Loading...
ITEM 3.9C Street Improvement Project 15-07401 OtsIY.F O MINNESOTA V Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner November 14, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda Interim Citv Administrator Flaherty 3.9C AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of payment in the amount of $243,159.26 for the 80th Street Improvement Project, City Project No. 15-07 to Burschville Construction, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUNDMUSTIFICATION: This payment is being made for work completed through October 315t, 2016. Burschville Companies, Inc. and their subcontractors had previously completed all the clearing and grubbing, bituminous removal, temporary traffic signage, 100% of the Utility installation including watermain, forcemain and storm sewer. They have now completed the interim lift station driveway, concrete curb and gutter and pedestrian ramps, paving the bituminous base course, turf establishment and erosion control. The bituminous path has also recently been paved. Only work remaining is for a couple concrete pedestrian ramps to be placed and turf to be established. The wear course will be placed next spring, after one freeze thaw cycle. This payment includes Change Order #1 in the amount of $15,485.94, with an actual amount of $17,331.94 for moving the existing pond outlet structure near Maciver Avenue and 80th Street, revisions to the interim lift station driveway typical section due to poor in -place soils, and adding draintile under the lift station driveway. This pay estimate (#4) is for $243,159.26. Total work completed to date is $682,752.83. Total original contract amount of the project was $790,360.63. With Change Order #1 the total contract amount is now $805,846.57. SUPPORTING DOCUMENTS: X ATTACHED NONE Pay Estimate No. 4 Change Order #1 POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve change order #1 and for payment to Burschville Construction, Inc. in the amount of $243,159.26 for the 80th Street Improvement Project, City Project No. 15-07. BUDGET INFORMATION FUNDING: BUDGETED: Agreement with ISD #728 This project was not budgeted. Water Utility Fund — 601 (for Trunk Water) PAY ESTIMATE #4 CITY OF OTSEGO 80T STREET NE IMPROVEMENT PROJECT (Maciver Ave. to Marlow Ave.) November 7. 2016 Honorable Mayor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 RE: 80th Street NE Improvement Project (Maciver Ave. to Marlowe Ave.) Contractor: Burschville Construction, Inc. Contract Amount: $790,360.63 Award Date: March 18, 2016 Completion Date: June 1, 2017 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Burschville Construction, Inc. -1. ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACTAMOUNT USEDTO DATE EXTENSION 1 Mobilization 1 LS $17,000.00 $ 17,000.00 0.9 $ 15,300.00 2 Clear &Grub 0.05 ACRE $10,000.00 $ 500.00 0.05 $ 500.00 3 Remove Concrete Culvert 106 LF $8.00 $ 848.00 115 $ 920.00 4 Remove Concrete Curb and Gutter 6 LF $10.00 $ 60.00 22 $ 220.00 5 Bituminous Pavement Removal 6,005 SY $1,60 $ 9,608.00 6,005 $ 9,608.00 6 lRemove Concrete Structure 1 EA $400.00 $ 400,00 1 $ 400.00 7 1 Remove Sin 4 EA $27.50 $ 110.00 4 $ 110.00 8 JSawing Bit Pavement Full Depth) 131 LF $3.50 $ 458.50 131 $ 458.50 9 Salvage Concrete Pie 86 LF $12.00 $ 1,032.00 86 $ 1,032.00 10 Remove & Salvage Landscape Material 154 LF $4.00 $ 616.00 0 $ - 11 Common Excavation P 12788 CY $4.95 $ 63,300.60 12,788$ 63,300.60 12 Sub radeCorrection E 6,788 CY $3.10 $ 21,042.80 4,152 $ 12,871.20 13. Common Borrow L 2,181 CY $3.70 $ 8,069.70 `. _._0 $ - 14 Salvaged Topsoil From Stockpile L 2,103 CY $6.70 $ 14,090.10 2,103 $ 14,090.10 15 Select Granular Borrow LV 2,000 CY $10.80 $ 21,600.00 0. $ - 16 JAggre ate Base Class 2 Shoulder 49 TON $45.50 $ 2,229.50 51 $ 2,302.30 17 Aggregate Base Class 3 or 4 12,702 TON $8.70 $ 110,507.40 11,233 $ 97,728.41 18 Aggregate Base Class 5 Mod 4,475 TON $16.50 $ 73,837.50 4.475 $ 73,837.60 19 Mill Bituminous Surface 1.5" 18 SY $16.00 $ 288.00 0 $ - 20 Bituminous Material For Tack Coat 437 GAL $2.20 $ 961.40 85 $ 187.00 21 Type SP 12.5 Wearing Course Mixture 2,6 rall 222 TON $61.00 $ 13,542.00 242 $ 14,735,77 22 Type SP 9.5 Wearing Course Mixture 3,C 1,031 TON $60.50 $ 62,375.50 0 $ - 23 Type SP 12.5 Non Wear Course Mixture 3,C 1,289 TON $56.50 $ 72,828.50 1,287 $ 72,724.54 24 1 Iconcrete Curb & Gutter Design B618 2,446 LF $12.25 $ 29,963.50 2,410 $ 29,522.50 25 11 6" Concrete Driveway Pavement 66 SY $46.00 $ 2,970.00 27 $ 1.215.00 26 7" Concrete Valley Gutter 130 SY $52.00 $ 6,760,00 130 $ 6,760.00 27 Truncated Domes 96 SF $44.00 $ 4,224,00 38 $ 1,672.00 28 4" Bituminous Curb 325 LF $4.20 $ 1,365.00 312 $ 1,310.40 29 Bituminous Flume 2 EACH $620.00 $ 1,240.00 2 $ 1,240.00 30 Install Mailbox Support 2 EA $160.00 $ 320.00 2. $ 320.00 31 Traffic Control 1 LS $8,500.00 $ 8,500.00 1.0 $ 8,500.00 32 Sign Panels, Type C 119 SF $34.00. $ 4,037.50 0 $ - 33 1SIIt Fence, Type MS 6.300 LF $1.60 $. 8,480.00 3,364 $ 5,382.40 34 Storm Drain Inlet Protection 11 EACH. $125.00 $ 1,375.00 11 $ 1,375.00 35 Sediment Control Log Type Straw 24 1 LF $2.75 $ 66.00 340 $ 935.00 36 Stabilized Construction Exit 3 LS $1,100.00 $ 3,300.00 3 $ 3,300.00 37 Seeding 2 ACRE $375.00 $ 690.00 1 $ 187.50 38 Seeding Mixture - 25-141 81 LBS $3,20 $ 259,20 25 $ 80.00 39 Seeding Mixture-25-151 56 LBS $2.40 $ 134.40 80 $ 192.00 40 Mulch Material Type 1 3 TON $300.00 $ 930,00 1 $ 300.00 41 Erosion Control Blanket- Category 2 1,320 SY $1201 $ 1,584.00 1,956 $ 2,347,20 S:\Municipal\AOTSEGO\393\PAY ESTIMATES\OT393 PE PE - 1 PAY ESTIMATE #4 CITY OF OTSEGO 80T STREET NE IMPROVEMENT PROJECT (Maciver Ave. to Marlow Ave.) ecru scneame ITEM NO. e{ ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACTAMOUNT USED TO DATE EXTENSION 42 Pavement Message Left Arrow - Paint 13 EACH $75.00 $ 975.00 $ 43 12" Solid Line While - Paint 104 LF $2.65 $ 275.60 $ - 44 24" Solid Line White - Paint 27 LF $3.60 $ 97.20 $ 45 24" Solid Line Yellow - Paint 288 LF $2.65 $ 763.20 $ 46 4" Broken Line White - Paint 361 LF $0,03 $ 10.83 $ 47 4" Double Solid Line Yellow - Paint 3,095 LF $0,03 $ 92.851 4,938 $ 148.14 48 4" Solid Line White - Paint 4,797 LF $0.15 $ 719.55 $ 49 Crosswalk Markin 3'X6' Blocks White - Paint 126 SF $2.85 $ 359.10 $ Total Bid Schedule "A" $ 574,797.43 $ 440,-rrs.uo ecru scneuum ITEM NO. o - awnu aewcr ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 50 DrainageStructure 1 LS $1,200.00 $ 1,200.00 1 $ 1,200.00 51 �onneoExistin e A ron 2 EACH $600.00 $ 1,200.00 2 $ 1,200.00 52 21" RC Pipe Apron 1 EACH $650.00 $ 650.00 1 $ 650.00 53 4" Precast Concrete Headwall 2 EACH $300.00 $ 600.00 1 $ 300.00 54 4" Pe f PVC Pipe Drain 633 LF $10.00 $ 6,330,00 468 $ 4,680.00 55 15" RC Pipe Sewer Design 3006 CL V all depths) 96 LF $28.00 $ 2,688.00 90 $ 2,520.00 56 18" RC Pipe Sewer Design 3006 CL V all depths) 368 LF $30.00 $ 11,040.00 370 $ 11,100.00 57 21" RC Pipe Sewer Design 3006 CL III all depths) 728 LF $34.00 $ 24,752.00 743 $ 25,262.00 58 Construct Drainage Structure Design 48-4020 38 LF $365.00 $ 13,870.00 36.81 $ 13,435.65 59 Construct Drainage Structure Design 2' x 3' 7.6 LF $337.00 $ 2,561.20 7.64 $ 2,574.68 60 Articulated interlocking Block Open Cell, Type A 18.8 1 SY $150.001 $ 2,820.00 19 $ 2.850.00 Total Bid Schedule "B" $ 67,711.2U $ oo,rrz.so tsra scneame ITEM NO. -v- - uuenm aanuur ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 61 Connect To ExistingSanitary Manhole 1 LS $2,500.00 $ 2,600.00 1 $ 2,500.00 62 4" HOPE SDR-11 AWWA C906 Forcemain Pie 1,099 LF $17.00 $ 18,683.00 1,092 $ 18,564.00 63 Forcemain DIP Fittings 162 LBS $8.00 $ 1,296.00 150 $ 1,200,00 64 Testing Forcemain 1 LS $750.00 $ 750.00 1 $ 750.00 Total Bid Schedule "C" $ 23,eza.uu a rsra scneame ITEM NO. u - w-ruram ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACTAMOUNT USED TO DATE EXTENSION 42 Connect To ExistingWatermain 2 EA $1,000.00 $ 2,000.00 1 $ 1,000,00 43 Salvage And Reinstall Hydrant, 6" Pipe And 6" Gate Valve 1 LS $2,200.00 $ 2,200.00 1 $ 2,200.00 44 Hydrant 2 EA $3,700.00 $ 7,400.00 3 $ 11,100.00 45 8" Watermain Ductile Iron Cl 52 171 LF $40.00 $ 6,840.00 168 $ 6,720.00 46 10" Watermain Ductile Iron Cl 52 115 LF $48.00 $ 5,520.00 83 $ 3,984,00 47 16" Watermain Ductile Iron .C152 1,029 LF $67.00. $ 68,943.00 1,050 $ 70,350,00 48 6" Watermain Ductile Iron C152 23 LF $35.00 $ 805.00 46 $ 1,610.00 49 6" Gate Valve And Box 2 EA $1,350.00 $ 2,700.00 31 $ 4,050.00 50 8" Gate Valve And Box 1 EA $1,800.00 $ 1,800.00 1 $ 1,800.00 51 10" Gate Valve And Box 1 EA $2,550.00 $ 2,550.00 1 $ 2,550.00 52 16" Butterfly Valve and Box 2 EA $3,000.00 $ 6,000.00 2 $ 6,000.00 53 Watermain Fittings 4,890 LBS $3.50 $ 17,115.00 5,545 $ 19,407.50 54 Testin Watermain 1 LS $750,00 $ 750.00 1 $ 750.00 Total Bid Schedule "D" $ 124,623.UU IN ls-r,orr.ao mange ITEM NO. uruer rrr ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACTAMOUNT USED TO DATE EXTENSION 1 2104.507 Relocate Concrete Overflow Structure 1 LS $1,572.00 $ 1,572.00 1 $ 1,572.00 2 2105.543 Stabilizing Aggregate 326 TON $43.19 $ 14,079.94 326.0 $ 14,079.94 3 2211.501 Aggregate Base Class 5 Mod -142 TON $13.00 $ 1,846.00 $ - 4 2502.541 6" PVC Pie Drain 70 LF $24.00 $ 1 680.00 70 $ 1,680.00 Total Chage Order #1 S:1Municip0A0TSEGO\393\PAY ESTIMATES\OT393 PE PE-2 PAY ESTIMATE #4 CITY OF OTSEGO 80T STREET NE IMPROVEMENT PROJECT (Maciver Ave. to Marlow Ave.) Bid Schedule "A" Bid Schedule'B" Bid Schedule "C' Bid Schedule "D" Chage Order #1 TOTAL Total Work Completed to Date LESS 5% RETAINAGE: LESS PAY ESTIMATE #1: LESS PAY ESTIMATE #2: LESS PAY ESTIMATE #3: WE RECOMMEND PAYMENT OF: APPROVALS: CONTRACTOR: BURSCHVILLE CONSTRUCTION, INC. Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. ENGINEER: HAKANSON ANDERSON Certification by Engineer: We recommend payment for work and quantities as shown. OWNER: CITY OF OTSEGO $ 574,797.43 $ 67,711.20 $ 23,229.00 $ 124,623.00 $ 16,486.94 $ 806,846.57 $ 445,113.06 $ 65,772.33 $ 23,014,00 $ 131,521.60 $ 17,331.94 $ 682,762.83 $ 682,762.83 $ 34,137.64 $ 111,009.40 $ 129,160.65 $ 165,295.87 $ 243,159.26 S:\Munic1paM0TSEG0\393\PAY ESTIMATES\OT393 PE PE-3 STATE AID FOR LOCAL TRANSPORTATION CHANGE ORDER Rev.July 2010 Page 1 of 1 Street Project Minn. Proj. N/A _ LO No. 1 _80th Project Location: 80th Street from 500' west of Maciver Ave to Marlowe Ave, Otsego, MN Local Agency: City of Otsego Local Project No. 15-07 Contractor: Burschville Construction, Inc. Contract No. Address/City/State/Zip: 11440 8th Street NE PO Box 65 Hanover, MN 55341 Total Change Order Amount $ ' $15,485.94 In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions: The edge of the existing Overflow Structure near intersection of 80th Street and Maciver Avenue is in the way of the new curb and gutter. This structure shall be moved approximately 8' south, into the pond. All labor and materials associated with this work shall be measured as lump sum and paid as Pay Item 2104.507-Relocate Concrete Overflow Structure. Import and install 12 inches of 3" crushed concrete stabilizing aggregate along interim lift station driveway from approximately 350 feet south of the lift station to the lift station (350' x V thick x 13' wide = 4,550 CF). In the areas that receive the 12 inches of stabilizing aggregate the class 5 shall be reduced from 12" thick to 6" thick (350' x 0.5' thick x 12' wide = 2,100 CF). All labor and materials associated with this work shall be measured per TON and paid as Pay Item 2105.543-Stabilizing Aggregate. To eliminate standing water along the west of the interim lift station a 6" PVC Culvert crossing(s) under interim lift station driveway shall be installed to drain to the drainage swale east of the driveway. All labor and materials associated with this work shall be measured per LF of draintile and paid as Pay Item 2502.541-6" PVC Pipe Drain. Change Order 1 Estimate Of Cost: (include any increases or decreases in contract items, any negotiated or force account items.)<< **Group/Fundi ng Category Item No. — — Description Unit Unit Price + or— Quantity + or — Amount $ 2104.507 Relocate Concrete Overflow Structure LS $1,572.00 1 J $1,572.00 2105.543 Stabilizing Aggregate TON $43.19 326 $14,079.94 2211.501 Aggregate Base Class 5 Mod TON $13.00 -142 -$1,846.00 2502.541 6" PVC Pipe Drain LF $24.00 70 _ $1,680.00 Net Change for Change Order No. 1 $15,485.94 Approved by Project Engineer: Print Name: Approved by Contractor: Print Name: Distribution: Project Engineer (Original), Contractor (copy) Date: Phone: Date: Phone: