Loading...
ITEM 3.8A Mason Ave/Martin Farms Ave^" OtCITY OF MINNESOTA 9 Request for City Council Action RECOMMENDATION: RE UE TOR: City Engineerl a ver MEETING DATE: June 10,. 2013 ORIGINATING DEPARTMENT: Public Works PRE ENTE s): City Engineer Wagner ner REVIEWED BY: ity Administrator Johnson ITEM ##: 3,8A RECOMMENDATION: City Staff Recommends final payment in the amount of$6.,623.49 for the construction of 701h Street from Marlowe re Av nue to Martin Farms Avenue. Payment is to Fehn Companies. ARE YOU SEEKING APPROVAL OF A CONTRACT? ED? IS A PUBLIC HEARING REQUIRED? No No BA KGROU DIJU TIF[CATION: 01h Street is complete. All that had remained was verification that the boulevard area established acceptable turf. SUPPORTING DOCUMENTS: X ATTACKED NONE 0 Final Pay Estimate ## MOTION: {Please word motion as you would like It to appear in the minutes. Motion to approve final payment to Fehn Companies in the amount of $6,623.49 for construction of 701h St from Harlow Avenue to Martin Farms Avenue. BUDGET INFORMATION FUNDING: BUDGETED: X `SES Municipal State Aid 11 NO ACTION TAKEN p APPROVED AS REQUESTED ❑ DEFIED oTABLED ❑ OTHER (List changes) COMMENTS: FINAL PAY ESTIMATE CITY F1 SEGS} 0th Street ConstruGfion Project Juno 31 2013 Honorable Mayor & City Council City of Otsego 8899 Nashua Avenue NE Otsego, MN 65330 RE: 70th Street Gonstructlon Contractor: Fehn Companles, Inc, Contract Amount: $359,857,61 Award Date; February 17, 2012 Complatlen Date: August 1, 201 Dear Honorable Mayor and Council ambers: The f lloWng work has been completed on the above -referenced project by Fehn Cornpanle , Inc. Bid Schedule "'All iI No, ITEM DESCRIPTION TI �# QUANTITY UNIT UNIX PRICE ONTRAOT AMOUNT T+ DATE EXTENSION 1 MOBILIZATION 1 LUMP SUM $4,892.00 4,092.00 1 4,892.00 REMOVE VE CONCRETE CURB 121 LIN FT $3.60 $ 423.60 130 $ 465.00 REMOVE WATERMAIN 40 LIN FT $18.34 $ 612.00 26 382,50 4 REMOVE BITUMINOUS PAVEMENT 210 SQYD $3,50 $ 735.00 210 735.04 5 REMOVE CONCRETE PAVEMENT 17 SQYD N0.00 $ 340,00 28 $ 680.00 REMOVE PERMANENT B RR I CADE 2 EACH $50.00 $ 100,00 2 $ 100.00 7 SAWING BITUMINOUS PAVEMENT FULL DEP 77 LII FT $450 346.50 77 $ 346.60 8 SALVAGE SIGN 1 EACH $25.60 $ 26.60 1 $ 25.50 9 COMMON EXCAVATiON (P) CU YD $5.80 $ 35,002.00 8,364 36 002.00 10 MUCK EXCAVATION E 20D CU YD $10.04 $ 2,000.00 910 $ 9,104.00 11 IAGGREGATE DAR CLASS 3 MODIFIED 9,746 TON $6.92 $ 37 688.32 7,109 42 085.28 12 AG GREGATE BAS CLASS 5 100° RU8HP 0 2t386_ TON $14.56 34,740.16 2p442 35,655.62 13 MILL BITUMINOUS SURFACE (2�1 18 SQ YD $35,70 042.60 18 $ 342.60 14 BITUMINOUS INOUS M TE IAL FOR TACIT COAT 296 GALLON $2.60 $ 740.00 220 550.00 16 ITYPE SP 0.5 WEARING COURSE MIXTURE (3.1 717 TON $62.73 44 977.41 608194 $ 38,198.81 16 TYPE SP 12.3 MON WEARING COURSE MI CTU 896 TON L61.71 $ 55,292,16 822.00 $ 60,726.62 17 4" PERF PE PIPE DRAIN 123 LIN FT $15.34 $ 1,B81.90 180 2,754.00 18 1W RO PIPE SEWER DESIGN 3006 CLASS 670 LIN FT $26.62 3 15,116.40 570 $ 16 116.40 19 18u RC PIPE SEVVER DESIGN 30M CLASS 111 764 LIN FT $26.56 21 534.24 764 21 534,24 20 21" RC PAPP SEWER DESIGN 3006 CLASS 111 10 LIN FT X10.80 $ 408,00 8 $ 326.40 21 CONNECT T EXISTING STORM SEWED 1 EACH $387.00 $ 357.00 1 $ 357.00 22 6" DUCTILE IRON PIPE SEWED CLASS 52 10 LIN FT $51.00 $ 6%00 20 $ 1,020. 23 6" DUCTILE IRON PIPE SEWER CLASS 52 100 LIN FT $57.63 5,763-00. 80 $ 4,810.40 24 18" DUCTILE IRON P ( PE S EVVE R CLASS 52 90 LIN FT $95.12 $ 8,580.80 9 8,761.04 26 V IN U ATI N 4 SQYD $W.76 $ 165.04 4 $ 165.04 25 IDUCTILE IRON FITTINGS 1;03-5 POUND $3.06 $ 3,167.10 1,036 3,167.10 27 CONNECT T EXISTING W TER. AIN 1 EACH $510-004_5i0.00 i $ 510.00 28 6" CATS VALVE AND BOX 1 EACH $1,020.00 $ 1,020.00 1 $ 1,020.00 29 GATE VALVE D D I EACH $1,479.00 1{478.00 1 'I 479+00 30 �8�'° F #1 DR NT i EACH $2,754,00 $ 764.0 L { 2,7rA.00 31 rONSTRU CT DRAI NAGE STRUCTURE DESICf 23 LIN FT $266.22 $ ID, 423.08 23 $ 8 123.08 32 GONSTRUCT DRAINAGE STRUCTURE DE81 6 LIN FT $214.20 1,265.20 5 $ 1,265.20 33 CONSTRUCT DRAINAG5 STRUTIJREIOI` 0 LIN FT 257.04f§ 1 p642.24 6 $ 1,642.24 34 GASTING ASSEMBLY 8 EACH $581,40 4,651M 8 4,65 x.20 36 B"' C NCRETE WALK 105 S FT 1 $6.60 693.14 207 $ 1,3W.20 FINAL PAY ESTIMATE CITY OF OTSEGO 70th Street Construction Project M14 .-hdnflliia 1110 ITEM NO, ITE41 DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE E TFINSION 33 CONCRETE CURB 8, GUTTER DESIGN 5018 2,334 LIN FT $9.03 070.02 2,354 21,258.02 37 TRUNCATED DOMES 1e SCS FT $30.60 $ 439,04 S $ 244.80 3B PERMANENT BARRICADES 16S LIN FT $10,00 1,680.00 188 $ 1,630.00 39 GUIDE POST TYPE B 2 EACH $33.26 76.60 76.60 46 TRAFFIC CONTROL 1 LUMP SUM $510.00 $ 510,00 1 610.00 41 SIGN PANELS TYPE C 32 SQ FT $29.89 $ 956.48 32.25 M.95 42 [N STALL SIGN 1 EACH $96.90 $ 98,94 1 96.90 43 SILT FEW TYPE WCHI E SLICED 2,426 LIN FT $1.46 $ 3,689.00 2,414 3,572.72 44 STORM DRAIN INLET PROTECTION 8 EACH $102.0 $ 814,00 816,00 45 TEMPORARY ROCK CONSTRUCTION ENTRAIN i EACH $1,000,00 1,0 .00 0 46 EROSION CONTROL BLANKETS CATEGORY 3 100 S YD $2.04 204.00 0 - 47 EROSION CONTROL i LUMP SUFI _1115%0-00 1,6N.00 1 1.6m,00 48 TURF ESTABLISHMENT 1.6 ACRE W6.00 1'3G5.60 1.60 1,305.60 +49 4" $01.ID LINE WHITE - EPDXY 2,119 LIN FT $0.30 885.70 x,097 629.10 6 4' DOUBLE BOLD LINE YELLOW - EPDXY 1'M8 LIN FT $4.01 $45.38 1,055 843.E Bid Schedule "'AA' TOTAL Total Work Completed to Date LESS PAY ESTIMATE ATE I LESS PAIS ESTIMATE # LESS PAY ESTIMATE LESS PAY ESTIMATE ## 4 AVE RECOMMEND END FINAL PAYMENT OF. Total aid S 11edulo "A" 364,667.61 33 6 350+657.61 Please verify the amount of previous payments, and the recelpt of the following items poor to making payment. 1. Sertil~tcate of claims payment (lien waiver), . Affidavit of payment of States taxes (MPJ State TAX Form IC 134), 3, Letter of consent from surety fart. APPROVAL. CONTRACTOR-. R. FEND COMPANIES, INC. Certiltcation by Contractor; I "My that all items Band amounts are correct for the work completed to slate. S19ned: Title: Lute ENGINEER: HAKANSON ANDERSON Certification by Engineer: 1#w!a re m e final payment for work and quantitles as shoven. Signed: Tltle: '° Date 1NI�l: CITY OF OTSEGO 19ned: Tike: mate 5: 1unlcJpaM TSEG MTay EstimatesW386pe,xls PE -2 331,174.69 'l#7,9 $ 331,174.59 106,344.94 1 62,690.06 $ K480.33 11 L135.7 3557 1 61623.49