Loading...
ITEM 5.3 Resolution 17-56OteVgo MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner June 26, 2017 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Flaherty 5.3 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Resolution 2017-56 Awarding 85th Street NE Improvements from 84th Street to Page Avenue in the amount of $348,949.30. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/J USTIACATION: Bids were opened for the 85th Street NE improvements Project between 84th Street to Pave Avenue on June 20, 2017. Five bids were received. The bids were as follows: Total Base Bid Total Alternate Bid 1. Hardrives, Inc. $336,790.16 1. Knife River Corporation $348,949.30 2. Knife River Corporation $343,352.05 2. Omann Brothers Paving $362,101.13 3. Oman Brothers Paving $345,435.68 3. Hardrives, Inc. $363,026.09 4. Northwest Asphalt $380,063.28 4. Northwest Asphalt $407,396.28 5. Park Construction Co. $427,675.96 5. Park Construction Co. $412,549.46 The Engineers Estimate was $326,152.02 for the Base Bid and $387,355.52 for the Alternate Bid. The Low Alternate Bid is $12,159.14 more than the Low Base Bid. The Low Alternate Bid provides 2,150 LF more new concrete curb and gutter at roughly $5.65 LF over the Low Base Bid. It is our recommendation that the City Council award the Alternate Bid for two reasons 1) very good value for additional concrete curb and gutter, 2) Curb age along the street will be consistent. The Base Bid was $10,638.14 more or approximately 3% above Engineer Estimate. The Low Alternate Bid was $38,406.26 less or approximately 10% below engineers estimate. With 15% for administration, legal, engineering and contingency, the project costs are anticipated to be around $400K. The CIP estimated project cost was $321.7K. SUPPORTING DOCUMENTS ATTACHED: • Engineer's Opinion of Construction Cost • Resolution 17-56 • Bid Tabulation POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to Approve Resolution 17-56 Accepting Bids for the 85th Street NE Improvements and award Alternate Bid Project to Knife River Corporation of Sauk Rapids, MN in the amount of $348,949.30. BUDGET INFORMATION FUNDING: BUDGETED: Fund #403 Municipal State Aid for Construction Yes - $321,700 City of Otsego 2017 State Aid Street Renewal Project 85th Street Reclamation PRELIMINARY ENGINEER'S COST ESTIMATE Bid Schedule "A" - Bituminous and Streets Item No. Spec. Ref Description Unit Estimated Quantity Unit Price Total Estimated Extension 1 2021.501 Mobilization LS 1 $9,499.57 $ 9,499.57 2 2104.513 Sawing Bit Pavement (Full Depth) LF 382 $2.50 $ 955.00 3 2106.507 Subgrade Excavation (EV) CY 1944 $3.00 $ 5,832.00 4 12211.506 Salvage Aggregate Reclaim to Stockpile (P) CY 3240 $4.50 $ 14,580.00 5 2211.506 Salvage Aggregate Reclaim from Stockpile P CY 3240 $4.50 $ 14,580.00 6 2215.501 Full Depth Reclamation P SY 10603 $2.50 $ 26,507.50 7 2232.501 Mill Bituminous Surface 1.5" SY 186 $4.00 $ 744.00 8 2357.502 Bituminous Material For Tack Coat GAL 557 $2.50 $ 1,392.50 9 2360.501 Type SP 9.5 Wearing Course Mixture 3,C TON 1253 $60.00 $ 75,180.00 10 2360.502 Type SP 12.5 Non Wear Course Mixture 3,C TON 1566 $55.00 $ 86,130.00 11 2531.507 7" Concrete Driveway Pavement SY 31 $75.00 $ 2,325.00 12 2563.601 Traffic Control LS 1 $5,000.00 $ 5,000.00 13 2573.530 Storm Drain Inlet Protection EACH 11 $75.00 $ 825.00 14 2582.501 Pavement Message Arrow - Paint EACH 5 $75.00 $ 375.00 15 2582.502 4" Double Solid Line Yellow - Paint LF 3246 $0.20 $ 649.20 16 2582.502 4" Solid Line White - Paint LF 4233 $0.10 $ 423.30 17 2582.502 12" Solid Line White - Paint LF 262 $2.80 $ 733.60 18 2582.502 24" Solid Line White - Paint LF 32 $2.80 $ 89.60 19 2582.502 24" Solid Line Yellow - Paint LF 305 $2.45 $ 747.25 20 1 2582.502 Crosswalk Marking (3'X6' Blocks) White - Paint SF 198 $1.50 $ 297.00 Total - Bid Schedule "A" Bid Schedule "B" - Storm Sewer ule "B" Bid Schedule "Cl" - Concrete (Partial Curb Removal) 246,865.52 Item Spec. Ket Description unit Estimatedm rice I otal Estimated 22a 2104.501 Remove Concrete Curb and Gutter LF 2123 $3.00 $ 6,369.00 23a 2104.511 Sawing Concrete Curb Full Depth) LF 337 $2.50 $ 842.50 24a 2531.501 Concrete Curb & Gutter Design B618 LF 2123 $25.00 $ 53,075.00 25a 2575.555 Turf Establishment LS 1 $1,000.00 $ 1,000.00 oa -f c e ue U, Bid Schedule "C2' - Concrete (Complete Curb Removal) Item Spec. Ket Description Unit Estimatedof rice I otal Estimated 22b 2104.501 Remove Concrete Curb and Gutter LF 4300 $3.00 $ 12,900.00 23b 2104.511 Sawing Concrete Curb Full Depth) LF 36 $2.50 $ 90.00 24b 2531.501 Concrete Curb & Gutter Design 8618 LF 4300 $25.00 $ 107,500.00 25b 2575.555 Turf Establishment LS 1 $2,000.00 $ 2,000.00 I otaf - fifa JCneaule --Vz p I LL,i�V.VU BASE BID Bid Schedule "A" - Bituminous and Streets $246,865.52 Bid Schedule "B" - Storm Sewer $18,000.00 Bid Schedule "Cl" - Concrete (Partial Curb Removal) $61,286.50 TOTAL CONSTRUCTION COST $326,152.02 15% Administration, Legal, & Engineering $48,922.80 TOTAL ESTIMATED PROJECT COST $375,074.82 ALTERNATE BID Bid Schedule "A" - Bituminous and Streets $246,865.52 Bid Schedule "B" - Storm Sewer $18,000.00 Bid Schedule "C2" - Concrete (Complete Curb Removal) $122,490.00 TOTAL CONSTRUCTION COST $387,355.52 15% Administration, Legal, & Engineering $58,103.33 TOTAL ESTIMATED PROJECT COST $445,458.85 SAMunicipaRAOTSEGM98 (85th Reclaim)\OT398 EngEst.xlsx Page 1 of 1 RESOLUTION NO. 2017-56 RESOLUTION ACCEPTING BID WHEREAS, pursuant to an advertisement for bids for the construction of City of Otsego, 85th Street NE Improvements, SP 217-102-009 bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Total Base Bid Total Alternate Bid 1. Hardrives, Inc. $336,790.16 1. Knife River Corporation $348,949.30 2. Knife River Corporation $343,352.05 2. Omann Brothers Paving $362,101.13 3. Oman Brothers Paving $345,435.68 3. Hardrives, Inc. $363,026.09 4. Northwest Asphalt $380,063.28 4. Northwest Asphalt $407,396.28 5. Park Construction Co. $427,675.96 5. Park Construction Co. $412,549.46 AND WHEREAS, it appears that Knife River Corporation of Sauk Rapids, Minnesota is the lowest responsible bidder for the Alternate Bid, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO MINNESOTA: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Knife River Corporation of Sauk Rapids, Minnesota in the name of the City of Otsego for the 85th Street NE Improvements, according to the plans and specifications therefore approved by the city council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the city council this 26th day of June, 2017. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk 5§§5§§§55§56d66 ))) \` ; B j \\�\\\(\))))jjGG§ ! _ . \ E §� klw;g;4; 16 C3ci 0i 60\4}/§§\/\ \ § \ )})j(\\)j}\\(\j)))}\}\) 00 161::ƒly::!! :� - !\\/z,)\ \ §))/!)!! 2!( �aar�)m/ A E —6 s e! § ) ,,a!l:smee:£a!/l��„ §�®-,j-.1 .,=s=de!!ld Y 4) d .O a` z0a O (9 F LU -M �m o co LL U F O R OD U y Q z Y co co � ( ( m §! §)@®;§ o !\ } : ] a §2®-1,,..1 1 .1 .1 e\.e;;;e2=,G;q U d O a` z0 a O 0 P LU m P E O f° im Q�0 D 41 my w 00 Q s N 6