Loading...
CIP Details (2017)Capital Improvement Plan City of Otsego, Minnesota Department Water UtilityData in Year 2017 Contact Lead Utility Systems Operator Description Water Tower #1 Rehabilitation NOTE: This project was adopted as part of the 2016 CIP as project 601-2016-01 in the amount of $428,600. As part of subsequent review of the project at a Special City Council meeting on 1/11/2016, the project was moved to 2017. This was done so that the tower could be online all of 2016 and provide support to water tower #3 during its scheduled cleaning as well as to meet the peak demand season. Project #601-2017-01 Priority n/a Justification Water Tower #1 has a 400,000 gallon capacity and was built in 1999. The tower was removed from service in 2010, as water supply needs for the East system were met through the use of Water Tower #3. Growth within the East system has brought Tower #3 and its respective wells to near capacity, requiring Tower #1 and its supply wells to return to service. Inspections completed in 2015 indiciate the tower needs signficant rehabilitation both on the interior and exterior in order to be returned to service. Tower #1 was dis-infected and was placed in service temporarily during 2016 to provide redundancy during the cleaning of Tower #3. However, in order to permanently place Tower #1 into service, the rehabilitation needs to be completed. It is expected the rehabilitation will provide 20-25 years of service life. The project has already been advertised for bids, and the contract awarded to the low bidder of Osseo Construction on June 27, 2016. The breakdown of the project costs are below: Construction Contract $390,050 Engineering & Specifications (2016) 9,500 Management & Observation (2017) 50,448 Contingency (SCADA Antenna) 5,000 Total $454,998 Useful Life Project Name Water Tower #1 Rehabilitation Category Water Utility System Type Utility System Total Project Cost:$454,998 Total2017 2018 2019 2020 2021Expenditures 445,498445,498Utility System 445,498 445,498Total Total2017 2018 2019 2020 2021Funding Sources 445,498445,498601 - Water Utility 445,498 445,498Total Wednesday, October 19, 2016 Capital Improvement Plan City of Otsego, Minnesota Department Water UtilityData in Year 2017 Contact Lead Utility Systems Operator Description Installation of water main along Kadler Avenue from 70th Street to existing Well #7. NOTE: This project was discussed as far back as 2012 and was adopted as part of the 2016 CIP as project 601-2018-01. As part of subsequent review of the project at a Special City Council meeting on 1/11/2016, the project was moved to 2017. Project #601-2017-02 Priority n/a Justification The City Engineer estimates that with the current rate of development, that the existing water system within the West District will reach its design capacity of 1,918 REC's in 2019. The City currently operates Well #7 on an individual system, which services the neighborhood of Riverwood National. This individual system is reaching capacity and does not provide adequate water supply in the event of a fire. The installation of water main along Kadler Avenue from 70th Street to the existing Well #7 solves both of the problems identified above. Rehabilitation of the existing Well will also be completed to increase the capacity provided by the existing well. It is also expected that the addition of public water services along Kadler Avenue will accelerate the development of the industrial sites in this area of the City. Useful Life Project Name Water Main Extension to Well #7 Category Water Utility System Type Utility System Total Project Cost:$1,525,000 Total2017 2018 2019 2020 2021Expenditures 1,525,0001,525,000Utility System 1,525,000 1,525,000Total Total2017 2018 2019 2020 2021Funding Sources 1,525,0001,525,000601 - Water Utility 1,525,000 1,525,000Total Wednesday, October 19, 2016 Capital Improvement Plan City of Otsego, Minnesota Department Sanitary Sewer UtilityData in Year 2017 Contact Lead Utility Systems Operator Description Hiring a consultant to perform a comprehensive study of the current Sanitary Sewer Facilities and the future of them. Project #602-2016-04 Priority n/a Justification The City is growing to the point where the capacity of the Sanitary Sewer Utility facilities need to be evaluated. Useful Life Project Name Sanitary Sewer Master Study Category Sanitary Sewer Utility System Type Utility System Total Project Cost:$88,000 Total2017 2018 2019 2020 2021Expenditures 38,00038,000Utility System 38,000 38,000Total Total2017 2018 2019 2020 2021Funding Sources 38,00038,000602 - Sanitary Sewer Utility 38,000 38,000Total Wednesday, October 19, 2016 Capital Improvement Plan City of Otsego, Minnesota Department Sanitary Sewer UtilityData in Year 2017 Contact Lead Utility Systems Operator Description Aeration equipment purchace West WWTF . Project #602-2017-01 Priority n/a Justification The 2015 Liquid Re Rate Review of the West Wastewater Treatment Facility by AE2S Engineering identified the need for aeration equipment to meet Minnesota Pollution Control Reduncey Standards. The costs includes equipment purchase only, providing availability to install with minimal downtime in the event of failure. The equipment provides mixing and aeration to the Oxidation Ditch used for biological treatment of the facility. Useful Life Project Name West WWTF - Oxidation Aeration Equipment Category Sanitary Sewer Utility System Type Utility System Total Project Cost:$115,000 Total2017 2018 2019 2020 2021Expenditures 115,000115,000Utility System 115,000 115,000Total Total2017 2018 2019 2020 2021Funding Sources 115,000115,000602 - Sanitary Sewer Utility 115,000 115,000Total Wednesday, October 19, 2016 Capital Improvement Plan City of Otsego, Minnesota Department Sanitary Sewer UtilityData in Year 2017 Contact Lead Utility Systems Operator Description Pump replacement at Lift Station #3 (West WWTF). Project #602-2017-02 Priority n/a Justification Lift Station #3 is a triplex lift station maintaining three pumps for wastewater conveyance from the West Sanitary District to the West Wastewater Treatment Facility. The last remaining 20 horsepower submersible pump installed during the original construction requires a sizing increase to support flow needs. No additional control panel work is required as the 2015 panel modifications prepared for the upgrade. Useful Life Project Name Lift Station #3 - Pump Replacement Category Sanitary Sewer Utility System Type Utility System Total Project Cost:$33,000 Total2017 2018 2019 2020 2021Expenditures 33,00033,000Utility System 33,000 33,000Total Total2017 2018 2019 2020 2021Funding Sources 33,00033,000602 - Sanitary Sewer Utility 33,000 33,000Total Wednesday, October 19, 2016