ITEM 3.7 Empty East WWTF storage tankOtCI�ezoF MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Utilities Utility Manager, Kurt October 24, 2016 Neidermeier PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda Administrator, Lori Johnson 3.7 AGENDA ITEM DETAILS RECOMMENDATION: Approve Fergus Power Pump Inc. to fully empty the East Wastewater Treatment Storage Tank for a proposed estimate of $41,794.00. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The East Wastewater Treatment Facility Storage Tank was reviewed for complete solids removal to mitigate future odors. The tank is designed as a process structure oxidation ditch, maintaining a flat bottom. Existing equipment does,not allow for complete mixing and solids removal for a full cleaning. Quotes for solids removal from this Storage Tank were requested from two contractors; one responded with the attached quote and another was unable to assist due to lack of necessary equipment. There are very limited contractors with the equipment and knowledge to complete the requested project. The included proposal provides mobilization, cleaning and removal with land application at a project cost of $41,794.00. Fergus Power Pump (FPP) was approved at the September 12th council meeting for Biosolids hauling and application this fall. The City has used FPP for application purposes in the past with excellent reviews. Staff provides recommendation of acceptance of the project. The Public Works Subcommittee reviewed the proposal at the October 181h meeting with recommendation of approval. SUPPORTING DOCUMENTS: (X) ATTACHED • Proposal MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to approve Fergus Power Pump for removal and cleaning of the East Wastewater Treatment Facility Storage Tank per proposal. BUDGET INFORMATION FUNDING: BUDGETED: (X) No 602 — Sanitary Sewer Operating Budget Tami Loff From: Jim Peterson - Fergus Power Pump <jimfpp@prtel.com> Sent: Monday, September 26, 2016 1:21 PM To: Kurt Neidermeier September 26, 2016 Mr. Kurt Neiderrneier City of Otsego RE: CLEANING OXIDATION DITCH AT OSTEGO, MN Dear Mr. Neidermeier Thank you for the opportunity to offer a proposal for cleaning the oxidation ditch at City of Otsego East Waste Water Treatment Facility. City of Otsego will pump water from the oxidation ditch. Fergus Power Pump, Inc. will clean and remove the remaining material of approximately 150,000 gallons after annual land application. The material removed will be land applied and or as an alternative to transport the material to City of Buffalo Waste Water Treatment Facility. City of Otsego will be responsible for tipping and all other associated costs to transfer to City of Buffalo Waste Water Treatment Facility. To provide the most economical method for cleaning the oxidation ditch, Fergus Power Pump, Inc. proposes a project cost as follows: Mob & Demob (Lump Sum) $ 5,127.00 Cleaning, Removing, $28,567.00 Option 1: Transporting material from Oxidation Ditch to land application site $8,100.00 Option 2: Transporting material from Oxidation Ditch to Buffalo WWTF $8,100.00 The total project cost with either option is $41,794.00 along with tipping fees and all other fees for transferring to Buffalo as previously stated. This Project is estimated to take 40 -60 hours due to potential unforeseen possibilities and the project hours become more, those additional hours will be at $525.00 / hour. Upon receipt of Purchase Order, this proposal becomes a binding agreement between Fergus Power Pump, Inc. and City of Otsego. Once again, Fergus Power Pump, Inc. would like to thank you for the opportunity in submitting a proposal for your project. If you have any questions or need clarifications, please do not hesitate to call. Sincerely, Mitch Okerstrom, President No virus found in this message. Checked by AVG - www.avg.com Version: 2016.0.7797 / Virus Database: 4656/13088 - Release Date: 09/26/16