Loading...
ITEM 3 Resolution 2017-17OtkzoF 1 101 MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works Ron Wagner, City Engineer March 6, 2017 PRESENTER(s): REVIEWED BY: ITEM #: Ron Wagner, City Engineer Adam Flaherty, Interim City 3 Administrator AGENDA ITEM DETAILS RECOMMENDATION: Approve Resolution ordering the preparation of a feasibility report regarding street improvement to Quam Avenue and 62nd Street. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Quam Avenue and 62nd Street north of the St. Michael border and just west of TH101 are paved. Quam Avenue is 36' wide and 62nd St is 24' wide. These streets were completed in 1996 when TH101 access was removed at 62nd St, therefore the pavement is 21 years old. The city of St. Michael is reconstructing Quam Avenue within their jurisdiction this year and completing this short stretch of pavement within Otsego at this time will save money rather than making this a standalone project or tying it to a project not adjacent to it. The value of existing housing will be positively benefited by accessing a bituminous paved street in good condition. The existing street surfaces of Quam Avenue and 62nd Street have PCI (Pavement Condition Index) Ratings of 48, which are below the average in the City of Otsego. Typically, pavements within PCI Ratings of 50 or less are in their final stages of useful life and will need to be reconstructed or overlayed in the very near future. Improving the streets prior to the PCI falling below a PCI rating of 50 lessens the number and severity of interim patches or potholes repairs that will occur if the pavement is allowed to deteriorate. It will also lessen the cost to complete the street renewal thus the assessment amount. Staff is requesting a feasibility report be completed to determine the best method of street renewal, the estimated project costs, and the estimated assessments to the benefiting properties. Potential Project timeline is as follows: Council Orders Feasibility Report 3/6/17 Council Received and Accepts Feasibility Report and Sets Public Improvement Hearing Date and Order Plans and Specifications Public Improvement Hearing and Council Approves Plans and Specification and Authorizes Advertisement for Bids Open Bids Council Awards Project Construction Assessment Hearing SUPPORTING DOCUMENTS: X ATTACHED List: Resolution 2017-17 Estimate of Project Cost Project Area Map 3/13/17 4/17/17 5/_/17 5/_/17 May and June August or September ❑ NONE Motion: Approve Resolution 2017-17 ordering the preparation of a feasibility report regarding street improvements to Quam Avenue and 62nd Street. BUDGET INFORMATION FUNDING: BUDGETED Pavement Management Fund - 201 Yes RESOLUTION NO. 2017 -17 RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR THE IMPROVEMENT OF STREETS QUAM AVENUE (ST. MICHAEL BORDER TO 62ND STREET) AND 62ND STREET (QUAM AVENUE EAST TO CUL-DE-SAC) WHEREAS, it is proposed to improve streets; Quam Avenue (St. Michael border to 62nd Street) and 62nd Street (Quam Avenue east to the Cul-de-sac), which are twenty one years old and are in need of improvement, and to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO, MINNESOTA; That the proposed improvement be referred to Hakanson Anderson for study and that they are instructed to report to the council with all convenient speed advising the council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted by the council this 6th day of March, 2017. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor ami Loff, Clerk ot392Res_0rderingFeasRpt - Quam 2017 Quam Avenue and 62nd Street Overlay Project (to by included with St. Michael's 2017 construction project) ENGINEER'S COST ESTIMATE Rini RrhPriule "A" - 1-1/2" Overlav Item No. Spec. Ref Description Estimated Quantity Unit Unit Price Total Estimated Extension 1 2021.501 MOBILIZATION 1 LS $1,100.00 $ 1,100.00 2 2104.505 REMOVE BITUMINOUS PAVEMENT FULL DEPTH 64 SY $10.00 $ 640.00 3 2104.513 SAWING BIT PAVEMENT FULL DEPTH 99 LF $5.00 $ 495.00 4 2211.501 AGGREGATE BASE CLASS 5 ROAD 3 Ton $17.00 $ 51.00 5 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C - OVERLAY 481 Tons $65.00 $ 31,265.00 6 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C - DRIVEWAY 8 Tons $100.00 $ 800.00 7 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 285 GAL $3.50 $ 997.50 8 2575.555 TURF ESTABLISHMENT 0.08 Acre $2,000.00 $ 160.00 9 2574.525 PULVERIZED TOPSOIL BORROW 26 CY $25.00 $ 650.00 10 2582.502 4" SOLID WHITE PAINT 1984 LF $0.10 $ 198.40 11 2582.502 4" DOUBLE SOLID YELLOW PAINT 992 LF $0.20 $ 198.40 Total - Bid Schedule "A" $36,555.30 Bid Schedule "A" - 1-1/2" Overlay $36,555 15% Administration, Legal, & Engineering $5,483 TOTAL ESTIMATED PROJECT COST $42,038 S:Wlunicipal\AOTSEGO\901\2017\QUAM AVENUE\OT901-2017 EngEst.xlsx Page 1 of 1 — : X-xi IIT t5�� 1I� `I w 0 -13VHOIN 'IS 30 o _ y � N yNj mmw- 4-1 _ _-� s O z Z ': 003510 30 )kill o Z 0 w N VI Q W f rQ >O N W = U w O o H Z ht' 0 w _ Q o N .}.� . 0 uj ID E n Lq Iq IR 3 � O eho O�wiE W" _ `m O1 ° - Q3c I C c;gn$ w Z OW Cii s 2_0 w - Z M n� a Pr m w -ee in n aeo V i, ad00+1 oa 3nda 99 4 00+£ 3N 133a1S ONZ9 �14— 1 or AMkk_ Nm � V � F= F C7 Q } WF Z W d = O a W U U w LL ni r O � � ¢ 2K o U � m �++ a WO G LLF m O O LL O 0 LU � � � � w w ¢ F m 0 FQ- � 5 w W Q w w O � � (07 y ¢ O O Z � e $ � � � ❑ V p � e e n ^ n NW N C W N O O ry N a N N N N N N N N N W Z N M V f0 1� c0 N