ITEM 4.4 Remodel of city hall reception areaOt�ego TY OF MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Administration Lori Johnson, City Administrator September 26, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Lori Johnson, City Administrator 4.4 AGENDA ITEM DETAILS RECOMMENDATION: Recommend authorization to proceed with remodeling the building inspection and administration departments' work area. ARE YOU SEEKING APPROVAL OF A CONTRACT? Yes IS A PUBLIC HEARING REQUIRED? No BACKGROUND/JUSTIFICATION: The building inspection and administration reception area in City Hall was originally designed to accommodate two staff members when City Hall relocated to this building in 2012. Since that time, another staff member has been added to assist with building permit activity and general reception duties. Further, building permit activity has increased substantially requiring additional building inspectors and additional file/work space. Because of the increased building permit activity, an additional staff person was added, and it then became apparent that modifications to the workspace were necessary to alleviate the cramped, ineffective work area created by adding a third person to an area designed for two. The situation was was further compromised by the increased volume of plans and paperwork that flow through this area. Grady Kinghorn and Kinghorn Construction assisted staff in developing several remodeling options. All options were considered with effectiveness, cost, employee needs, and long-term use as priority considerations. The recommended option is to remodel and relocate the counter to create one counter with two building inspection department workstations and a handicap counter and a second counter with two workstations for administration. Copies of the existing layout and the proposed modification are attached. The construction cost of this option is $11,573.00 as quoted by the company that constructed the existing counter. This quote includes installation but excludes floor tile repair, rewiring, and security additions. In total, the project may reach $15,000 depending upon the extent of miscellaneous work needed. Funding for the remodeling project is recommended from the General Fund building inspection department budget. The Administrative Subcommittee reviewed this project at the September meeting and recommends Council approval. Finally, as the City continues to grow, future remodeling may be required before expansion of this building or construction of a new Citv Hall occurs. Additional next phases include removing or movin office walls and eliminating the main floor conference room, all of which staff wanted to avoid until all f other options were exhausted. SUPPORTING DOCUMENTS: X ATTACHED ❑ NONE • Quote from Interior Components Group, Inc. • Drawing of proposed counter layout • Drawing of existing counter layout POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve a City Hall building inspection and administration reception counter remodeling project including the quote with Interior Components Group, Inc. for $11,573.00 with funding from the Building Inspection Department budget of the General Fund. BUDGET INFORMATION FUNDING I BUDGETED: ❑ YES Building Inspection Department, General Fund Xo NO a Interior -�)-Components Group, Inc. -�-Commercloi 4asework-f�NeiaQ Flxlurea-�Oltfce Furnuvre 1045 331d Street South St Cloud, MN 56301 320.230.9525 phone 320.230.9527 fax PiroP 0sa1469 TO: Kinghorn Construction FROM: Matt Barden FAX/EMAIL: gikinghorn@kinghornco.com FAX: 320-230-9527 PHONE: 763-428-8088 PHONE: 320-230-9525 ext 117 REFERENCE: Otsego Public works DATE: August 31, 2016 Section: Interior Architectural Woodwork Base Bid Original Design: $13,556.00 Includes Installation Base Bid Optional Design: $11,573.00 Includes Installation This proposal only includes the following: • Reception Counter Original Design: Plastic laminated die walls and a plastic laminate countertop with oak edging. One die wall to sit on the floor with the other sitting on top of the countertop to match existing • Reception Counter Optional Design: Plastic laminated die walls and a plastic laminate countertop with oak edging. This would be built as one continual height die wall. • Delivery: Delivery to Otsego, MN Please note — Pricing is based on the manufacturer's standard line of materials/colors unless called out in the plans or specifications. Matt Barden Email: mattb interiorcomponentsgroup.com alg`' L1 .e-1;I AW1 0 CM BA bztu.a3luuYhY 4- 4- 4 IwLLBYMCD CDj arW0 CD u 1 x IL I MiF U4' z4Yid4' U£' 4r hr w DY"CD O 9 � � iALBY"cD O 1� 1r ( 4r .« ae. project; JOB#, 2915 PHZ# I m I CG = ' 95 OT5EGO PUBLIC WORKS PROJ, COOK., 5TEVEN WALtfN ;; N OT5EW, MN DRAWN BY; DLL 11 la* m - Iwo A i a 0 i �II �I 3G, i L 8 d fi �1 N = ~ ,,,,,,, �,r.d, arscwem �acar,M, � I..� cGN �.. c.4.. o..". project OT5EGO PUBLIC WORKS OT5EGO, MN JOB#: 2915 PHZ# I PROJ. COOK: 5TEVEN WALLEN DRAWN BY: DLL C l Project: JOB#; 2915 PNZ# I ~ I G G b= OT5EGO PUBLIC WORKS PROJ, COOK; 5TEVEN WALLEN F--► m ,�,. o....a OT5EGO, MN DRAWN BY; DLL