Loading...
ITEM 4.1_attachmentLeFebvre Creek Park Preliminary Cost Estimate Otsego, MN SRF Consulting Group, Inc. Project No. 10147 5/10/2017 LeFebvre Creek Park Preliminary Cost Estimate - May 10, 2017 Citv of Otseao Survey and Staking $6,000.00 Earthwork $22,500.00 -Site Grading/Erosion Control $20,000 -Rock Construction Access $2,500 Play Area $185,474.00 -Play Equipment, Wood Fiber Mulch, and Installation $90,000 -Concrete Walks and Pads $8,676 -Concrete Curbing $11,968 -Play Container Drainage System $5,500 -Poured-in-Place Play Surfacing $10,530 -Shelter and Installation $24,045 -Shelter Footings $8,000 -Shelter Light, Outlet, Conduit, and Circuitry $9,500 -Landscaping $4,955 -Grill $800 -Game Tables $6,000 -Picnic Tables $4,000 -Trash Receptacle $1,500 Rest Area $25,305.00 -Tower Mister $8,500 -Water Service from Existing Stub $4,000 -Drinking Fountain $6,500 -Concrete Walks and Pads $1,110 -Dog Waste Bag Dispenser $500 -Benches $3,200 -Landscaping $1,495 Overlook Area $39,120.00 -Metal Pergola $30,000 -Concrete Walks and Pads $3,240 -Benches $3,200 -Landscaping $2,680 Shoot -Around Court $7,435.00 -Bituminous Pavement $4,160 -Basketball Outfit (standard, goal, backboard) $3,000 -Landscaping $275 Landscaping/Turf Establishment $35,600.00 -Seed and Sod $13,650 -Coniferous and Deciduous Trees $21,950 Irrigation System $40,000.00 Trail Lighting $80,000.00 -8 Poles/Fixtures (200' Spacing) Estimated Subtotal $441,434.00 5% Construction Contingency $22,071.70 Total Estimated Construction Costs $463,505.70