Loading...
ITEM 3.6B 70th St/Marlow Ave/Martin Farms Avenue!Aj, Request for ot 1 F 0 City Action I N5SOT DEPARTMENT I fF I MATI I r .:-:.__-.._._.:�w- == `_..-_._ry.:-......:-.........:.:..:....:..::...:.:...:....:...:.:...:.:._-:..:..:.w:::-..:_.-:.w::=_:w:w..__:.w:n.-_.....:._:-::nn:..._::.._.n:_:.:.:n...._- .., n ..............-..._..... -.....w.-....._-....-......- _...�__.-..�__w_...- - - v.v_-.n....................n...-.....-.....-..........-............_.......-.....-_.n..............w RIGINATI DEPARTENT: E SUE T : MEETI I DATE: Public forks Ron Wagner, iter Engineer July 'h 2013 PRE ENTER( ): REVIEWED BY: ITE( #: Rory Wagner, City Engineer CityAdministrator Johnson 3,6B AGENDA ITEM DETAILS RECOMMENDATION: City Staff Recommends final payment in the amount of $7,861.30 for the construction of `h Street from Marlowe Avenue to Martin Farms Avenue. Payment is to Fehn Companies. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED' No No BAC R U DIJU TIFI ATION: 7th Street is complete. All that had remained was verification that the boulevard area established acceptable turf. Final quantities have been confirmed and negotiated with the contractor. SUPPORTING DOCUMENTS: ATTACHED NONE Ar Final Payment (Pair Estimate #5) POSSIBLE ACTIONS ..*.........:.::.:.-:..:.:n.::.:n:...n.....-:.._:..v.n:.:._............................................. ............_.....-....................... ........ _v'............x......................._._._.._.-n..n.....-...._..._...--- -------..._.............._............_..-........................-........-.............. ... ..... ... TIo�I: ... ...... . . Motion to approve final payment to F hn Companies in the amount of $7.,861.30 for construction of 70th St from Marlow Avenue to Martin Farms Avenue. BUDGET INFORMATION FUNDING: Municipal State Aid ACTION TAKE{ BUDGETED: X YES oN APPROVED AS REQUESTED n DENIED n TABLED In OTHER (List changes) COMMENTS: TS: FINAL. PA` MENT CITY OF OTSEGO 70th Street Construction Project July 3, 2013 Honorable Mayor & City Council City of Otsego 8899 Nashua Avenue NE Otsego, NIN 55384 RE: 70th Street Construction Contrac tof: Fehn Cornpanlas, Inc. GontracA Amount: $350,657.51 Award Date: February 17, 2012 Cornpletlon Date: August 1, 2012 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Fehn Companles, Inc. Rid nhodif1i% "A+: ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOU NT USED TO DATE EXTENSION 1 MOBILIZATION 1 LUMP SUM $4892.00 A892,00 1 $ 4892,00 2 REMOVE CWC1 ETE CURB 121 LIN FT $3.60 423.60 130 $ 455.00 3 R EMOVE WATERMA1N 40 LIN FT $15.30 512,00 26 $ 352.50 4 REMOVE 81TUM IN US PAVEMENT 210 SO YD $3.50 $ 738.00 210 $ 735.00 6 REMOVE CONCRETE PAVEMENT 17 SQ YD $20.00 $ 340.00 28 $ 660.00 6 REMOVE PERMANENT BMRICADE 2 EACH $50,00 100.00 2 $ 100.00 7 SA NG BITUMINOUS PAVEMENT FULL, DEPT 77 LIN FT $4.50 348.84 77:--$ 3+45.50 8 SALVAGE SfGN 1 EACH $25.0 5 25.50 1 26,50 9 COMMON EXCAVATION P 6,364 CU YD $5.50 35,002.00 6 364 35 0'42.40 10 MUCK EXCAVATION E 200 CU YD $10.00 $ 2,000.00 910 9140.04 11 1AGGREGATE BASE CLASS 3 M019FIED 9,746 TON $5.92 57 698.32 7,109 S 42 088,28 12 AGGREGATE BASE CLASS 5 100•=; CRUSHED) 385 TON $14.56 34.74 0. 16 2,442 S 35 655.52 13 MILL BITUMINOUS OUS SURFACE - 18 80 YD 535.74 $ 642.60 18 $ 542.60 14 BITUMINOUS MATERIAL FCR TACK GOAT 296 GALLON $2.50 5 740.00 220 $ 550.00 16 TYPE SP 9.6 WEARING COURSE MI CTURE 3 B 717 TO $62.73 $ 44 977.41 608.94 $ 38195.81 16 TYPE SP 12.5 NON WEARING COURSE MI {T€]RE 3 B 9"o TON $81.71 $ M,292.16 822.00 60,725,62 11 l4u PERF FE PIPE DRAIN 123 LIN FT $15.30 $ 1'881.90 180 $ 2,754.00 18 15" RC PIPE SEWER DESIGN 3006 CLASS V 670 LIN FT $26.52 $ 15116,44 570 16 116.40 19 18" RC PIPE SEWER DESIGN 3008 CLASS 111 754 LIN FT $28,66 $ 21 534,24 754 $ 21,W,24 20 2J" RC RIPE SEWER DESIGN 3006 CLASS 111 10 LIN FT $40,60 448.04 8 $ 323,40 21 ICONNECT TO EXISTING STORM SEWER 1 EACH $357.40 $ 357.00 1 $ 357.00 22 6" DUCTILE IRON PIPE SEWER CLASS 62 10 LIN FT $51.00 $ 610.00 20 $ 1 520.00 23 B" DUCTILE IRON PfPE SEINER CLASS 52 100 LIN FT $57.53 $ 5,76100 SO $ 4,610.40 4 %' DUCTILE IRON PIPE SENDER CLASS 52 90 LIN FT $95J2 $ 8,660.80 92 $ 8,751-04 5 4" INSULATION 4 So YO $35.76 165.44 4 $ 155.04 26 I1XJQTILE IRON FITTINGS 1,035 POUND $3.06 $ 3107,10 1 575 4,819.50 27 1 00NNECT TO EXISTING 1+ ATER&LAIN 'I EACH $510.00 $ 510.00 1 510.00 28 - GATE VALVE AND BOX 1 E H $1,020.00 1,020.00 1 $ 1 020.00 29 64 GATE VALVE AND BOX 1 EACH $1479.00 1,479.00 1 1,479.00 0 HYDRANT 1 EACH $2 76CGO 5 2,754.00 1 $ 754.00 31 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 23 UN FT $266,22 6123.06 28.47 $ 7,579,2 32 CONSTRUCT DRAINAGE STRUCTURE DESIGN H 6 LII FT $214.20 $ 1,265.20 3.0 542.60 33 CONSTRICT DRA1NAG E STRUCTURE DESIGN SPECIAL. 6 LIN FT $257.04 $ 1,542.24 6.2 1,69165 4 CASTING ASS E M BLY 8 EACH $581.40 4,651,20, 8 4,651-20 35 16" CONrRETE WALK 105 SQFT $6.60 683.00 207 $ 1,366,20 S.VAun.!dpa11A0TSECCO1 851Payr EsV1matesVM6pe, l PE- I FINAL PAYMENT CITY OF OTSEGO 70th Street Construction Project 01A Qr+haef i i1a "All ITEM NO. ITEM DESCRIPTION ESTIMATED UANTiT UNIT CONTRACT UNIT PRIDE CONTRACT AMO UNT USED TO DATE EXTENSION 36 CONCRETE CURB & GUTTER DESIGN B618 2,334 LIN ET $9.03 211076.02 2.354 S 21$256,62 37 TRUNCATED DOMES 16 SGS ET $30.60 $ 489.86 8 $ 244.80 38 PERkmr=NT BARRICAD ES 168 LIN FT $10.00 1,6m00 168 $ 1,6W.00 39 GUIDE POST TYPE B 2 EACH $38.28 76.56 2 $ 76.60 40 Tf RAF FIC CONTROL 1 LUNI P SUM X10.00 510.00 1 $ 610.00 41 SIGN PANELS TYPE C 32 SQ FT $29.89 556.48 32.25 963.95 42 INSTALL SIGN 1 EACH $96.910 98.50 1 $ 96.90 43 SILT PENvCE TYPE MACHIN SLICED 23425 LIN FT $1.48 $ 3,589.00 2,414 3672.72 44 STORM 0RN N INLET PROTECTION 8 EACH $102.00 S 816.00 6 616.00 45 TE M PO RARY ROC CON STf UCT1 ON ENTR NCE 1 EACH $1,000.00 $ 1,000.00 0 $ 46 EROSION CQNTR L BLAN KETS CATEGORY 3 100 SQ YD $2.04 $ 204.00 0 $ - 47 ERO$1ON CONTROL I LUMPSUM $1,5W.00 1.500.00 1 48 ITURF ESTABLISHMENT 1.6 ACRE s16.00 $ 1,306+60 1.60 $ i 305.60 49 4" SOLID LINE WHITE -EPDXY 2 119 LIQ! ET $0.30 $ 835.70 2,097 $ 629.10 50 4" DOUBLE SOLID LINE YELLOW- EPDXY 1 058 LIQ! ET $0.61 $ 645.38 1,055, $ 643.55 Total Bid Schedule "A" 360,667.61. 333,692.02 harp a Order leo. 1 TEM ESTIMATED CONTRACT UNIT USED TO NO. ITEM DESCRIPTION N QUANTITY UNIT PRICE CONTRA TAMOUNT I DATE EXTENSION 1 i A RE ATE BASE CLASS 3 M DIKED -€]EDUCT 1 9,748 1 TON 1 -$0.16 (1.764-'28)1 7,1NJ $ t1,279.8: Total Change Order No.1 Bid Schedule "" Charge Order No. 1 TOTAL. Total Work Completed to Date LESS PAY ESTIMATE # I LESS PAY ESTIMATE LESS PAY ESTIMATE # 3 LESS PAY ESTIMATE ft 4 WE RECOMMEND FINAL PAYMENT F: _...�...................... ..� x,754. �- 350,657.51 (1,784.28). Please verify the amount of previous paymants, and the receipt of the following Items prior to rnal!ng payment. 'l. Certificate of clalms payment (Ilam waiver), . Affidavit of payment of States tars (MN State TALC Form 10 134), . Latter of consent from surely firm. APPROVALS: CONTRACTOR: FEND COMPANIES, INC. Certification b Contractor: 1 ceriify that all items and amounts are correct for the work completed to date. Signed: Title: Data ENGINEER: HAi' ANSON ANDERSON ert#ficaticn by Engineer. Wo recommend final payment for work and quantities as shown. Signed: Title: Date OWNER: CITY OF OTSEGO Signed: Title: Date SNMun1olpaRA0TSE(30W5kPay E UrmtesW385pe.As PE -2 (I,27.2t 333,692.02 (1,279.62) 3$2,412.40 $ 332s412.40 54,480.3 IM 35.77 $ 7,861.38