Bid Schedule "A" $ 61,366.00 $ 61,689.40 Charm. nrder Nn_ i ITEM NO. I ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 29 PREMIUM TOPSOIL BORROW L 50 CY -$25.00 -$1,250.00 50 $ 1,250.00 30 SEED MIXTURE 22-111 3 LBS -$30.00 -$90.00 3 $ 90.00 31 SEEDING 0.20 ACRE -$3,000.00 -$600.00 0.20 $ 600.00 32 MULCH MATERIAL TYPE 1 0,20 TON -$3,000.00 -$600.00 0,20 $ 600.00 33 PREMIUM TOPSOIL BORROW L 324 CY $17.00 $5,508.00 324 $ 5,508.00 34 SEED MIXTURE 22-111 125 LBS $15.00 $1,875.00 125 $ 1,875.00 35 SEEDING 0.69 ACRE $2,500.00 $1,725.00 0.69 $ 1,725.00 36 MULCH MATERIAL TYPE 1 0.95 TON $2,000.00 $1,900.00 0.95 $ 1,900.00 Total Bid Schedule "A" $ 8,468.00 $ 8,468.00 Bid Schedule "A" $ 61,365.00 Change Order No. 1 $ 8,468.00 TOTAL $ 69,833.00 TOTAL WORK COMPLETED TO DATE LESS PAY ESTIMATE #1: LESS PAY ESTIMATE #2: WE RECOMMEND PAYMENT OF Please verify the amount of previous payments, and the receipt of the following items prior to making payment. 1. Certificate of claims payment (lien waiver). 2. Affidavit of payment of state taxes (MN State Tax Form IC 134). 3. Letter of consent from surety firm. APPROVALS: CONTRACTOR: OMANN BROTHERS PAVING, INC Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. Signed: Title: Date ENGINEER: HAKANSON ANDERSON ASSOCIATES, INC. Certification by Engineer: We recommend payment for work and quantities as shown. OWNER: CITY OF OTSEGO Signed: Title: $ 61,689.40 $ 8,468.00 $ 70,157.40 $ 70,157.40 $ 58,604.93 $ 8,044.60 $ 3,507.87 S:\Mun1dpaM0TSEG0\724\Pay Estimates\0T724 PE.xlsx PE-4