The Public Works Subcommittee reviewed Well 8 inspection findings with staff at the March 15th
meeting and recommended to proceeding with repairs.
ARE YOU SEEKING APPROVAL OF A CONTRACT?
No
IS A PUBLIC HEARING REQUIRED?
No
BACKGROUND/JUSTIFICATION:
Well #8 located on Randolph Ave serving the East Public Water System was pulled for routine inspection
and the aquifer videoed to provide assessment of the equipment and well status for future maintenance
and improvement determinations.
Aquifer:
The cavern ceiling of this Mount Simon aquifer is at a depth of 377 feet with a drilled base at 437 feet;
the current aquifer depth is 409 feet indicating sand sluffing of about 28 feet from the original drilling.
The remaining cavern is 32 feet of water access. Reviewing the 2008 video sand sluffing created a base
at 425 feet revealing about 16 feet of sand has filled the cavern since then.
Discussions with multiple contractors with support of strong static -pumping levels and recovery time,
consistent specific capacities, the pump depth setting and the remaining aquifer cavern, staff agrees the
aquifer does not require sand removed at this time. Financing will be identified in the Capital
Improvement Plan for sand removal during the 2025 inspection based on video findings.
Equipment:
The submersible pump was pull and reviewed. The motor checks out electrically and will be maintained.
The pump has met its useful life and is recommended be replaced for the next 8-10 year cycle. Quotes
were received from for pump replacement, mobilization, installation, power chord replacement and
standard replaceable items. Staff is providing recommendation for Traut wells to proceed with repairs
with estimate of $15540.00 plus freight charges.
Staff updated the Public Works Subcommittee at the March 15th meeting with findings from Well 8 and
recommended continuing based on recommendations due to the critical nature of the equipment and
maintaining redundancy within the system.
SUPPORTING DOCUMENTS: ATTACHED NONE
Quotes x
Reference Pictures x
• t t • Ti7 0'
Please word motion as you would like it to appear in the minutes.
Motion to approve Traut Wells to proceed with Well 8 equipment repairs for estimate of $15,540.00
plus related freight charge.
RI Inr.FT INFORMATION
FUNDING: BUDGETED: ❑ YES
601 — Water Operations Fund
x NO
141 28th Ave South
Waite Park, MN 56387
Tr
atiuil
' s�j
320-251-5090 Email Joetraut@trautwells.com
www.trautwells.com
Quote - City of Otsego well 8 g Replacement parts
DATE: 3/8/2017 PHONE # 763-913-6706
FAX #
NAME: City of Otsego
ADDRES
ATTN: -Nick Beste
RE: Note: Lead time on Rebuild existing 125hp Hitachi motor is 6 to 7 weeks
Description
Mob / Demob to reinstall pump
Field time to install pump
Rebuild - 10" 125hp Hitachi 1800rpm/460v motor
New - 13MC- 5 stage American- Marsh pump
New - 10" Check Valve Flowmatic
New - 4/oft w/ground Double jacketed
4/ott wire splice
18x20 pitless o -rings
1 1/4" SDR26 PVC sound tube
Chlorine
Electrical connectors Polaris (wet location)
Misc supplies
JOB#
Unit I Init Prirta
30-0000
()TV Tntmic
LS
650.00
1
$
650.00
HR.
215.00
5
$
1,075.00
EA
6,650.00
1
$
6,650.00
EA
3,550.00
1
$
3,550.00
LF
23.50
112
$
2,632.00
EA
150.00
1
$
150.00
EA
85.00
2
$
170.00
LF
2.00
112
$
224.00
LBS
5.00
5
$
25.00
LS
63.00
3
$
189.00
LS
225.00
1
$
225.00
TOTAL MATERIALS
TOTALLABOR
INCOMING FREIGHT
TOTAL
Option: New 10" 125hp SME Submersible motor,1800rpm, 3ph/460v - $24,950.00
1 week to ship subject to stock on hand
Estimated
$ 28,665.00
$
1,725.00
$
1,450.00
$
31,840.00
j('990
1 L4
�2 7"
P.O. BOX 778, 11366 HWY. 71 NE (ACROSS FROM RINGO LAKE)
SPICER, MINNESOTA 56288 - (320) 796-2111
www.theinwelf.com - E-mail: theinwell@tds.net
March 22, 2017
Kurt Neidermeier
City of Otsego
13400 90th St. NE
Otsego, MN 55330
Dear Kurt,
We at Thein Well Company are pleased to provide pricing on the following scope of services for
well 8:
Mob/ demob pump install
lump sum = $1,0001,00
Field time to install pump
hourly rate= $250,00/hr, �— i Z-5-0 (s k-�
Rebuild pump
Alt _ff 47 gp
New 10" check valve
,
unit price = $ 2,110 00
New 4 ott w ground double jacket
unit price = $ 22.50(contractor identifies 112 LF)= Y -,r2,520,00
new 4 ott wire splice
unit price = $50,00
18x20 pitless orings
unit price = $95.00 (contractor identifies 2) $190,00
1/1/4" SDR26 PVC or =
unit price/ft = $1.25 (contractor identifies 112 LF) = $1,40,00
Chlorine
lump sum = $25.00
Electrical connectors Polaris wet
location unit price = $2' ,00(contractor identifies 3) = $,'7),0,0
Misc supplies $100,00
Freight
lump sum = "IIJKOO
American Marsh 13MC — 5 stage pump = V,500,00
To schedule, or if you have any questions, please feel free to contact me at (800)450-8000, or
via email zack@theinwell.com at your convenience.
Best Regards,
Zack Thein h
�.�
Thein Well Co. x
CLARA CITY, MN 56222 (320) 847-3207 - MONTICELLO, MN 55362 (763) 271-4200
V 'ZY"i
Equal Opportunity Employer
*** E S T I MAT E
E.H. RENNER & SONS, INC.
15688 JARVIS STREET NW
ELK RIVER, MN 55330
ESTIMATE NO.:000068450000
CUSTOMER NO.:05989
DATE: 03/21/17
TO: SHIP TO:
CITY OF OTSEGO City of Otsego
13400 - 90TH STREET NE DEEP WELL NO 8, 752116
WELL REHAB WORK 2017
OTSEGO, MN 55330 OTSEGO, MN 55330
SALESPERSON . 01 Contacts: 1. CITY HALL (763) 441-4414
ORDER DATE . 03/15/17 2. Nick Beste (763) 913-6706
3 ( ) -
4. CITY HALL FAX (763) 441-8823
--------- -
---------------------------
UNIT
QUANTITY DESCRIPTION PRICE AMOUNT
OTSEGO WELL NO 8,
MDH UNIQUE NO 752116
REPLACEMENT PARTS
1 MOB/DEMOB PUMP INSTALL 150.00 150.00
2.50 SMEAL R-12 PUMP TRUCK /HR. 150.00 375.001s0
3.50 OPERATOR / HR 116.00 406.00SW
3.50 HELPER /HR 99.00 346.5044111,-
1 NEW PUMP/AMERICAN MARSH S13MC-5 8,975.00 8,975,00
1 FREIGHT ON PUMP 225.00 225.00-
1
25.001 NEW 10" CHECK VALVE 2,092.00. 2,092.00
112 WIRE 0000-3 W/GROUND 20.87 2,337.44-
3 DRBSK3 IT -CONNECTOR /EA 34.95 104,85
112 PIPE PVC 1-1/4" SURELINE 2.00 224.00
0.20 CHLORINE STERILENE /8.5 LB 170.10 34.02
1 WATER TRUCK/TANKER /DAY 145.00 145.00
1 MSC SUPPLIES, TAPE, BANDIT 35.00 35.00
2 0 -RING BAKER PITLESS 18" / 20" 124.386 248.77
1 PICK UP -PUMP EQUIPMENT FROM TRAUT 250.00 250.00
ROGER E. RENNER Office: (763) 427-6100, w�
President Mobile: (763) 286-9355
Fax., (763) 427-0533 X22 c
EO
I.ncarpenled p
"WELL DRILLING FOR FIVE OERERRTIORS"
15688 Jarvis St. NW rerenner@ehrenner.com `
Elk River, MN 55330 vaww.ehrenner.com
SUB -TOTAL 15,948.58
* T H A N K Y O U * SALES TAX 0.00 TOTAL 15,948.58
Al