ITEM 3.6A City Project 16-03t�ezo TV OF`./ MINNESOT DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner July 24, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Consent Item City Administrator/Finance Director Flaherty 3.6A AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of payment in the amount of $2,672.85 for the 70th Street Trail, from 72" d Street to Queens Avenue, City Project No. 16-03 to Fehn Companies, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? T ISA PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FICATION: All work for the Quaday Avenue project has been completed by Fehn Companies and their subcontractors. The trail was paved September 2016. A 5% retainage was held until vegetation has been established which it has. All erosion control has been removed. The pay estimate is in the amount of $2,672.85 for a final project cost of $53,457.03. The original contract amount was for $52,103.00. The final project cost slightly exceeds the original contract amount mainly due to the need to move additional dirt to provide good slopes along the property to the south. SUPPORTING DOCUMENTS ATTACHED: • Final Pay Estimate (PE #2) POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve payment to Fehn Companies, Inc. in the amount of $2,672.85 for the 70th Street Trail, City Project No. 16-03. BUDGET INFORMATION FUNDING: BUDGETED: 203 Park Development Fund Yes FINAL. PAYMENT CITY OF OTSEGO 70th Street Trail City Improvement Project No. 16-03 Date: July 13, 2017 Honorable Mayor & City Council City of Otsego 13400 90th Street NE Otsego, MN 65330 RE: 70th Street Trail (72nd Street to Queens Avenue), City Improvement Project No. 16-03 Contractor. Fehn Companies, Inc. Contract Amount: $52,103.00 Award Date; July 11, 2016 Completion Date: September 15, 2016 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Fehn Companies, Inc, o,u om,euwn r ITEM MnIDOT NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USEDTO DATE EXTENSION 1 2021.601 MOBILIZATION 1 LS $3150.00 $3150.00 1.00 $ 3,150.00 2 2104.601 REMOVE CONCRETE CURB & GUTTER 11 LF $24.00 284.00 11 $ 264.00 3 2104.603 REMOVE BITUMINOUS PAVEMENT 12 SY $22.00 $264.00 12 264.00 4 12104.513 ISAVANG BIT PAVEMENT FULL DEPTH 84 LF $4.50 $378.00 84 $ 378.00 5 2104.623 SALVAGE AND REINSTALL SIGN 2 EA $105.00 210.00 0 $ - 6 2112.601 SUBGRADE PREPARATION 7 RDST $250.00 $1,750.00 7 $ 1.750.00 7 2105.601 COMMON EXCAVATION E 113 CY $15,00 1,695.00 113 $ 1,695.00 8 2105.623 COMMON BORROW L 185 CY $14.00 $2.,59D,001 230 $ 3,22000 9 2105.635 SALVAGE TOPSOIL FROM STOCKPILE C 256 CY $5.00 $1.280.00 250 $ 11280.00 10 2211.501 AGGREGATE BASE CLASS 5 MOD 248 TON $21.00 $6,208.001 291.00 8111.00 11 2360.501 TYPE LV WEARING COURSE MIXTURE KB) 117 TON $89,00 $10,4 3.00 102,32 $ 9106.48 12 2531,501 CONCRETE CURB & GUTTER DESIGN B812 36 LF $42.00 $1.598.00 33 $ 1.386.00 13 2531.501 4" CONCRETE WALK PED RAMPS 353 SF $9.001 $3177,00 281 $ 2,629.00 14 2531.618 TRUNCATEDDOMES 60 SF $52.50 $3150.00 64 3300.00 15 2545.602 ADJUST UTILITY HANDHOLE (QWEST) 1 EA $160,00 $160.00 1.00 160.00 16 2573.502 SILT FENCE, MS 265 LF $4.20 $1,113.0 264 1,108.80 17 2574.525 ORGANIC TOPSOILBORROW L 60 CY 1 $24.00 $1200,00 64 1636.00 18 2576.623 EROSION CONTROL BLANKET - CATEGORY 2 240 SY 3.15 766.00 765 $ 2,409.76 19 2575.555 TURF ESTABLISHMENT 1 LS 43.150.00 $3,160.00 1 3160.00 20 2503.641 12" RC FLARED END SECTION 1 EA $733.001 $733.00 1 $ 733,00 21 2603.541 12" RC PIPE SEWER DESIGN 3008 CL V ALL DEPTHS 76 LF $40.00 43,040.00 78 3,040.00 22 2506.601 CONSTRUCTE DRAINAGE STRUCTURE - 30" CONNECT TO EXISTING P 1 EA $5132.00 $5132.00 1 $ 5132.00 23 2606.522 ADJUST FRAME AND CASTING 1 EA $210,00 $210.00 1 $ 210.00 24 2616.603 ARTICULATED INTERLOCKING BLOCK OPEN CELL, TYr 7 SY $212.00 $1,484.001 7 $ 1,484.00 Total Bid Schedule "A" $52,103,00 $63,467.03 S:Vdun1dpaPAoT8EG017251PAY ESTIMATMOT725 PE.xBx PE -3 FINAL PAYMENT CITY OF OTSEGO 70th Street Trail City Improvement Project No, 16.03 Bid Schedule "A" $52,103.00 $53,457.03 TOTAL $52,103.00 $63,457.03 TOTAL WORK COMPLETED TO DATE LESS PAY ESTIMATE #1 WE RECOMMEND PAYMENT OF: Please verify the amount of previous payments, and the receipt of the following Items prior to making payment. 1. Certificate of claims payment (lien waiver). 2, Affidavit of payment of stale taxes (MN State Tax Form IC 134). 3. Letter of consent from surety firm, APPROVALS: CONTRACTOR: FEHN COMPANIES, INC Certs ro�lion by Contractor: lAertify that all Items and amounts are correct for the work completed to date. Signed: Title: r !) Vt Y d (�� ✓ Date `i ) ENGINEER: HAKAN ON ANDERSON ASSOCIATES, INC. Cedificati Engineer, W on�Cn ayment forwork ap nd gpantilies as shown. Signed, / Title: 2�5 OWNER: CITY OF OTSEGO Date $:V,1un1dpaMOTsEGo\72MPAY ESMIMATMOT725 PE.Asx PE4 $53,457.03 $ 60,784.18 $2,672,85