ITEM 6.3 Kadler Ave Water Main ExtensionOtkzo MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner November 14, 2017 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner Interim City Administrator 6.3 Flaherty AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends City Council approve ordering plans and specifications for Kadler Avenue Water Main Extension ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No I No BACKGROUND/JUSTIFICATION: The Kadler Avenue water main extension has been discussed since 2012 due to issues with peak water use times and lack of urban type fire flows in the Riverwood National development. The project was added to and subsequently removed from the 2016 CIP due to the adoption of irrigation ban for Riverwood National during peak hours and determination that existing West Water District system could meet it needs until 2019 at the current rate of development. With the continued development within the entire West Water District, Riverwood National needs for urban type fire flow and peak demands and potential industrial development along southern reaches of Kadler Avenue, the project is proposed to be completed in 2017. The Kadler Avenue water main extension project consists of boring 16" and 12" trunk water main from 70th St to 90t' St either alongside or under Kadler Ave. Boring rather than open trench is proposed to minimize disruption to traffic or require replacement of street. There are some existing homes and buildings close to the ROW that also could be impacted by open trench. If some areas of Kadler Avenue are impacted by potential reconstruction, open trench will be used. The project will also include rehabilitation of Well #7 (located in Riverwood National) to increase the capacity of the well. A higher production pump will be installed within Well #7, capable of suppling water to Water Tower #2 thus adding capacity to the West Water District. With completion of the project, it is projected at current development pace; the West Water District should have adequate water supply through 2023 and possibly longer dependent on how water conservation efforts such as odd/even irrigation affect peak day demands. The project is estimated to cost $1,525,000. The project timeline is as follows: City Council Orders Plans and Specifications Prepare Plans and Specifications City Council Approves Plans and Specifications Open Bids City Council Awards Project Construction SUPPORTING DOCUMENTS: X ATTACHED Location Map Estimate of Project Cost 11/14/16 November/December/January 1/23/17 2/21/17 2/27/17 May/June MOTION: (Please word motion as you would like it to appear in the minutes.) XNONE Motion to order Hakanson Anderson to prepare plans and specifications for Kadler Avenue Water Main Extension and Well #7 Improvements BUDGET INFORMATION FUNDING: BUDGETED: X YES 601- Water Utility NO The project is estimated to cost $1,525,000. The project timeline is as follows: City Council Orders Plans and Specifications Prepare Plans and Specifications City Council Approves Plans and Specifications Open Bids City Council Awards Project Construction SUPPORTING DOCUMENTS: X ATTACHED Location Map Estimate of Project Cost 11/14/16 November/December/January 1/23/17 2/21/17 2/27/17 May/June MOTION: (Please word motion as you would like it to appear in the minutes.) NONE Motion to order Hakanson Anderson to prepare plans and specifications for Kadler Avenue Water Main Extension and Well #7 Improvements BUDGET INFORMATION FUNDING: 601- Water Utility BUDGETED: X YES 7,re Ot�e TY OF o MINNESOTA 2017 Watermain Extension Project Kadler Avenue - Directional Bore DescriptionItem Connect to Existing Watermain 2 Ea $ 1,500.00 ... $ 3,000.00 Mobilization 1 Ea 5% $ 60 000.00 Bond & Insurance 1 Ea 5% $ 60,000.00 6" HDPE 280 LF $ 25.00 $ 7,000.00 12" HDPE 5280 LF $ 65.00 $ 343,200.00 16" HDPE 5280 LF $ 105.00 $ 554,400.00 12" Butterfly Valve 4 Ea $ 5,000.00 $ 20,000.00 16" Butterfly Valve 4 Ea $ 6,000.00 $ 24,000.00 6" Hydrant 14 Ea $ 3,500.00 $ 49,000.00 6" Gate Valve 14 Ea $ 1,500.00 $ 21,000.00 Watermain Fittings 3675 LB $ 3.50 $ 12,862.50 Traffic Control 1 LS $ 5,000.00 $ 5,000.00 Upgrade Well #7 1 LS $ 50,000.00 $ 50,000.00 Restoration 1 LS Construction.. $ 10,000.00 $ 10,000.00 Contingency 10% $ 121,946.25 Overhead Project Total 15% $ 182,919.38 $ 1,524,328.13 h—AlAndersonson