Loading...
ITEM 6.1 Minor Work Order #5P Otkgo MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner October 10, 2016 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 6.1 Finance Director Flaherty AGENDA ITEM DETAILS RECOMMENDATION: City Staff recommends approve preparation of Minor Work Order No. 5 for the installation of a new 8" draintile from 70th Street Ponds #5 to CSAH 37 ditch and preparation of an agreement between the City and Valerius Meadows, Inc regarding the installation of the 8" draintile. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No I No BACKGROUND/J USTI F [CATION: Storm Pond #5 located along the south side of the 70th Street/CSAH 37 project, on the Valerius Meadows property, has been holding water without draining down as designed. Many discussions and site visits have occurred since February 2016 and a few options have been presented to the Council and affected property owners. The current option is being presented to the Council per the request of the of the Valerius Meadows property owners. The option presented to the property owners to acquire approx. 3 acres of land around the existing pond to construct a large much larger storm basin was rejected by the property owner(s). They then voice their desire to revisit the draintile option (option #1) with a couple modifications. Staff has met with the property owners twice to discuss their concerns and discuss the new draintile option. The previous draintile option presented to and approved by the City Council required replacing the plugged draintile (currently being used by the pond as an outlet) with 1,285 feet of new 8" draintile from the pond to the existing discharge point to the southeast. This option required a temporary easement to construct the draintile. This option was rejected by the property owners as the installation of the new draintile would have required an agreement in which the draintile would have been turn over to the property owners to use and maintain. A quote of $19,734.00 was receive from Fehn Companies, the general contractor of 70th Street project. It should be noted that this option may have incurred additional costs to repair existing draintile that would have been cut/damaged by installing the new draintile across the farm fields. This option also crossed onto property not owned by Valerius Meadows which would have required negotiation with an additional property owner. The current draintile option is to replace the first —500 feet of the existing; draintile with new tile and then reroute it to the east to discharge to the CSAH 37 ditch, just south of the roundabout. This discharge point is adjacent to two new 18" culverts placed under CSAH 37 which would drain under the road, within the ditch and to the large pond east of CSAH 37. This option requires a new outlet structure and 2,276 feet of 8" draintile with much deeper cuts during installation (up to 15' deep) than the first draintile option. Therefore this option is more expensive than the previous option but does provide some benefits. First, the property owner to the south of Valerius Meadows appears to be unwilling to work with the City to allow the drainage or draintile to cross his land. This route eliminates the need to cross his property as it is entirely on the Valerius Meadows property. Second, this route discharges directly to the CSAH 37 ditch which can handle the additional runoff without concern for flooding of downstream fields or taxing existing downstream aging draintile, and third, by routing this draintile to the ditch we gain almost 5' of fall allowing the pipe slope to be increased to —0.4% which is the typical grade for most 8" sanitary sewer and therefore should be self-cleaning. Staff has been in contact with Fehn Companies to get a quote for placing this draintile. The property owners requested that we also contact a contractor that they have been talking to (Morris Excavating). Fehn has been notified and we are awaiting a quote for the work. Attached is the construction plan showing the work necessary to construct the new draintile. MNDOT has previously stated in writing that the work would be State Aid eligible. SUPPORTING DOCUMENTS: x ATTACHED ❑ NONE • Plan Sheet of Pond Improvements POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES. Motion to approve preparation of Minor Work Order No. 5 for the installation of a new 8" draintile from 70th Street Ponds #5 to CSAH 37 ditch and preparation of an agreement between the City and Valerius Meadows, Inc regarding the installation of the 8" draintile. BUDGET INFORMATION FUNDING: BUDGETED: ❑ YES MSAS Funds X NO ao FRAME AND CASTING ASSEMBLY M-11 (I.E. NEENAH R-4342 OR EQUIVALENT) RIM ELEV = 941.0 — REMOVE TEE/WYE AND CUT PIPE 13LF 8" NON -PERFORATED PVC PIPE 27„—Al t,,— DRAINAGE STRUCTURE DESIGN HI 2.8' / INV. ELEV --/ — 2276 LF 8" 939.5 NON —PERFORATED 8" CONCRETE BASE PVC PIPE INV. ELEV = 939.0 INV. ELEV OVERFLOW STRUCTURE = 937.75 TOP BERM LEV=944.0 ' DATE REVISION BML Hakanson 1� Anderson CMi Engineer and Land S� ye 3601 Thurston Ave., Anoke, IAinne o 55303 763-427-5860 FAX 763-427-0520 °'TM °' Oise MIMTA POND #5 OUTLET EXHIBIT 70TH ST/CSAH 37 PROJECT CITY OF OTSEGO SHEET 2 OF 2 SHEETS �� BML GmK. RJW DATE 10/5/16 No. OT388