Request for
City Council Action
ORIGINATING DEPARTMENT:
REQUESTOR:
MEETING DATE:
Utilities
Utility Manager, Neidermeier
March 27, 2017
PRESENTER(s):
REVIEWED BY:
ITEM #:
Consent
Interim Administrator, Flaherty
3.8
AGENDA ITEM DETAILS
RECOMMENDATION:
The Public Works Subcommittee reviewed Water Tower #2 lighting repairs and recommended
proceeding with EIM to replace lighting to LED heads.
ARE YOU SEEKING APPROVAL OF A CONTRACT?
IS A PUBLIC HEARING REQUIRED?
No
No
BACKGROUND/JUSTIFICATION:
Water Tower #2 serving the West Public Water System had logo light failures. Staff worked with an
electrical contractor finding water had entered the fixture heads causing electrical failures and damage
to the ballasts. The equipment is beyond its warranty replacement.
Quotes were received from two contractors to replace the four logo light fixtures from the ceramic
metal halide to an LED style. Staff recommends EIM to complete the repairs with Public Works
Committee support at the March 15th meeting.
SUPPORTING DOCUMENTS: XATTACHED NONE
Quotes
POSSIBLE MOTION
Please word motion as you would like it to appear in the minutes.
Motion to approve EIM to replace Water Tower #2 logo light fixtures to the recommend LED style for
the quoted $4200.00.
BUDGET INFORMATION
FUNDING: BUDGETED: ❑ YES
601 — Water Operations Fund
X NO
Date: 3/6/17
Dear Kurt Neidermeier,
PROPOSAL —Water Tower #2 Logo Lighting
Please consider the following proposal for the requested work to replace the lighting at water tower
located at 10200 701' Street. As discussed, below are options for this installation along with pricing. I
have included the email description from supplier for reference of the quoted options 2, 3 and 4. These
options are RAB fixtures. Original is a GE fixture.
Option #1 —Replace Logo Lights with 150W LED Fixtures (original quoted fixture updated)
Scope includes
o Remove and replace existing fixtures with new 150W LED fixtures
Lump sum amount is $4,800.00
Option #2 — Replace Logo Lights with 78W LED Fixtures (RECOMMENDED BY LIGHTING GUY)
- Scope includes
o Remove and replace existing fixtures with new 78W LED fixtures h
- Lump sum amount is $4,200.00
Option #3 — Replace Logo Lights with 26W LED Fixtures (NOT RECOMMEND NST SHOWINGO
REFERENCE)
- Scope includes
o Remove and replace existing fixtures with new 26W LED fixtures
- Lump sum amount is $2,400.00
Option #4 — Replace Logo Lights with 300W LED Fixtures
- Scope includes
o Remove and replace existing fixtures with new 300W LED fixtures
- Lump sum amount is $6,600.00
Adder — Relocate two poles as allowed by site constraints.
- Scope includes
o Remove and relocate two of four existing poles. Poles on SE side of tower to be relocated
to better direct light to logo
- Lump sum adder to the above fixture install amount is $7,200.00
Above figures in that that owner will provide use of a bucket truck and excavator. Please let me know if
you have any questions regarding above scopes of work. Expiration of this proposal is 4/1/17. We look
forward to hearing back from you.
Sincerely,
Nevin Fensteimacher
Op NIL ObEEZ.
. I G H T I IN G.
Date: 17 Feb 2017
Title: OTSEGO WATER TOWER
Desc • ° FIXTURES 40 FEET APART - 60 FEET BACK FROM TOWER
AIMED UP
For: SCOTT WIRTH - GRAYBAR
By: RICH LINDEMANN AT RAB LIGHTING
0 25 50
Lu ilr
IES Filename:
11180241 -cries
Description :
EZLED78SFI EZLED78T- (NEMA 3X3)
TWO-PIECE CAST METAL LED/DRIVER
HOUSING, CAST FINNED METAL
THREE WHITE MULTI -CHIP LIGHT EMITTING 3
i
Light Loss Factor :
1.00
Number of Lamps:
3'
Lamp Lumens:
-1 Ims 1
Luminaire Watts :
78 W
763-295-2690® Fax 763-295-2691
Date: February 6, 2017
To:
City of Otsego
Attn:
Seth Wilkes
Subject:
Replace Pole Heads
RE:
Estimate TR17017
Thank you for the opportunity to provide an estimate for the above referenced project. We propose
to supply labor, material, supervision and electrical permit fees for installations per your request.
Estimate Amount: $39200.20
Clarifications:
® Replace four (4) pole heads with LED lights equivalent to existing lights at the water tower
location.
® We will utilize customer's bucket truck
If you have any questions please give me a call. Thank you for the opportunity to serve you.
Sincerely,
�(XC(d Agaz,6-
Todd
Roberts
Attachment
1von & Son v Electric., Inn.
763-295-2690 ® Fax 763-295-2691
Date:
February 28, 2017
To:
City of Otsego
Attn:
Kurt Neidermeier
Subject:
Replace Pole Heads
_-RE:-- — -
-EAimate TR1701713-- -- - —
Thank you for the opportunity to provide an estimate for the above referenced project. We propose
to supply labor, material, supervision and electrical permit fees for installations per your request.
Estimate Amount: $6,098.00
Clarifications:
® Replace four (4) pole heads with LED lights equivalent to existing lights at the water tower
location.
® We will utilize customer's bucket truck
If you have any questions please give me a call. Thank you for the opportunity to serve you.
Sincerely,
1—bcu dUZ6-
Todd Roberts
&, 40C) - Ic:oD 0 -ET.
763-295-2690 ® Fax 763-295-2691
Date: February 28, 2017
To:
City of Otsego
Attn:
Kurt Neidermeier
Subject:
Replace Pole Heads
RE:
Estimate TR17017C
Thank you for the opportunity to provide an estimate for the above referenced project. We propose
to supply labor, material, supervision and electrical permit fees for installations per your request.
Estimate Amount: $79108.00
Clarifications:
® Replace four (4) pole heads with LED lights equivalent to existing lights at the water tower
location.
® We will utilize customer's bucket track
If you have any questions please give me a call. Thank you for the opportunity to serve you.
Sincerely,
--bcu 0ZLfs
Todd Roberts