Loading...
ITEM 6.1 Norin Landing Parkot NNESOTA DEPARTMENT INFORMATION Request for City Council Action ORGINATING DEPARTMENT: REQUESTOR: MEETING DATE Parks and Recreation Ross Demant, Parks and Recreation Director January 23, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Ross Demant, Parks and Adam Flaherty, Interim City 6.1 Recreation Director Administrator AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends proceeding with the preparation of plans, specifications and solicitation of bids for the construction of Norin Landing Park. Staff also recommends adopting a resolution of support for the application of the Department of Natural Resources Outdoor Recreation Grant. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No I No BACKGROUND/JUSTIFICATION: At the August 8th, 2016 Otsego City Council meeting, the Council voted unanimously to approve a proposal from SRF Consulting Group, Inc. for professional park development services for Norin Landing Park. Those services include meetings with the Commission, Council, and Staff, developing conceptual designs, assisting in the facilitation of a neighborhood meeting, preparing plans and specifications for the selected park concept, and administration of the bid process. Hakanson Anderson will be preparing the plans and specifications for the boat ramp. The Parks and Recreation Commission at their meeting in November 2016 met with neighbors that surround the Norin Landing Park to receive input on the conceptual designs and park amenities. From that meeting Staff developed a final concept design addressing the items that were discussed during the community meeting. Floodplain. The Federal Emergency Management Agency (FEMA) Flood Rate Study Map identifies the 100 -year floodplain of the Mississippi River along the subject site at an elevation of 882 feet. The concept plan drawing for Norin Landing has been revised to indicate the 882 foot contour obtained from GIS Data. Land within the 100 -year floodplain is regulated by Section 94 of the Zoning Ordinance. Parks are a permitted use within the 100 -year floodplain provides that improvements have low potential for flood damage, will not obstruct flood waters or increase flood elevations. The proposed improvements within the 100 -year floodplain portion of the subject site are limited to a precast concrete fishing platform, limestone blocks, and Class II aggregate trails. The planned gazebo is outside of the 100 -year floodplain. The improvements located within the 100 -year flood plan have low potential for damage from flooding, will not obstruct flood waters, or increase the flood elevation. The proposed concept plan complies with the floodplain regulations of the Zoning Ordinance. Wild and Scenic District. The subject site is within Subdistrict A of the Mississippi Wild, Scenic and Recreational River District (WS District) established as Section 95 of the Zoning Ordinance. Public open space uses, including public accesses with boat launch facilities and temporary docks, are a permitted use within Subdistrict A of the WS District. The proposed gazebo is required to be setback a minimum of 100 feet from the Ordinary High Water Level (OHWL) of the Mississippi River, which the location shown on the concept plan complies with. In developing the City park, the City is limited in terms of vegetative cutting within 100 feet of the OHWL to trees, shrubs and brush less than four inches in diameter measured four feet above grade except when removing rotten, damaged, or disease or insect infested trees that present safety hazards. The City will undertake cutting within 100 feet of the OHWL on a selective basis. Tree removal on a balance of the site may occur without restriction to create the open space shown on the concept plan. The concept plan complies with the provisions of the WS District. Final Concept Plan. Attached to this memo is the final concept design for Norin Landing Park which the Parks and Recreation Commission voted unanimously to recommend to the City Council for appoval. Items such as the parking lot and shelter have been redesigned throughout the various concept plans to preserve a more natural setting in the park, improve compatibility with surrounding homes, and maintain the goal of providing a park with boat and shoreline access to the Mississippi River as a community amenity. The changes incorporated as part of the final concept plan attached to this memo include: The shelter is moved further west due to the elevation of the site and the orientation of the house located directly south of the park. The orientation of the house located directly south of the proposed park is positioned northeast to southwest, which if the shelter were to be moved east, would be moved in direct view of the residence. Moving the shelter west and providing a row of coniferous trees provides a much greater masking of the shelter from the property to the south. ■ The parking lot has been revised from the previous concept plan to provide fewer parking stalls, a better turning radius for boat trailers, and area to expand parking stalls in the future. A total of three lights have been incorporated into the concept plan their locations are by the parking lot, the trail going to the shelter, and the within the shelter itself. The light locations were chosen to provide the best visibility for park monitoring and have the least impact on the surrounding residence. Staff met on December 12, 2016 with a representative from Rainbow Tree Care to assess the viability of the significant Cottonwood trees within the park. The tree located to the west of the parking lot has significant decay and is basically hollowed out approximately 15 to 20 feet into the tree itself. This is not the Cottonwood tree that is located in the retention pond area of the parking lot, which Rainbow Tree Care found to be in satisfactory condition DNR Review. As noted above, the City is responsible for administration of floodplain and WS District regulations governing use of the property. On December 9, 2016, City Staff and representatives from the Minnesota DNR Waters Division met to discuss the Norin Landing Concept plan. The DNR provided input regarding the boat landing, monitoring of boat traffic that may be available, and concrete piers for the landing itself that they may be also able to provide. DNR staff supported the proposed concept plan to improve boat and shoreline access to the Mississippi River. The Parks and Recreation Commission voted unanimously at their meeting on December, 2016 meeting to recommend the City Council approve moving forward with the preparation of plans and specifications and advertisement for bids for Norin Landing Park based on the preferred concept plan. The amount which was approved in the Capital Improvement Plan for construction of Norin Landing Park is $445,000hich is proposed to be funded through the Community Facilities Fund #208. As part of the planning process for Norin Landing Park an Outdoor Recreation Grant through Department of Natural Resources will be sought with available funding of up to $150,000. The project estimate is broken down as follows: Grant Writing Services $3,500 SRF $29,700 Park Projected Cost $359,906.80 (Including Alternates) Parking Lot/ Boat Landing $221,844.36 Large Tree Removal $4,500 TOTAL $619,451.16 Of the projected park improvements at Norin Landing, $159,830 are being proposed as bid alternates that may be added or removed as the project moves forward which would bring the estimated cost of the project to $459,621.16, should all of the alternates be excluded from the project. A breakdown of the alternates are as follows: Bituminous Trail in Lieu of $3,500 Class 2 Shelter $60,000 Deck Overlook $39,500 Vinyl Fence $31,680 Concrete Paving $10,620 Minus 10% Contingency $14,530 TOTAL $159,830 If approved Staff will coordinate to begin the preparation of plans, specifications and solicitation of bids immediately. Staff will also work with WSB to start the grant writing process, the timeline for the grant requires a submittal of the grant for review by the beginning of March. Organizations that submit a grant will be notified in June if they will receive funding. If funding is awarded, projects should be able to begin in August of 2017. SUPPORTING DOCUMENTS: X ATTACHED ElNONE A. Norin Landing Park Concept Plan B. Norin Landing Park Project Cost Estimate C. Norin Landing Parking Lot Project Cost Estimate. D. Resolution of support for the application of the Department of Natural Resources Outdoor Recreation Grant MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to approve SRF and Hakanson Anderson to proceed with plans and specifications and advertisement for bids for the construction of Norin Landing Park and boat ramp and to adopt a resolution of support for the application of the Department of Natural Resources Outdoor Recreation Grant. BUDGET INFORMATION FUNDING: BUDGETED: X YES Fund #208- Community Facilities NO � 1 t{I/ Fx�tl'gPondiVll� I Buffer Adjacent Residential Properties Open Lawn Area for GaiheringslPessive Recreation Brick Paver Entry Area vdth Limestone Block Seating Plan View Section ir/ m Boarding Dock 30' Gctagonal VKbad GazebclP lion Wood Ovedook Decker B'Wde Class 11 whh Yews to River Aggregate Tal Year flood n Limestone Block Seating Area Beach Area Limestone Block S..tinglvea —Bench Ara. NORIN LANDINGW,,I PREFERRED CONCEPT CITY OF OTSEGO ca . h xc.a m, oa < xnr Bfa9 2nM Engineer's Estimate Norin's Landing Park City of Otsego, MN Norin's Landing Parking Area Cost Estimate (2017) Schedule "A" - Site Work Item No. Description Unit Estimated Unit Cost Estimated Quantity Total Estimated Cost 1 Common Excavation (CV) CY $9.50 2,500 $23,750.00 2 Salvage Topsoil to Stockpile (CV) CY $7.00 1,629 $11,403.00 3 Salvage Topsoil from Stockpile (CV) CY $3.50 640 $2,240.00 4 Infiltration Basin Topsoil (LV) CY $6.00 188 $1,128.00 5 Turf Establishment LS $5,250.00 1 $5,250.00 6 Temporary Erosion Control LS $1,750.00 1 $1,750.00 7 Retaining Wall SF $35.00 285 $9,975.00 8 Clear and Grub LS $3,000.00 1 $3,000.00 Total Schedule "A": $58,496.00 Schedule "B" - Bituminous Driveway/Parking Lot Item No. Description Unit Estimated Unit Cost Estimated Quantity Total Estimated Cost 1 Aggregate Base, Class 5 (Modified) - 8" Thick TON $19.50 1,300 $25,350.00 2 Type LV4 Wearing Course Mixture (B) - 1.5" Thick TON $97.00 205 $19,885.00 3 Type LV3 Non -Wearing Course Mixture (B) - 2.0" Thick TON $91.50 274 $25,071.00 4 Bituminous Material for Tack Coat GAL $4.50 120 $540.00 5 Concrete Curb and Gutter- B612 LF $19.50 1,442 $28,119.00 6 Sawcut Bituminous Pavement (Full Depth) LF $4.50 22 $99.00 7 Mill Bituminous Surface SF $11.50 4 $46.00 8 4" Solid White Line - Paint LF $0.401 342 $136.80 Total Schedule "B": $99,246.80 Schedule "C" - Storm Sewer Item No. Description Unit Estimated Unit Cost Estimated Quantity Total Estimated Cost 1 15" RC Pipe Sewer, Design 3006 CL V LF $43.50 195 $8,482.50 2 Construct Drainage Structure EA $2,625.00 3 $7,875.00 3 Concrete Apron EA $855.00 2 $1,710.00 4 Articulated Concrete Block SY $150.00 60.4 $9,060.00 Please Note: this estimate does not include costs for installing a boat ramp, dock, any required dredging, or breakwater checks for dock protection. Total Schedule "C": Total All Schedules: 15% Engineering Fee: 5% Contingency: Total: $27,127.50 $184,870.30 $27,730.55 $9,243.52 $221,844.36 ot720norinlanding parkengest 1/17/2017 4:21 PM Norin Landing Preliminary Estimate City of Otsego UNIT LEGENDS: SRF Consulting Group, Inc. Project No. 9426 LS=Lump Sum, SF=Square Feet, SY=Square Yards, EA=Each, LF=Lineal Foot, FF=Face Feet, CY=Cubic Yards, AC = Acres Norin Landing Site Improvements Preliminary Estimate (1/18/17) Section 1 - Site Surveying / Removals Estimated Unit Cost Total Cost No. Descri tion Qty. Unit in Dollars In Dollars Provide all necessary construction surveying 1 and staking to meet layout and grading 1 LS $5,400.00 $5,400.00 requirements for all work - complete 2 Mobilization 1 LS $6,750.00 $6,750.00 3 Clear and grub trees as shown on the plan. 2 EA $200.00 $400.00 Section 1 - Site Surveying/Removals Total: $12,550.00 Estimated Unit Cost Total Cost No. Section 2- Earthwork Descri tion Qty. Unit in Dollars In Dollars *On-site earthwork as required to achieve plan grades and on-site earthwork balance - complete, including 1) stripping and stockpiling of topsoil; 2) common excavation of subsoil materials to subgrade elevations 1 identified for paving areas and bio -retention 1 LS $25,000.00 $25,000.00 areas; 3) maintenance of grades throughout construction including all silt fence, bio rolls, or other approved method; 4) final grading to specified tolerances - complete Install and maintain rock construction 2 entrance throughout construction - remove 1 EA $3,000.00 $3,000.00 upon completion of construction operations. Section 2 - Earthwork Total: $28,000.00 Section 3 - Asphalt &Concrete Estimated Unit Cost Total Cost No. Description Qty. Unit in Dollars In Dollars 1 Furnish and install 8' wide bituminous trails - 576 SY $28.00 $16,128.00 complete. 2 Furnish and install MNDOT Class 2 352 SY $18.00 $6,336.00 aggregate trails - complete. 3 Furnish and install 6" x 12" concrete edger - 64 LF $25.00 $1,600.00 complete. 4 Furnish and install brick pavers - complete. 292 SF 1 $12.00 1 $3,504.00 Page 1 of 3 Norin Landing Preliminary Estimate City of Otsego SRF Consulting Group, Inc. Project No. 9426 5 Furnish and install truncated domes withing 24 SF $50.00 $1,200.00 pedestrian curb ramps. Section 3 - Asphalt & Concrete Total: $28,768.00 Estimated Unit Cost Total Cost No. Section 4 -Site Furnishings Description QtV- Unit in Dollars In Dollars 1 Furnish and install limestone block seating - 13 EA $350.00 $4,550.00 complete. Furnish and install 6'x 34' boarding dock 2 including concrete abutment, spud poles, 1 EA $18,000.00 $18,000.00 and all required hardware - complete. 3 Furnish and install 10' x 10' precast concrete 1 LF $1,200.00 $1,200.00 fishing platform - complete. 4 Furnish and install mushroom stumps - 1 LS $500.00 $500.00 complete. 5 Furnish and install stepping stumps - 1 LS $500.00 $500.00 complete. 6 Furnish and install balance log - complete. 2 EA $600.00 $1,200.00 7 Furnish and install 4' 5' glacial boulder - 5 EA $400.00 $2,000.00 complete. 8 Furnish and install trash receptacle - 2 EA $1,000.00 $2,000.00 complete. 9 Furnish and install picnic table - complete. 4 EA $2,200.00 $8,800.00 10 Furnish and install game table - complete. 4 EA $2,000.00 $8,000.00 11 Furnish and install grill - complete. 2 EA $900.00 $1,800.00 12 Furnish and install interpretive signage - 1 LS $5,000.00 $5,000.00 complete. 13 Furnish and install cedar split rail fence - 72 LF $25.00 $1,800.00 complete. Section 4 - Site Furnishings Total: $55,350.00 Estimated Unit Cost Total Cost No. Section 5 - Landscape Description -7-7 QtY. Unit in Dollars In Dollars 1 Furnish and install Type A seed - complete. 0.3 AC $6,000.00 $1,800.00 2 Furnish and install Type B seed - complete. 1.2 AC $6,000.00 $7,200.00 3 Furnish and install 2.5" deciduous tree - 28 EA $550.00 $15,400.00 complete. 4 Furnish and install 8' coniferous tree - 17 EA $500.00 $8,500.00 complete. Section 5 - Landscape Total: $32,900.00 Estimated Unit Cost Total Cost FSection 6 - Site Electrical QtV. Unit in Dollars In Dollars Page 2 of 3 Norin Landing Preliminary Estimate City of Otsego SRF Consulting Group, Inc. Project No. 9426 Page 3 of 3 Furnish and install site electrical system Alternates Estimated Qty. Unit Unit Cost in Dollars 1 including panel, light and outlet within 1 LS $18,000.00 $18,000.00 $3,520.00 pavilion, and coordination with Wright - Furnish and install 30' pavilion including concrete footings, pad, and railings - complete. 1 LS $60,000.00 $60,000.00 Hennepin Electric - complete. Furnish and install overlook deck - complete. 1 LS $39,500.00 $39,500.00 Furnish and install parking lot light fixture Furnish and install 6' high vinyl coated chain link fence - complete. 792 LF $40.00 2 and pole, including circuitry and conduit - 1 LS $7,500.00 $7,500.00 $10,620.00 complete. $145,320.00 Contingency (10%) $14,532.00 Alternate Bid Items with 10% Contingency Section 6 - Site Electrical Total: $25,500.00 $361,226.80 Total Base Bid Estimate: $183,068.00 Contingency (10%) $18,306.80 Total Base Bid with 10% Contingency $201,374.80 Page 3 of 3 No. Alternates Estimated Qty. Unit Unit Cost in Dollars Total Cost In Dollars 1 Furnish and install bituminous trails in lieu of MNDOT Class 2 Aggregate trails - complete. 352 SY $10.00 $3,520.00 2 Furnish and install 30' pavilion including concrete footings, pad, and railings - complete. 1 LS $60,000.00 $60,000.00 3 Furnish and install overlook deck - complete. 1 LS $39,500.00 $39,500.00 4 Furnish and install 6' high vinyl coated chain link fence - complete. 792 LF $40.00 $31,680.00 5 Furnish and install 4" thick concrete paving - complete. 1,770 SF $6.00 $10,620.00 Alternate Bid Item Total: $145,320.00 Contingency (10%) $14,532.00 Alternate Bid Items with 10% Contingency $159,852.00 [Total (Base Bid, Alternate Bid Items, and 10% Contingency): $361,226.80 Page 3 of 3 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2017-08 RESOLUTION IN SUPPORT OF APPLYING FOR A GRANT FOR OUTDOOR RECREATION FOR NORIN LANDING BE IT RESOLVED that City of Otsego act as legal sponsor for the project contained in the Outdoor Recreation grant application to be submitted on 03 March 2017 and that WSB and Associates is hereby authorized to apply to the Department of Natural Resources for funding of this project on behalf of the City of Otsego. BE IT FURTHER RESOLVED that City of Otsego has the legal authority to apply for financial assistance, and financial capability to meet the match requirement (if any) and ensure adequate construction, operation, maintenance and replacement of the proposed project for its design life. BE IT FURTHER RESOLVED that City of Otsego has not incurred any development costs and has not entered into a written purchase agreement to acquire the property described in the Cost Breakdown section on this application. BE IT FURTHER RESOLVED that City of Otsego has or will acquire fee title or permanent easement over the land described in the site plan included in the application. BE IT FURTHER RESOLVED that, upon approval of its application by the state, City of Otsego may enter into an agreement with the State of Minnesota for the above - referenced project, and that City of Otsego certifies that it will comply with all applicable laws and regulations as stated in the grant agreement including dedicating the park property for uses consistent with the funding grant program into perpetuity. NOW, THEREFORE BE IT RESOLVED that City Attorney MacArthur is hereby authorized to execute such agreements as are necessary to implement the project on behalf of the applicant. I CERTIFY THAT the above resolution was adopted by the City Council of the City of Otsego on 23 January 2017. SIGNED: WITNESSED: (Signature) (Signature) Jessica Stockamp Tami Loff Mayor City Clerk