Loading...
ITEM 3.9G Lift Station Project #16-060 OtsTe FV o MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner November 14, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda Interim City Administrator Flaherty 3.9G AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of payment in the amount of $43,269.41 for the E-8 Interim Lift Station Proiect, Citv Proiect No. 16-06 to Burschville Construction, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: This payment is being made for work completed through October 315t, 2016. Burschville Companies, Inc. and their subcontractors have completed the connection to the all the forcemain, watermain and sanitary sewer lines, installed the both lift station manholes, Lift Station Appurtenances, Pumps and the Electrical Enclosure. Wright Hennepin Coop has recently placed power poles along the lift station driveway and is in the process of providing power to the lift station. Once the lift station has received power the rest of the project can be completed. Also, final grading and turf establishment remain to be completed. This payment includes Change Order #1 in the amount of $12,047.75, with an actual amount of $14,036.75 for revisions to the interim lift station driveway typical section due to poor in -place soils. This pay estimate (#2) is for $43,269.41. Total work completed to date is $115,021.75. Total original contract amount of the project was $119,400.00. With Change Order #1 the total contract amount is now $131,447.75. SUPPORTING DOCUMENTS: X ATTACHED NONE Pay Estimate No. 2 Change Order #1 POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve change order #1 and for payment to Burschville Construction, Inc. in the amount of $43,269.41 for the E-8 Interim Lift Station Project, City Project No. 16-06. BUDGET INFORMATION FUNDING: BUDGETED: Agreement with ISD #728 This project was not budgeted. PAY ESTIMATE #2 CITY OF OTSEGO E-8 School Interim Lift Station November 8, 2016 Honorable Mayor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 RE: E-8 School Interim Lift Station Contractor: Burschville Construction, Inc. Contract Amount: $119,400.00 Award Date: April 27, 2016 Completion Date: October 31, 2016 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Burschville Construction, Inc. Rid Schedule "A" ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE I CONTRACTAMOUNT USED TO DATE EXTENSION 1 Site Grading 1 LS $3,500.00 $ 3,500.00 0.5 $ 1,750.00 2. Aggregate Base Class 5 340 TON $14.00 $ 4,760.00 340 $ 4,760.00 3 Turf Establishment 1 LS $3,000.00 $ 3,000.00 $ 4 Connect to Existing Gravity Sewer 1 LS $100.00 $ 100.00 $ 5 Conned to Existing Forcemain 1 LS $500.00 $ 500.00 1 $ 500.00 6 Lift Station .Appurtenance 1 LS $3,000.00 $ 3,000.00 1 $ 3,000.00 7 72" Diameter Manhole 0-8' 1 EA $46,000.00 $ 46,000.00 1 $ 46,000.00 8 60" Diameter Manhole 0-8' 1 EA $.13,100.00 $ 13,100.00 1 $ 13,100.00 9 5 HP Pumps 2 EA $4,000.00 $ 8,000.00 2 $ 8,000.00 10 72" Diameter Manhole Additional Depth 13 VF $325.00 $ 4,225.00 13 $ 4,225.00 11 60" Diameter Manhole Additional Depth 2 VF $300.00 $ 600.00 5 $ 1,500.00 12 Forcemain DIP Fittings 148 LBS 1 $5.00 $ 740.00 185 $. 925.00 13 4" HDPE Forcemain DR11 AWWA CP06 55 LF $35.00 $ 1,925,00 55 $ 1,925.00 14 8" PVC Sanitary Sewer 14 LF $50.00 $ 700.00 26 $ 1,300.00 15 Electrical Enclosure 1 LS $28,000.00 $ 28,000.00 0.5 $ 14,000.00 16 SCADA 1 LS $1,250.001 $ 1,250.00 $ Total Bid Schedule "A" $ 119,400.00 $ 100,985.00 rhe..e nrde.#1 Na ITEM DESCRIPTION QUANTITY I UNIT PRICE CONTRACT AMOUNT DATE EXTENSION 1 Stabilizing A re ate 325 1 TON $43A9 $ 14,036.75 325.0 $ 14,036.75 2 lAggregate Base Class 5 Mod 1 -153 1 TON 1 $13.00 $ 1,989.00 $ Bid Schedule "A" Change Order #1 TOTAL Total Work Completed to Date LESS 5% RETAINAGE: LESS PAY ESTIMATE #1 WE RECOMMEND PAYMENT OF: APPROVALS: Total Bid Schedule."D" $ 12,047.75 $ 119,400.00 $ 12,047.75 $ 131,447.75 CONTRACTOR: BURSCHVILLE CONSTRUCTION, INC. Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. Title: Date ENGINEER: HAKANSON ANDERSON Certification by Engineer: We recommend payment for work and quantities as shown. $ 14,036.75 $ 100,985.00 $ 14,036.75 $ 115,021.75 $ 115,021.75 $ 5,751.09 $ 66,001.25 $ 43,269.41 S:\Municip0A0TSEG0\639\PAY ESTIMATES\OT639 PE #2 PE - 1 PAY ESTIMATE #2 CITY OF OTSEGO E-8 School Interim Lift Station OWNER: CITY OF OTSEGO Sig Title: Date S:\Municipal\A0TSEG0\639\PAY ESTIMATES\OT639 PE #2 PE-2 STATE AID FOR LOCAL TRANSPORTATION Rev.July2010 CHANGE ORDER Page 1 of 1 E-8 Interim Lift Station Project Minn. Proj. N/A CO No. 1 Project Location: 900 feet north of the Maciver Ave to 80th Street Intersection, Otsego, MN Local Agency: City of Otsego Local Project No. 16-06 Contractor: Burschville Construction, Inc. Contract No. Address/City/State/Zip: 11440 8th Street NE PO Box 65 Hanover, MN 55341 Total Change Order Amount $ $12,047.15 In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions: Import and install 12 inches of 3" crushed concrete stabilizing aggregate for interim lift driveway/tunr-around from approximately 4,534 SF. (4,534 SF x 1' thick = 4,534 CF). In the areas that receive the 12 inches of stabilizing aggregate the class 5 shall be reduced from 12" thick to 6" thick (4,534 SF x 0.5' thick = 2,267 CF). All labor and materials associated with this work shall be measured per TON and paid as Pay Item 2105.543-Stabilizing Aggregate. Change Order-1 Estimate Of Cost: (Include any increases ordecreases in contract items, any negotiated or force account items) **Group/Fundi : + or — + or — ng Category I Item No. i Description Unit Unit Price Quantity Amount $ 2105.543 Stabilizing Aggregate TON $43.19 325 $14,036.75 2211.501 Aggregate Base Class 5 Mod I TON $13.00 I -153-$1,989.00 Net Change for Change Order No. 1 $12,047.15 Approved by Project Engineer: Print Name: Approved by Contractor: Print Name: Distribution: Project Engineer (Original), Contractor (copy) Date: Phone: Date: Phone: