Loading...
ITEM 3.1ITEM 3_7 3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231 .5840 Facsimile: 763.427.0520 TPCTPQ!'cDPlanningCo.com PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht, AICP DATE: 13 April 2017 ACTION DATE: 20 May 2017 RE: Otsego —Arbor Creek 51h Addition Preliminary Plat TPC FILE: 101.02 BACKGROUND Centra Homes, LLC has submitted plans for development of seven single family lots east of MacIver Avenue and south of 80th Street. The subject site is 2.3 acres in area and consists of Outlot C, Arbor Creek 3rd Addition and an unplatted parcel abutting the original Arbor Creek Preliminary Plat. The proposed development requires consideration of applications for a Zoning Map amendment rezoning the unplatted parcel to R-4, Residential Urban Single Family District, preliminary plat, and final plat approval. A public hearing has been noticed for the Planning Commission meeting on 17 April 2017 at 7:OOPM to consider the applications. Exhibits: A. Site Location B. Preliminary Plat C. Final Plat D. Site Development Plans dated 03/21/17 ANALYSIS Zoning. Outlot C, Arbor Creek 3rd Addition is zoned R-4 District consistent with the zoning designation for Arbor Creek east of MacIver Avenue. The unplatted parcel is zoned A-1, Agriculture Rural Service District consistent with the Interim Land Use Plan adopted as part of the Comprehensive Plan that maintains agriculture zoning on parcels until such time as application is made for development of urban land uses guided by the Future Land Use Plan. The developer is requesting the unplatted parcel be rezoned to R-4 District, which allows single family lots and dwellings as a permitted use. Consideration of the proposed Zoning Map amendment is to be based upon (but not limited to) the criteria established in Section 20-3-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The subject site is guided for low density residential uses within the West Sewer District by the 2012 Comprehensive Plan and planned to be developed with single family lots. The proposed land use is consistent with provisions of the Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The subject site is surrounded by and will be compatible with the following existing and planned single family residential land uses in the area: Direction Land Use Plan Zoning Map Existing Use North Public/Quasi-Public INS District E-8 School East LD Residential A-1 District Rural single family South LD Residential R-4 District Single family West LD Residential R-4 District Single family 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed preliminary plat will comply with all applicable requirements of the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: Four of the proposed lots within the preliminary plat are accessed through Arbor Creek via local streets and three lots will access directly to 80th Street, which is a minor collector street improved as part of the ISD 728 E-8 development. These streets connect to MacIver Avenue, which is designated as a residential major collector street 2 for moving traffic in/out of the area. Area roadways have adequate capacity to accommodate traffic generated by the proposed development. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The proposed preliminary plat is within the West Sewer District and utility and service capacity for the proposed development is available. Existing Structures. There is an existing single family house and detached accessory buildings within the area of the unplatted parcel. The single family house and detached accessory buildings are to be demolished. We recommend adding demolition of the existing structures as a condition of preliminary plat approval. Streets. The proposed development will include extension of 791h Street from the east line of Arbor Creek 3rd Addition across the southern portion of the uplatted parcel to its east boundary. This street is designed as 28 feet wide with a five foot wide sidewalk on the north side within a 60 foot right-of-way consistent with the requirements of the Engineering Manual. A temporary cul-de-sac will be required to be constructed at the east terminus of 79th Street. Lots 2-4, Block 1 will access directly to 80th Street, which is a minor collector street improved as part of the ISD 728 E-8 School development. Direct lot access to minor collector streets is allowed by the Zoning Ordinance and Subdivision Ordinance. The street was constructed without surmountable curb, so driveway aprons will be required to be constructed by the developer/builder for each lot. The developer has submitted construction plans for the proposed street improvements. The developer will also be required to pay a collector access fee for MacIver Avenue for the proposed seven lots as part of a development agreement. All right-of-way and street issues, including signs and street lighting, are subject to review and approval of the City Engineer. Lot Requirements and Setbacks. The table below outlines the lot requirements and setbacks established for lots within the R-4 District. The proposed single family lots range in area from 12,038 square feet to 21,595 square feet, with a mean lot area of 14,050 square feet. All of the proposed lots comply with the minimum requirements of the R-4 District. Min. Lot Area Min. Lot Width Min. Lot Depth Setbacks Front Side Rear 12,OOOsf. Interior 75ft. 100ft. 35ft. Interior 10ft. 20ft. Corner 100ft Corner 35ft. Landscaping. No landscape plan has been submitted. A minimum of two shade trees per lot are required to be planted by Section 20-19-2.0 of the Zoning Ordinance. Installation of the trees will be verified at the time a certificate of occupancy is issued for a single family dwelling on each lot. Park and Trail Dedication. Section 21-7-18 of the Subdivision Ordinance establishes requirements for park and trail dedication. The Future Parks and Trails Plan map adopted as part of the 2012 Comprehensive Plan does not identify acquisition of property from within the area of the subject site. As such, park and trail dedication requirements will be satisfied as a cash fee in lieu of land paid at the time the final plat is approved and development agreement executed. Grading Plan. The applicant has submitted grading and drainage plans for the proposed preliminary plat. There are no wetlands within the area of the preliminary plat. The developer must pay a stormwater impact fee for Otsego Creek at the time of final plat approval. All grading, drainage, and erosion control issues are subject to review and approval by the City Engineer. Utility Plan. The applicant has submitted utility plans for extension of sanitary sewer and water utilities to serve the proposed single family lots. Utility access to Lots 2-4, Block 1 will be in the rear yard as there are no utilities installed within 80th Street to the front of the lots. The Comprehensive Plan establishes that the City only allocates sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. The developer will be required to pay the Sewer Availability Charge and Water Availability Charge in effect at the time of final plat approval. All utility plans and issues are subject to review and approval of the City Engineer. Easements. Drainage and utility easements are shown to be dedicated at the perimeter of all lots as required by Section 21-7-15.A of the Subdivision Ordinance. The drainage and utility easements are widened where necessary to accommodate rear yard utility pipes for Lots 2-4 as shown on the Utility Plan. All drainage and utility easements are subject to review and approval of the City Engineer. Outlots. The proposed preliminary plat and final plat includes no outlots. Development Agreement. The City Attorney will draft a development agreement related to the proposed final plat to provide for construction of the project, completion of all public improvements, establishment of required securities, and payment of applicable fees. The Development Agreement is to be adopted by resolution of the City Council concurrent with the final plat approval and executed prior to recording of the final plat. M RECOMMENDATION The proposed preliminary plat and final plat for Arbor Creek 511 Addition is consistent with the 2012 Comprehensive Plan and complies with requirements of the Zoning Ordinance and Subdivision Ordinance. Our office recommends approval of the applications as outlined below. POSSIBLE MOTIONS Decision 1— Zoning Map Amendment A. Motion to recommend approval of a Zoning Map amendment rezoning the subject site from A-1 District to R-4 District based on a finding that the request is consistent with the criteria outlined in Section 20-3-2.F of the Zoning Ordinance. B. Motion to deny the application based on a finding that the request is not consistent with the criteria outlined in Section 20-3-2.F of the Zoning Ordinance. C. Motion to table. Decision 2 —Preliminary Plat/Final Plat A. Motion to recommend approval of a preliminary plat and final plat for Arbor Creek 51h Addition, subject to the following conditions: 1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. All lots within the preliminary and final plat shall comply with the following minimum lot requirements and setbacks: Min. Lot Area Min. Lot Width Min. Lot Depth Setbacks Front Side Rear 12,OOOsf. Interior 75ft. 100ft. 35ft. Interior 10ft. 20ft. Corner 100ft Corner 35ft. 3. Landscaping shall be installed on each lot as required by Section 20-19-2.0 of the Zoning Ordinance. 4. Park and trail dedication requirements shall be satisfied as a cash fee in lieu of land at the time of final plat approval. 5 5. The developer shall pay a collector street access fee for MacIver Avenue upon approval of the final plat as set forth in the development agreement; II right-of- way, street construction, street signs, and street lighting are subject to review and approval of the City Engineer. 6. The developer shall pay a stormwater impact fee for Otsego Creek at the time of final plat approval; all grading, drainage and erosion control plans are subject to review and approval of the City Engineer. The developer shall pay applicable utility availability charges upon approval of the final plat and pay utility connection charges at the time a building permit is issued for each lot based on the current fee in effect at that time; all utility plans and issues are subject to review and approval of the City Engineer. 8. All drainage and utility easements are subject to review and approval of the City Engineer. 9. Existing structures within the uplatted parcel shall be demolished and all debris properly disposed of as required by the City Code. 10. The developer shall execute a development agreement upon final plat approval as drafted by the City Attorney and approved by resolution of the City Council. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and does not comply with the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual. C. Adam Flaherty, Interim City Administrator/Finance Director Tami Loff, City Clerk Ron Wagner, City Engineer Andy MacArthur, City Attorney David Pattberg, Centra Homes, LLC Nate Herman, Sambatek Site Location Map 118295000020 11880024.1400. K - - - B0�TH1iSlTiiNE_ - -411,8800251103 ; 11850,0302203 � �1'f1T.l 1.CT A1C r 118500302204 FU — 78T:H:ST' NE -W �PZ U, Lu k N _ .0 �Lu li I 77TH ST NE 413 ft 11851931,00 83RDST NE_ 1.18500193400 Overview Legend Roads — CSAHCL — CTYCL MUNICL P RIVATEC L TWPCL Highways Interstate State Hwy US Hwy City/Township Limits ❑ c ❑t O❑ Parcels