Loading...
ITEM 6.2 Resolution 16-98otS11.1: O MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works Ron Wagner, City Engineer November 14, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Ron Wagner, City Engineer Adam Flaherty, Interim City 6.2 Administrator AGENDA ITEM DETAILS RECOMMENDATION: Approve Resolution ordering the preparation of a feasibility report regarding improvement of streets within Wokson Hills (58th St, 59th St and Quenroe Avenue) and Autumn Woods (56th St, 57t1i St and Quilley Avenue). ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No I No BACKGROUND/JUSTIFICATION: The streets within Wokson Hills and Autumn Woods Additions are paved. The existing roadway consists of a 2 %" of bituminous surface approximately 24' feet wide. The pavements are 30 and 29 years old respectively and are experiencing block, alligator, and thermal cracking due to its age. The value of existing housing will be positively benefited by accessing a bituminous paved street in good condition. The existing street surfaces of Wokson Hills and Autumn Woods have PCI (Pavement Condition Index) Ratings of 54 and 66 respectively, which are below the average in the City of Otsego. Typically, pavements within PCI Ratings of 50 or less are in their final stages of useful life and will need to be reconstructed or overlayed in the very near future. Improving the streets prior to the PCI falling below a PCI rating of 50 lessens the number and severity of interim patches or potholes repairs that will occur if the pavement is allowed to deteriorate. It will also lessen the cost to complete the street renewal thus the assessment amount. Staff is requesting a feasibility report be completed to determine the best method of street renewal, the estimated project costs, and the estimated assessments to the benefiting properties. Potential Project timeline is as follows: Council Orders Feasibility Report 11/14/16 Evaluate Project Condition for Areas in need of Patches and center line culvers in need of replacement November/December Council Received and Accepts Feasibility Report and Sets Public Improvement Hearing Date Public Improvement Hearing and Order Plans and Specifications Council Approves Plans and Specifications and Orders Advertisement for Bids Open Bids Council Awards Project Construction Assessment Hearing SUPPORTING DOCUMENTS: X ATTACHED • Resolution 2016-98 • Estimate of Project Cost • Photos of Wokson Hills Existing Pavement • Photos of Autumn Woods Existing Pavement 12/12/16 1/23/17 2/13/17 3/21/17 3/27/17 May and June August or September ❑ NONE Motion: Approve Resolution 2016-98 ordering the preparation of feasibility report regarding improvement of streets within Wokson Hills (58th St, 59th St and Quenroe Avenue) and Autumn Woods (56th St, 57t' St and Quilley Avenue). BUDGET INFORMATION FUNDING: BUDGETED: X YES Assessments NO Pavement Management Fund - 201 RESOLUTION NO. 2016 -98 RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR THE IMPROVEMENT OF STREETS WITHIN WOKSON HILLS (59T" ST, 58T" ST AND QUENROE AVENUE) AND AUTUMN WOODS (56T" ST, 57T" ST AND QUILLEY AVENUE) WHEREAS, it is proposed to improve streets within Wokson Hills (58th St, 59th St and Quenroe Avenue) and Autumn Woods (56th St, 57th St and Quilley Avenue), which are respectively thirty and twenty nine years old and are in need of improvement, and to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO, MINNESOTA; That the proposed improvement be referred to Hakanson Anderson for study and that they are instructed to report to the council with all convenient speed advising the council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted by the council this 14th day of November, 2016. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk ot392Res_0rderingFeasRpt Ot§TV e QF _ MINNESOTA) 0 2017 Renewal Project Wokson Hills & Autumn Woods Additions Overlay Item Description 1/2" Overlay Estimated 1750 .- Tons Cost per Unit $ 55.00 .-. Total Per Unit $ 96,250.00 3 1/2" Patch*** 320 Tons $ 80.00 $ 25,600.00 Full Depth Saw Cut 120 LF $ 2.00 $ 240.00 Mill 1 1/2" Deep 850 SY $ 5.00 $ 4,250.00 Remove Pavement 1550 SY $ 5.00 $ 7,750.00 Tack Oil 990 Gallons $ 3.00 $ 2,970.00 Subgrade Excavation *** 400 CY $ 20.00 $ 8,000.00 Class 5 *** 380 Ton $ 15.00 $ 5,700.00 Culvert Removal 0 LF $ 5.00 $ - Culvert Replacement 0 LF $ 50.00 $ - Shouldering 250 Ton $ 25.00 $ 6,250.00 Striping 0 LF $ 0.10 $ - Turf Establishment 1 LS $ 900.00 $ 900.00 Mobilization Construction Total.4 Overhead ' • • 1 . • 1 LS $ 6,300.00 $ 6,300.00 1 11 15% $ 24,631.50 . I:. :� 1 Parcels 61 $ 1,594.32 EA $ 97,253.37 *** Contingent on patching required Hakanson ATHAnderson t- ':�t.I �� `,��f, -� . .i i ,i. ,-� i I ... I t, �. i ,. i i� I ��.F I :1 I r OL A T� •t i`r 1 I + G f f 1 i 1 S r • e f ` � � (` `. its •I � - _ �' S J.- F h i t - t- _ �i� Alt - • i • ,,,,,,yyy��� r �J v� �t NAGELL APPRAISAL & CONSULTING 12805 Highway 55 Minneapolis: 952-544-8966 Plymouth, MN 55441 St. Paul 651-209-6159 Established in 1968 Central Fax 952-544-8969 Client: City of Otsego November 9, 2016 Attn: Andrew MacArthur, City Aty, 3601 Thurston Avenue North #103 Anoka, MN 55303 RE: A letter report regarding the special benefit if any for a street improvement project with patch and overlay. Wokson Hills & Autumn Woods Otsego, MN Dear Andrew: Thank you for your interest in obtaining services regarding the properties above. Per our conversation, you indicated a preliminary opinion of market benefit if any to the adjoining properties in the above project. Report Use: The report use is to assist the city for guidance regarding special assessment determination for street improvement project. Value Type: This report is not an appraisal, but rather provides a preliminary letter giving a general range of market benefit if any for properties like those in the project area. Property Description: About 60 residential parcels and lots with varying site sizes. Contact for access, Not necessary. Scope of Report: (1) Drive by viewing of the subject properties and view the neighborhood. (2) Note the physical and/or economic factors that could affect the properties. (3) Comment on market benefit if any based on observations of the market. (4) Provide a general range of benefit if any for properties like those in the project area. No specific sales data will be collected for this assignment. The general market comments are based on past appraisals, experience and market information. Report Format: A Letter Report will be used. It has short statements and descriptions including appropriate photos, maps and exhibits are included. A PDF copy of the report plus two hard copies of report will be provided. Fee: The fee is $900. Any meetings, owner contact, appraisal reports, any discovery, preparation and testifying would be extra and billed at $150 per hour. Client named above is responsible for payment in a timely manner. Due Date: The report can be completed in 3 weeks or by 1-15-17 from signed confirmation. Information needed 1 by the appraiser: Feasibility report, maps and description of before and after conditions of the road project. Our company has 12 employees and has been in business since 1968 and has sufficient knowledge, experience, education, resources and contacts to competently complete this assignment. Neither the employment to make this report, nor the compensation for it, is contingent upon the findings. If you agree to the above terms, please sign below and return by fax or mail. If you have any additional questions, please do not hesitate to contact me. Sincerely, Signature William R. Waytas, SRA, CRP Certified General 4000813, MN Date www.nagelimn.com