Loading...
ITEM 5.1C Soccer field lightsRequest for CITY OF City Council Action Qtsego MINNESOTA DEPARTMENT INFORMATION ORIGINATING DEPARTMENT: REQUESTOR' MEETING DATA: Public Works I Ron Wagner,, City Engineer July 8, 2013 PRE, ELATE REVIEWED BY: ITEM #: Ron. Wagner,, City Engineer Lori Johnson, City Administrator 5-1C AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of quote from Wright Hennepin Cooperative Electric for the supplying power & street lights for the soccer fields. ARE YOU SEEKING APPROVAL OF A CONTRACT? Yes IS A PUBLIC HEARING REQUIRED? No BACKGROUNDIJUSTIFICATION' Wright Hennepin Cooperative Electric supplies power for the area around the soccer fields. The booster station which pumps water out of the pond behind the Public Works Building for irrigating the soccer field requires 3 phase 480 volt power. The quote includes installing underground power from 90'h Street back to the middle of the soccer parking area. At that point Wright Hennepin Cooperative Electric will set both a single phase and a 3 phase transformer. The single phase will supply power to the four streets lights a n d to the control cabinet for the irrigation system. 3 phase power w 111 be extended to th e booster station, The quote from Wright Hennepin Cooperative Electric to complete this work is $16.,912.50. Our cost estimate from the March 14., 2013 memo to the Council regarding soccer field comprehensive cost was $15,950. SUPPORTING DOCUMENTS; X ATTACHED NONE 0 Wright Hennepin Cooperative Electric Quote 0 Plans and Specification for Soccer Field Street Lights and Power Supply Motion: Motion to approve Wright Hennepin Cooperative Electric quote of $16,912.50 for the soccer field street lights and power supply. BUDGET INFORMATION FUNDING: 208 Community Facilities TPA BUDGETED' X YES MILTUS, I ACTION TAKEN AP P ROVE D AS REQUESTED D DENIED o TABLED D OTHER (List changes) -COMMENTS: Wright -Hennepin Cooperative E lectric Association 6800 Electric Drive * P.O. Box 330 * Rockford., MN 55373 Fax (612)477-3054 4 Phone (612)477-3000 * 1-800-943-2667 Line Ext eiisimi Cost Estimate Organization Responsible for Charges: City of Otsego 4144 Nashua Ave Otsego WN 55330 Afro: Ron Wagner/ Dan Li lit Location Requiiijenients: City Of Otsego Park Lighting The city of Otsego is constnicting several soccer fields, with family parking near Otsego City hall. Lighting is requested for the area to be maint ahied by Wi-ight Hennepin. A Monthly Rate for each of the 4 (qty) fixtures is (%V -H Rate AC-5S12.75/iiioiitlicaclifixttire+tax,PCA ) Desci-iption of Lighting Unit Cost ( 4 qty Light poles at pa0ung area conien) Shoe Box 250 Nvatffl-PS, Multi -volt LAG-Auto/HPF, Standard Pole Mount 35" Fiberglass. Direct Burled Pole Installation Jotal Assembly Cost . . . . . . . . . . 4 6 .. 4 a 4 4 no, 4 , 4 in .., 4 r it $7,901100 Installation of Single Phase ti-ansfonnet .. .................. $450.00 Installation of Three Phase ti-ansfonner . 06141SIMMENJEMIGNIN go 1614*191 IN love pop lost@ 16614, boom imbed item I mem IN I NO@ 191 NO s2puo Installationof Thive Plunse undei-p-ound line 0404 1 Ifidemael I ISO 101101101401116101011111011, powl4s pop stoma oe, oam me, isomemoteeitio v votow, on $6s562.50 I' Total Chai-ge: $165912.50 I agree to pay the actual construction cost for this project base on the above cost estimate. Final cost will be based on anial consti-tiction footage, and will be invoiced afler the work has been compteted. State and local taxes Neill be applied. Signature: Prepared By: Wayne Bauernschmitt' OTSEGO SOCCER FIELDS POWER SUPPLY AND STREET LIGHT �Tc.T NE La Lj L � � �L 90 1H STREET NE ' �I. � OTSEGO PUBLIDIN WORK BUILDIN P OJ EC L CATIO I�LW� _111771- %'01 1 1 w 1 %w 1 %—j " W %l WRIGHT COUNTY, MINNESOTA I 2000 a 1400 2000 Civil Engineers and Lund Surveyors SCALE FEET 3601 Thurston Ave., Anoka, Minne o#a 55303 763-427-5860 FAX 763-427-0520 SHEET 1 OF 4 SHEETS 0T720 -2U12 WRIGHT HENNEPIN TP, 30'STREET LIGHT w/ 24" BASE TRANSFORMER m E�somtnt imu Doc- No4 251134 p -(H DIRECTIONAL DRILLfRORE UNDER GINIEL PARKING LOT TREES REMOVED APPROX1MATELY I O' WIDE AND TRIMMED 12' ABOVEGROUND VU-MIZE WATERLINTE -[AUT OF POND P-" Icy P-" Aid ROX. 400)F'r TO 1300STER POWE�T IRRIGATION BOOST, R UTNP STATION LIT in CY Iy L PUBLIC` 'WORKS RUIADIN FUTURE WATERLINE - OUT OF BUILDING,, CONNECT TO EXISTING STOWNI PIPE, AND TO POND P -,*I P-Oi ?--OH SOCCER F;ELbS--PHASE2-4-8A--d.-3 Haan Anderson OTSEGO SOCCER FIELDS Civil Englneers and Land Surveyors 3601 Thurston Ave., Anoka, Minnesota 55303 CITY PROJECT 13-05 763-427-5860 FAX 763-427-0520 www.hau—ine.com ELM STREET LIG I ITS SHALL WRIGHT- TIENNEPIN'S STANDARD ASSEMBLY. ALL STREET LIGHT FOUNDATIONS SHALL BE EXTENDED 24" ABOVE THE FINISHED GROUND. BOOSTER PU.,NIP STATION REQUIRES 460 VOLT, PHASE III LINE 76 0 75 150 SCALE IN FEET POWER SUPPLY 'SHEET 2 AND STREET LIGHTS OF 2 SHEETS CITY OF OTSEGO, MINNESOTA Xj OT720-2013 WRIGHT HENNEPIN TYP. 30' STREET LIGHT iv/ 24" BASE POWER TO IRRIGATION CONTROLPANEL WRIGHT HENNEPIN TYP. 30' STREET LIGIIT w/ 24" BASE 11 no NV141GHT HENNEPIN TYP. 0' S'T'REET LIG ItTiv/ 24 BASF, WRIGHT HENNEPIN TP, 30'STREET LIGHT w/ 24" BASE TRANSFORMER m E�somtnt imu Doc- No4 251134 p -(H DIRECTIONAL DRILLfRORE UNDER GINIEL PARKING LOT TREES REMOVED APPROX1MATELY I O' WIDE AND TRIMMED 12' ABOVEGROUND VU-MIZE WATERLINTE -[AUT OF POND P-" Icy P-" Aid ROX. 400)F'r TO 1300STER POWE�T IRRIGATION BOOST, R UTNP STATION LIT in CY Iy L PUBLIC` 'WORKS RUIADIN FUTURE WATERLINE - OUT OF BUILDING,, CONNECT TO EXISTING STOWNI PIPE, AND TO POND P -,*I P-Oi ?--OH SOCCER F;ELbS--PHASE2-4-8A--d.-3 Haan Anderson OTSEGO SOCCER FIELDS Civil Englneers and Land Surveyors 3601 Thurston Ave., Anoka, Minnesota 55303 CITY PROJECT 13-05 763-427-5860 FAX 763-427-0520 www.hau—ine.com ELM STREET LIG I ITS SHALL WRIGHT- TIENNEPIN'S STANDARD ASSEMBLY. ALL STREET LIGHT FOUNDATIONS SHALL BE EXTENDED 24" ABOVE THE FINISHED GROUND. BOOSTER PU.,NIP STATION REQUIRES 460 VOLT, PHASE III LINE 76 0 75 150 SCALE IN FEET POWER SUPPLY 'SHEET 2 AND STREET LIGHTS OF 2 SHEETS CITY OF OTSEGO, MINNESOTA Xj OT720-2013 QUOTATION FORM To: City of Otsego Project: Otsego Soccer Fields - Power Supply and Street Lights Proposal of: (hereinafter called the "Bidder"), organized and existing under the laws of the State of and doing business as The Bidder hereby ,proposes to perform all work for the construction of the above referenced Project in accordance with the attached Construction Plans, Work will be awarded on .duly 3, 2013. All work shall be completed by August 1, 2013. All labor, material, equipment and other expenses required to complete this project; as shown on the Construction ction Plans shall be considered incidental unless otherwise noted and provided for below. Bidder agrees to perform all the word described in the Construction dans and contract Documents for the following unit prices and/or lump sums, which include sales tax and other applicable takes and fees. ITEMII ESTIMATED No. ITEM DESCRIPTION QUANTITY UNIT PRICE EXTENSION 1 Installation of transformer 1 LS LS 2 Installation of underground line for street lights 1 LS LS Installation of underground line to Booster Pump Station 1 LS Ls 4 - and Assemblies wi light pole bases " Above EA EA Total Quotation Respectfully submitted: Attest: Signature Title Address Date - CSF -1 00300 CITY OF OTSEGO SERVICES CONTRACT AGREEMENT, made this day of 1 2013, between the CITY OF OTSEGO, a political subdivision ("CITY") and RECITALS 0 C' CONTRACTOR"); CITY has awarded to CONTRACTOR the job described below, Description of Project: The work consists of installation of a transformer if necessary), approximately 1,500 ft. of underground power lines, and street lights (including bases). The fines shall be sized to Provide sufficient power to: (3) Holophane Mongoose Luminalre. Street Lights (15 0 Watts HP S Mulivolt) (1) Irrigation Power Control Panel (_ 800 Watts) and (1) Booster Pump Station (- Watts) All lines shall be buried a minimum of 36" below the finished ground surface. The power line(s) will be located west of the gravel parking lot. along the ,avid to the booster punsp station sufficient all trees and tLIMPS and trimming of branches tip to a point 12 feet above the ground along a 10 foot x 50 foot long swath through a wooded area between the newly constructed Otsego Soccer Fields and the irrigation pond north of the Otsego Public Works building. There are approximately teii (10) trees to be removed, see attached construction plans and photos. The Contractor's Quotation dated 2013 is attached as part of this contract. The project will be completed by July 151" of 2013. I . Contract Performance. CONTRACTOR shall complete performance of the PROJECT in accordance with the Project Description, Construction Plans, and Contractor's Quote dated 52013. 2. Compliance with Applicable Regulations. CONTRACTOR. shall, pursumit to performance, comply with all applicable rules, regulations, statutes or ordinances of any other unit or agency of goverranent, including but not limited to those relating to non- discrimination in hiring or labor practices, payment of all required withholding taxes, workers' compensation and unemployment compensation insurance, liability insurance, OSHA or other safety tiles and regulations, construction practices, environmental practices, wetland protection measures, vehicular safety and/or weight restrietions, reffise disposal practices, and notices to employees, whether or not such rules, regulations, statutes or ordinances are set forth or adopted by reference in the Submission Requirements herein. Pursuant to Laws of Minnesota 1995, Chapter 3 1, if CONTRACTOR shall fail to pay any subcontractor hired by CONTRACTOR under this project within 10 days after CONTRACTOR receives payment from CITY for work for which CONTRACTOR is liable to any subcontractor, CONTRACTOR shall be liable to the subcontractor for interest on the unpaid balance, at the rate of 1.5 per cent per n-ionth. Any subcontractor aggrieved by CONTRACTOR'S failure to remit payment to the subcontractor shall, for the purpose of enforcement, be considered a third -party beneficiary of this contract. However, nothing in. this contract shall be deemed to itupose upon CITY any duty to monitor, enforce or otherwise become revolved in payments from CONTRACTOR to any subcontractor. 3. Indeninification. CONTRACTOR shall indeiluu*fy and save harmless CITY from any liability arising out of COI TI failure to observe compliance with Paragraph 2 above, specifically including, without limitation, liability arising out of the improper disposal or storage of any hazardous waste by CONTRACTOR or any entity hired or used by CONTRACTOR for such disposal. 4. Warranty of Workmanship and Timely Completion. L -i addition to any warranty which might be a pant of the Plans and Specifications Proposal, CONTRACTOR warrants that all work completed in connection with the PROJECT shall be done in a worlanaillike and timely maiuier in accord with applicable industry standards, Where materials are being frimn-ished by CONTRACTOR, CONTRACTOR warrants that all materials will be of good quality and suited for the purpose for which they are intended. 5. Comliance with Statutm Reouirenients fNje.a I A. Data Practices Complianc Contractor inay have access to data collected or 1-naintained by the City to the extent necessary to perfomi Contractor's obligations. under this contract. Contractor agrees to maintain all data obtained fi-ons the City in the same manuier as the City is required under the Mhuiesota. Government Data Practices Act, Minnesota StatUtes Chapter 13. Contractor will not release or disclose the contents of data classified as not public to any person except at the written direction of the City. Contractor agrees to defend and indemnify the City from any claim, liability, damage or loss asserted against the City as a result of Contractor's failure to con-1ply with the requirement of the Act or this contract. Upon termination of this contract, Contractor agrees to return data to the City, as requested by the City. B. Worker's Conn)ensatioii Contractor shall, at the time of execution of this contract, ftirnish evidence satisfactory to the City that Contractor maintains or is exempt from maintaining Worker's Compensation coverage, pursuant to Miluiesota Statutes Chapter 176.182. C. Income Tax Withli Prior to the time of final payment of any amounts owing to Contractor under this agreement, Contractor shall furnish a copy of Form I C- 13 4, certified by the Minnesota Depatiment of Revenue, documenting that all withholding tax requirements have been observed by Contractor. D. Audit Pursuant to Mhuiesota Statutes Chapter 160.05 (subd. 5), the books and records of Contractor which are relevant to the services being perforined under this Contract shall be subject to inspection in accord with said statute, for a period of six years from the date of final 1yn-ient hereunder. 6. Performance and Payment Security (Check One X Contractor is not required to post any performance and payment security as a condition of this Contract by reason of the fact that the contract amount is for less than $75,000.00, and City is not requiring performance security. Contractor is required to post performance and payment security acceptable to the City, even though the contract price is less that $75,000.00. Contractor is required to post performance and payment security because the contract price is more than $75,000.00. Ar e: Regardless of which option above ischeckecl, ifl-vifonnance ancipayment secin-ity is i-e(juh-eco; the secia-ify shall meet that standarcls outlined in Minnesota Statutes Chal),tei* 574.26 7. Notices Any notice which is or should be required to be given to CONTRACTOR shall be sufficient if addressed as follows, and deposited, postage prepaid, in the regular United States Mail. Notice shall be deemed to have been -received on the third business day following the postmark: (contractot) (address) 8. Termination Either party may terininate this agreement on 30 days written notice to the other. 9. Payment City shall remit to Contractor the amounts billed for services assuming that Contractor has fully complied with all of the terms of this agreement, completing the project in a finiely and compliant mainier. IN WITNESS WHET EOF, the parties have executed this Agreement the date above written. CITY OF OTSEGO By Jessica Stockat%) Mayor By Tari Loft' City Clerk CONTRACTOR is Its