Loading...
ITEM 6.1A Wokson Hills/Autumn Woods0 OtS11.F O MINNESOTA V 17=17_l1.wk fA-kiki101;i77ivi1e11111Us] k1 Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works Ron Wagner, City Engineer January 9, 2017 PRESENTER(s): REVIEWED BY: ITEM #: Ron Wagner, City Engineer Adam Flaherty, Interim City 6.1A Administrator AGENDA ITEM DETAILS RECOMMENDATION: Approve Resolution receiving feasibility report regarding improvement of streets within Wokson Hills (59th Street, 58th Street and Quenroe Avenue) and Autumn Woods (56th Street, 57th Street and Quilley Avenue) and set a date for a Public Hearing for residents to be presented project scope and possible assessment costs. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No I Yes BACKGROUND/JUSTIFICATION: The streets within Wokson Hills and Autumn Woods are paved. The existing roadway consists of a 2 %" of bituminous surface approximately 24' feet wide. The pavement is 28-30 years old and is experiencing extensive block and thermal cracking as well as some surface raveling due to its age. The value of existing housing is positively benefited by accessing a bituminous paved street in good condition. The existing street surface in Wokson Hills and Autumn Wood have PCI (Pavement Condition Index) Ratings of 51 and 57 respectively, well below the average in the City of Otsego. Typically, pavements with PCI Ratings of 50 or less are in their final stages of useful life and will need to be reconstructed or overlaid in the very near future. City Council authorized the preparation of a Feasibility Study to determine what needs to be completed to remedy the issues, determine a cost estimate and allocate costs. A public hearing to present the study to the residents will need to be held at a council meeting (February 13`h) to continue forward with the project with the potential for assessments in accordance with MN State Statue 429. A resolution will be presented later during this meeting, to determine if the council wishes to prepare plans and specifications for the purpose of obtaining bids for the project. The total estimated project cost is $205,373.00 and is proposed to be funded using approximately 50% assessments and 50% City funds. The CIP estimate for this project was $194,507.00 Estimated assessments could vary some, dependent on a City Council decision assessing one 40 -acre parcel two assessments and the ability of assessing a MnDOT owned property in the Northwest corner of 53rd Street and Quilley Avenue. The feasibility report includes two assessments for the 40 -acre parcel and no assessment for the MnDOT parcel at this time for a total of 60 assessment units. SUPPORTING DOCUMENTS: X ATTACHED ❑ NONE • Feasibility Report • Resolution 2017-03 PCICSIRI P MOTION Please word motion as you would like it toappear in the minutes. Motion to approve Resolution 2017-03 Receiving Feasibility Report regarding the Improvements within the Wokson Hills And Autumn Woods Subdivisions and calling a Public Hearing for residents to be presented project scope and possible assessment costs. BUDGET INFORMATION FUNDING: BUDGETED: X YES Pavement Management Fund - 201 o NO ?r OtCITY OF e o MINNESOTA FEASIBILITY REPORT FOR 2017 OTSEGO STREET RENEWAL PROJECT OF PROPOSED STREET OVERLAYS WITHIN WOKSON HILLS AND AUTUMN WOODS SUBDIVISIONS CITY OF OTSEGO, MINNESOTA January 2017 Prepared by: —Hal<anson ���Anderson 3601 Thurston Avenue Anoka, MN 55303 Telephone: 763-427-5860 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under State of Minnesota Statutes Sections 326.02 to 326.16. Z 2 26052 Ronald J. ner Reg. No. Date TABLE OF CONTENTS TITLE SHEET TABLE OF CONTENTS I. INTRODUCTION.......................................................................................1 II. PROPOSED PROJECT............................................................................1 111. INITIATION................................................................................................ 2 IV. FEASIBILITY.............................................................................................2 V. RIGHT-OF-WAY / EASEMENTS...............................................................2 VI. PERMITS..................................................................................................2 VII. COMPLETION...........................................................................................2 VIII. PRELIMINARY PROJECT SCHEDULE....................................................3 IX. ESTIMATED PROJECT COST.................................................................4 X. PROPOSED FUNDING.............................................................................4 XI. ESTIMATED ASSESSMENT.....................................................................5 XII. CONCLUSION AND RECOMMENDATION..............................................6 EXHIBITS LOCATIONMAP..................................................................................................A PHOTOS.............................................................................................................. B PROPOSEDSTREET SECTIONS....................................................................... C BENEFITING PROPERTIES MAPS..................................................................... D 2 PROPOSED STREET OVERLAY WITHIN WOKSON HILLS AND AUTUMN WOODS SUBDIVISIONS CITY OF OTSEGO, MN INTRODUCTION The purpose of this Feasibility Report is to present the City of Otsego with a preliminary examination of municipal street improvements for streets within Wokson Hills and Autumn Woods subdivisions in Otsego, Minnesota (see Exhibit A — Project Location Map). The report discusses the proposed scope of improvements, preliminary cost estimates and a project schedule. The report has been prepared in compliance with Minnesota State Statutes 429 for projects resulting in special assessments. Wokson Hills was constructed in 1987. The Autumn Woods Additions were constructed between 1988 and 1989. The area south of 60th Street and east of TH101, which includes both Wokson Hills and Autumn Woods, was part of Frankfort Township until the City of Otsego annexed the area in 1994. The conditions of the streets within Wokson Hills and Autumn Woods have deteriorated to a point that an overlay is recommended. The amount of crack filling and patching necessary is increasing and becoming substantial (see Exhibit B — Photos). If the streets are not overlayed soon the condition of the existing pavement will be too poor to overlay and a full depth reclaim would be necessary. The existing street surface in Wokson Hills and Autumn Wood have PCI (Pavement Condition Index) Ratings of 51 and 57 respectively, well below the average in the City of Otsego. Typically, pavements with PCI Ratings of 50 or less are in their final stages of useful life and will need to be reconstructed or overlayed in the very near future. The Wokson Hills and Autumn Woods streets have been included on the Street Renewal list and included in the Capital Improvement Plans (CIP) for several years. Due to this, the City Council authorized a Feasibility Report be completed to determine costs and potential sources of funding. The existing roadway consists of a 2 1/2" of bituminous surface approximately 24' feet wide. 2 1/2" thick bituminous does not meet the current requirement for residential streets which is a minimum of 3'/2". The pavement is 28-30 years old and is experiencing extensive block and thermal cracking as well as some surface raveling due to its age, all of which an overlay can be a good remedy. Cracks or areas that dip or heave and areas where the pavement is disintegrating (pothole) would need to be removed and patched prior to the overlay. II. PROPOSED PROJECT The proposed street improvement project consists of improving streets within Wokson Hills, specifically 59th Street, Quenroe Avenue, and 58th Street as well as streets within Autumn Woods, specifically Quilley Avenue, 56th Street, and 57th Street. Improvement work includes full depth patching in required areas, bituminous milling and placement of a 1 '/2" overlay and topsoil shouldering. The proposed street typical section would be in general conformance with current City Street Standards. The street section would be a paved rural section with no curb and gutter. Existing driveways would be matched (elevation and material) with the overlay (see Exhibit C). Surface water within the project area will be conveyed the via the existing storm sewer system through a combination of driveway culverts, ditches and cross culverts. Center line culverts will be reviewed for structural integrity and replaced if needed. No ditch work or driveway culvert replacement is included as part of this project. III. INITIATION The feasibility report was initiated by the City Council due to issues regarding the age and pavement condition of the streets. IV. FEASIBILITY From an engineering standpoint, the project is feasible, and the value of existing housing is positively benefited by accessing a bituminous paved street in good condition. It can be accomplished as proposed, and need not be constructed in conjunction with any other project. The City and the persons assessed should review the project for benefit to determine the economic feasibility of the proposed improvements. V. RIGHT-OF-WAY / EASEMENTS The existing streets and proposed street improvements are located within the existing 66 foot wide right-of-way. VI. PERMITS No permits would be required to accomplish the work. VII. COMPLETION This project is proposed to be completed during the 2017 construction season. 2 VIII. PRELIMINARY PROJECT SCHEDULE The preliminary project schedule for the 2017 Otsego Street Renewal Project: Table I City of Otsego Streets within Wokson Hills and Autumn Woods Preliminary Project Schedule 2017 1. City Council Receives Feasibility Report and Schedules Public Hearing and Orders Plans and Specs January 9 2. City Council Holds Public Hearing for February 13 Improvement Project 3. City Council Approves Plans and Specifications and City Council Approves March 20 and Authorizes to Advertise for Bid 4. Open Bids April 18 5. City Council Considers Award of April 24 Contract or Discontinues Process 7. If Awarded, Contractor Completes By August 31 Construction 8. City Council Holds Assessment Hearing September or October and Adopts Assessment Roll 3 IX. ESTIMATED PROJECT COST Included in this report is a detailed estimate of construction costs for the street improvements. The costs quoted herein are estimates only and are not guaranteed prices. The quantities are estimates also. The contractor will be paid only for work completed. The cost estimates are based on previous projects costs. Table II estimates the cost for the paved rural section. Table II City of Otsego Overlay of Streets within Wokson Hills and Autumn Woods Preliminary Cost Estimate - Rural Section X. PROPOSED FUNDING The funding for this project is expected to be provided by two sources, the City of Otsego and the benefiting property owners. The project costs could be split between the City of Otsego and the benefiting properties (see Exhibit D). The benefiting property owners are proposed to be assessed approximately $102,686.40 and the City would provide the remaining 50% of the cost approximately $102,686.60. Past street renewal projects have been assessed this method since 2014. El Estimated Unit Cost per Extended Total Per Item Description Quantity Mobilization 1 .- Unit LS $8,504.00 $ 8,504.00 Bituminous Pavement Removal 1202 SY $5.00 $ 6,010.00 Sawing Bit Pavement (Full Depth) 848 LF $2.50 $ 2,120.00 Mill Bituminous Surface (1.5") 1914 SY $5.00 $ 9,570.00 Bituminous Material For Tack Coat 1067 GAL $3.00 $ 3,201.00 Type SP 9.5 Wearing Course Mixture (2,C) 1720 TON $55.00 $ 94,600.00 Type SP 12.5 Non Wear Course Mixture (2,C) - PATCHES 509 TON $80.00 $ 40,720.00 Remove CMP Culvert 50 LF $5.00 $ 250.00 24" RC Pipe Apron 1 EA $750.00 $ 750.00 24" RC Pipe Sewer Design 3006 CL III 48 LF $50.00 $ 2,400.00 Traffic Control 1 LS $90.00 $ 500.00 Boulevard Topsoil Borrow 135 CY $56.00 $ 7,560.00 Turf Establishment 1 LS $2,000.00 $ 2,00.00 Construction Total00 Overhead 15% $ 26,788.00 X. PROPOSED FUNDING The funding for this project is expected to be provided by two sources, the City of Otsego and the benefiting property owners. The project costs could be split between the City of Otsego and the benefiting properties (see Exhibit D). The benefiting property owners are proposed to be assessed approximately $102,686.40 and the City would provide the remaining 50% of the cost approximately $102,686.60. Past street renewal projects have been assessed this method since 2014. El XI. ESTIMATED ASSESSMENT There are a total of 60 potential benefiting properties with this project. The per unit method of assessment was used as all the benefiting properties are single family homes and use the street in much the same manner, with the exception of one property. This other property is a 40 acre parcel that is currently being farmed. The main accesses to this property appears to be a field access off of Quenroe Avenue in Wokson Hills but the property does also have access to Quilley Avenue in Autumn Woods and therefore will receive 2 assessments in this report. MnDOT owns the property at the northwest corner of the intersection not Quilley Avenue and 53rd Street. MnDOT cannot be assessed for these improvements and therefore this property was removed from the benefiting property total. Therefore, by dividing the total benefiting property assessment cost ($102,686.40) by 60, the number of assessable units, an assessment value is obtained. The estimated cost per unit was determined to be $1,711.44 (Table III Benefiting Property Assessment Summary). Table III Benefiting Property Assessment Summary for Streets within Wokson Hills and Autumn Woods Subdivisions Ref # PID# NAME PROPERTY ADDRESS PROPOSED ASSESSEMENT 1 118-134-001010 Thomas J & Jennifer L Ind kiewicz 16532 59th St NE $1,711.44 2 118-134-001020 Keith R Ernst 16570 59th St NE $1,711.44 3 118-134-001030 Harry T Christensen 16590 59th St NE $1,711.44 4 118-134-001040 Kevin J & Kimberl L Peterson 16620 59th St NE $1,711.44 5 118-134-001050 Robert C & Janet M Goble 16650 50th St NE $1,711.44 6 118-134-001060 Mark L Gordon 16678 59th St NE $1,711.44 7 118-134-001070 Donald G & Mary C Schmaus 16716 59th St NE $1,711.44 8 118-134-001080 Jeffrey R & Donna L Krueger 16736 59th St NE $1,711.44 9 118-134-002010 Gerald B & Susan L Brown 16551 59th St NE $1,711.44 10 118-134-002020 Michael S & Sandra Moen 16579 59th St NE $1,711.44 11 118-134-002030 Vern F & Laurie A Gressel 1659759th St NE $1,711.44 12 118-134-002040 Jeffrey P Schneider 16637 59th St NE $1,711.44 13 118-134-002050 Bruce J & Maria A Eilers 16665 50th St NE $1,711.44 14 118-134-002060 Thomas L &Vivian B Woitalla 16723 59th St NE $1,711.44 15 118-134-002070 Jill Wisner 5882 Quenroe Ave NE $1,711.44 16 118-134-002080 Kevin D & Denice M Kell 5804 Quenroe Ave NE $1,711.44 17 118-134-002090 Russell A & Robin L Smith 5800 Quenroe Ave NE $1,711.44 18 118-134-002100 Rusian & Natallia Liashko 16668 58th St NE $1,711.44 19 118-134-002110 Gary W Witthuhn & Tammie L Towle 16642 58th St NE $1,711.44 20 118-134-002120 Todd M & Debra L Jacobson 16610 58th St NE $1,711.44 21 118-134-002130 WesleyM Ness & Jill M Hennessey16580 58th St NE $1,711.44 22 118-134-003010 Kurt M Bauerly 16535 58th St NE $1,711.44 23 118-134-003020 Mark J Wolf 16581 58th St NE $1,711.44 24 118-134-003030 Steven D & Renae E Mcal ine 16611 58th St NE $1,711.44 25 118-134-003040 David R & Lois M LEE 16645 58th St NE $1,711.44 A 26 118-134-003050 Lucus Munn 16675 58th St NE $1,711.44 27 118-134-003060 Mark 0 & Denise J Wenz 16703 58th St NE $1,711.44 28 118-134-003070 Carrie L Pomeroy 1673558th St NE $1,711.44 29 118-135-002010 Bruce K & Jennifer L Folkens 5430 Quilley Ave NE $1,711.44 30 118-135-002020 Daryl A & Sahvanna I Caldwell 5480 Quilley Ave NE $1,711.44 31 118-135-002030 Jeffrey A & Kay A Carlson 5544 Quilley Ave NE $1,711.44 32 118-135-002040 Bruce A & Lois B Graham 5590 Quilley Ave NE $1,711.44 33 118-135-002050 Daniel S & Kari Hormann 5634 Quilley Ave NE $1,711.44 34 118-135-002060 Edmond A & Helen C Sworsky 5640 Quilley Ave NE $1,711.44 35 118-135-002070 Jennifer Erikson 5648 Quilley Ave NE $1,711.44 36 118-135-002080 Michael W & Abigail Hoffman 5650 Quilley Ave NE $1,711.44 37 118-135-002090 Justin Ende 16800 56th St NE $1,711.44 38 118-135.002100 Thomas A & Dawn C Kennedy 16820 56th St NE $1,711.44 39 118-135-002120 Patrick R & Denise M Wallensen 16840 56th St NE $1,711.44 40 118-135-002130 David J & Nancy C Riley 16850 56th St NE $1,711.44 41 118-135-002140 Michael G & Geralyn M Wiggins 16860 56th St NE $1.711.44 42 118-135-002150 John B & Kimberly F Remmen 5656 Quilley Ave NE 51,711.44 43 118-135-002160 Megan Cleary 16851 57th St NE $1,711.44 44 118-135-002170 Richard R & Nancy A Martin 16861 57th St NE $1,711.44 45 118-135-002180 Timothy M & Lynette M Neut ens 16871 57th St NE $1.711.44 46 118-135-002190 Kevin J & Carolyn A Brenny 1682457th St NE $1,711.44 47 118-135-001110 Christopher P & Stacey D Hyde 5681 Quilley Ave NE $1,711.44 48 118-136-001020 David J & Susan A Wiers alta 5661 Quilley Ave NE $1,711.44 49 118-136-001030 Seth S & Laura H Richter 5651 Quilley Ave NE $1,711.44 50 118-136-001010 Jeffrey F & Sheri H Mcginty 5649 Quilley Ave NE $1,711.44 51 118-135-001070 Brian C & Susan R Folkens 5645 Quilley Ave NE $1,711.44 52 118-135-001060 Eric D & Christy A Chapman 5641 Quilley Ave NE $1,711.44 53 118-135-001050 David J & Michelle M Bakke 5631 Quille Ave NE 51.711.44 54 118-135-001040 Charles P Tor erson 5609 Quilley Ave NE $1,711.44 55 118-135-001030 Bradley J & Stephanie J Groves 5571 Quilley Ave NE $1.711.44 56 118.135-001020 Marilyn M Post & John Lefebvre 5541 Quilley Ave NE $1,711.44 57 118-135-001010 Paul B & Lisa A Young 5491 Quilley Ave NE $1,711.44 58 118-172-001010 Sharleen Orth 5451 Quille Ave NE $1,711.44 59 118.802-024300 MnDOT 1671053rd St NE $0•00 60 118-802-021100 Fae E Jacobs & Loretta F Moos Unassigned $1,711.44 61 118.802-021100 Fae E Jacobs & Loretta F Moos Unassigned $1.711.44 $102,686.40 The assessment portion of the project would be approximately 50% of the total project. XII. CONCLUSION AND RECOMMENDATION This report analyzed the feasibility of improving streets within the Wokson Hills and Autumn Woods subdivisions. The proposed improvements are necessary, cost effective and feasible from a technical and engineering stand -point, and benefit the properties proposed as shown on Exhibit D. The project is proposed to be funded by assessing the benefiting properties as well as receiving funds from the City of Otsego. M. EXHIBIT A PROJECT LOCATION (I# ot§fgo TY OF MINNESOT LEGEND =STREETS TO BE OVERLAID EXHIBIT A tso o tso soo D.. M 2016 — 9:21m SCALE IN FEET K:\cad—eng\PROJ CM\4UNIOPAL\07392\2017\07392-2017 FEA SIUTYA.g OT39 2— 20 1 EXHIBIT B i ''' _ �` .lie• �r K '-"� - ' »l,r �'p AUTUMN WOODS A AUTUMN WOODS EXHIBIT C TYPICAL SECTIONS PROPOSED OVERLAY 12' 12' otCITY ®F sTA e o 1.5" BITUMINOUS WEAR TAPER TOPSOIL COURSE OVERLAY TACK TAPER TOPSOIL SHOULDER AS (LVWE45035B) SHOULDER AS NEEDED l.j NEEDED " PER FT. 3 PER FT, SEED SEED I EXISTING BITUMINOUS ROADWAY 2Y2" EXISTING GRAVEL BASE MILLING @ CONCRETE DRIVEWAY 20' TAPER I A 20' TAPER MILL YYLVVL- SECTION A -A I 6 ' .-1 0„ MILLING DEPTHS MILLING - BITUMINOUS DRIVEWAY 2" OVERLAY 3' (MIN) �p Jon04, ton — t0:01om K \cad_eng\PROJECTS\MUNIOPAL\01392\20n\07392-2017 FEA991JN.dvg . I-; a m 1111♦ ♦ ��i�i�i�i�i�i�i�i�i�i �i�i�i�i�i�i ���►��������������� A 1.0% MIN D,p 2 DEPTH MILL WEDGE 3' BACK FROM EXISTING EDGE OF ROAD OR SUFFICIENT DISTANCE TO PROVIDE A MINIMUM SLOPE. IF REQUIRED DISTANCE IS GREATER THAN 10' NOTIFY ENGINEER FOR DIRECTION. EXHIBIT C EXHIBIT D BENEFITING PROPERTIES (61) to CITY OF se o MINNESOTA LEGEND ® PROPOSED ASSESSED PROPERTY H 150 0 150 300 J.. 0+, 2017 — tome. SCALE IN FEET K\cad—mg\PROJECTS\MONIOPAL\01392\2017\OT392-2017 FEASBIUW.drg Currently MnDOT Owned And Not Included In Assessment Roll EXHIBIT D 392- RESOLUTION NO. 2017-03 RESOLUTION RECEIVING REPORT AND CALLING HEARING ON THE IMPROVEMENTS WITHIN THE WOKSON HILLS AND AUTUMN WOODS SUBDIVISIONS WHEREAS, pursuant to resolution 2016-98 of the council adopted November 14th, 2016, a report has been prepared by Hakanson Anderson Associates, Inc. with reference to the improvement of streets within Wokson Hills (59th Street, 58th Street and Quenroe Avenue) and Autumn Woods (56th Street, 57th Street and Quilley Avenue) and this report was received by the council on January 9th, 2017; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: The council will consider the making of such improvement in accordance with the report and the assessment of benefiting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes Chapter 429 with the estimated total cost of the improvement being $205,373. 2. A public hearing shall be held on such proposed improvements on the 13th day of February, 2017 in the council chambers of the city hall at 7:00 p.m. and the clerk shall give mailed and published notice of such hearing and improvement as required by law. Adopted by the council this 9th day of January, 2017. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk