Loading...
ITEM 3.8 Water Tower #2 lighting repairs6yOF go MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Utilities Utility Manager, Neidermeier March 27, 2017 PRESENTER(s): REVIEWED BY: ITEM #: Consent Interim Administrator, Flaherty 3.8 AGENDA ITEM DETAILS RECOMMENDATION: The Public Works Subcommittee reviewed Water Tower #2 lighting repairs and recommended proceeding with EIM to replace lighting to LED heads. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Water Tower #2 serving the West Public Water System had logo light failures. Staff worked with an electrical contractor finding water had entered the fixture heads causing electrical failures and damage to the ballasts. The equipment is beyond its warranty replacement. Quotes were received from two contractors to replace the four logo light fixtures from the ceramic metal halide to an LED style. Staff recommends EIM to complete the repairs with Public Works Committee support at the March 15th meeting. SUPPORTING DOCUMENTS: XATTACHED NONE Quotes POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve EIM to replace Water Tower #2 logo light fixtures to the recommend LED style for the quoted $4200.00. BUDGET INFORMATION FUNDING: BUDGETED: ❑ YES 601 — Water Operations Fund X NO Date: 3/6/17 Dear Kurt Neidermeier, PROPOSAL —Water Tower #2 Logo Lighting Please consider the following proposal for the requested work to replace the lighting at water tower located at 10200 701' Street. As discussed, below are options for this installation along with pricing. I have included the email description from supplier for reference of the quoted options 2, 3 and 4. These options are RAB fixtures. Original is a GE fixture. Option #1 —Replace Logo Lights with 150W LED Fixtures (original quoted fixture updated) Scope includes o Remove and replace existing fixtures with new 150W LED fixtures Lump sum amount is $4,800.00 Option #2 — Replace Logo Lights with 78W LED Fixtures (RECOMMENDED BY LIGHTING GUY) - Scope includes o Remove and replace existing fixtures with new 78W LED fixtures h - Lump sum amount is $4,200.00 Option #3 — Replace Logo Lights with 26W LED Fixtures (NOT RECOMMEND NST SHOWINGO REFERENCE) - Scope includes o Remove and replace existing fixtures with new 26W LED fixtures - Lump sum amount is $2,400.00 Option #4 — Replace Logo Lights with 300W LED Fixtures - Scope includes o Remove and replace existing fixtures with new 300W LED fixtures - Lump sum amount is $6,600.00 Adder — Relocate two poles as allowed by site constraints. - Scope includes o Remove and relocate two of four existing poles. Poles on SE side of tower to be relocated to better direct light to logo - Lump sum adder to the above fixture install amount is $7,200.00 Above figures in that that owner will provide use of a bucket truck and excavator. Please let me know if you have any questions regarding above scopes of work. Expiration of this proposal is 4/1/17. We look forward to hearing back from you. Sincerely, Nevin Fensteimacher Op NIL ObEEZ. . I G H T I IN G. Date: 17 Feb 2017 Title: OTSEGO WATER TOWER Desc • ° FIXTURES 40 FEET APART - 60 FEET BACK FROM TOWER AIMED UP For: SCOTT WIRTH - GRAYBAR By: RICH LINDEMANN AT RAB LIGHTING 0 25 50 Lu ilr IES Filename: 11180241 -cries Description : EZLED78SFI EZLED78T- (NEMA 3X3) TWO-PIECE CAST METAL LED/DRIVER HOUSING, CAST FINNED METAL THREE WHITE MULTI -CHIP LIGHT EMITTING 3 i Light Loss Factor : 1.00 Number of Lamps: 3' Lamp Lumens: -1 Ims 1 Luminaire Watts : 78 W 763-295-2690® Fax 763-295-2691 Date: February 6, 2017 To: City of Otsego Attn: Seth Wilkes Subject: Replace Pole Heads RE: Estimate TR17017 Thank you for the opportunity to provide an estimate for the above referenced project. We propose to supply labor, material, supervision and electrical permit fees for installations per your request. Estimate Amount: $39200.20 Clarifications: ® Replace four (4) pole heads with LED lights equivalent to existing lights at the water tower location. ® We will utilize customer's bucket truck If you have any questions please give me a call. Thank you for the opportunity to serve you. Sincerely, �(XC(d Agaz,6- Todd Roberts Attachment 1von & Son v Electric., Inn. 763-295-2690 ® Fax 763-295-2691 Date: February 28, 2017 To: City of Otsego Attn: Kurt Neidermeier Subject: Replace Pole Heads _-RE:-- — - -EAimate TR1701713-- -- - — Thank you for the opportunity to provide an estimate for the above referenced project. We propose to supply labor, material, supervision and electrical permit fees for installations per your request. Estimate Amount: $6,098.00 Clarifications: ® Replace four (4) pole heads with LED lights equivalent to existing lights at the water tower location. ® We will utilize customer's bucket truck If you have any questions please give me a call. Thank you for the opportunity to serve you. Sincerely, 1—bcu dUZ6- Todd Roberts &, 40C) - Ic:oD 0 -ET. 763-295-2690 ® Fax 763-295-2691 Date: February 28, 2017 To: City of Otsego Attn: Kurt Neidermeier Subject: Replace Pole Heads RE: Estimate TR17017C Thank you for the opportunity to provide an estimate for the above referenced project. We propose to supply labor, material, supervision and electrical permit fees for installations per your request. Estimate Amount: $79108.00 Clarifications: ® Replace four (4) pole heads with LED lights equivalent to existing lights at the water tower location. ® We will utilize customer's bucket track If you have any questions please give me a call. Thank you for the opportunity to serve you. Sincerely, --bcu 0ZLfs Todd Roberts