RECOMMENDATION:
Staff recommends approval of quote from Wright Hennepin Cooperative Electric for the supplying
power & street lights for the soccer fields.
ARE YOU SEEKING APPROVAL OF A CONTRACT?
Yes
IS A PUBLIC HEARING REQUIRED?
No
BACKGROUNDIJUSTIFICATION'
Wright Hennepin Cooperative Electric supplies power for the area around the soccer fields. The booster
station which pumps water out of the pond behind the Public Works Building for irrigating the soccer
field requires 3 phase 480 volt power. The quote includes installing underground power from 90'h Street
back to the middle of the soccer parking area. At that point Wright Hennepin Cooperative Electric will
set both a single phase and a 3 phase transformer. The single phase will supply power to the four
streets lights a n d to the control cabinet for the irrigation system. 3 phase power w 111 be extended to th e
booster station, The quote from Wright Hennepin Cooperative Electric to complete this work is
$16.,912.50. Our cost estimate from the March 14., 2013 memo to the Council regarding soccer field
comprehensive cost was $15,950.
SUPPORTING DOCUMENTS; X ATTACHED NONE
0 Wright Hennepin Cooperative Electric Quote
0 Plans and Specification for Soccer Field Street Lights and Power Supply
Motion:
Motion to approve Wright Hennepin Cooperative Electric quote of $16,912.50 for the soccer field street
lights and power supply.
BUDGET INFORMATION
FUNDING:
208 Community Facilities
TPA
BUDGETED' X YES
MILTUS,
I
ACTION TAKEN
AP P ROVE D AS REQUESTED D DENIED o TABLED D OTHER (List changes)
-COMMENTS:
Wright -Hennepin Cooperative E lectric Association
6800 Electric Drive * P.O. Box 330 * Rockford., MN 55373
Fax (612)477-3054 4 Phone (612)477-3000 * 1-800-943-2667
Line Ext eiisimi Cost Estimate
Organization Responsible for Charges:
City of Otsego
4144 Nashua Ave
Otsego WN 55330
Afro: Ron Wagner/ Dan Li lit
Location Requiiijenients:
City Of Otsego Park Lighting
The city of Otsego is constnicting several soccer fields, with family parking near Otsego City hall. Lighting is requested
for the area to be maint ahied by Wi-ight Hennepin.
A Monthly Rate for each of the 4 (qty) fixtures is (%V -H Rate AC-5S12.75/iiioiitlicaclifixttire+tax,PCA
)
Desci-iption of Lighting Unit Cost
( 4 qty Light poles at pa0ung area conien)
Shoe Box 250 Nvatffl-PS, Multi -volt LAG-Auto/HPF, Standard Pole Mount
35" Fiberglass. Direct Burled Pole Installation
Jotal Assembly Cost . . . . . . . . . . 4 6 .. 4 a 4 4 no, 4 , 4 in .., 4 r it $7,901100
Installation of Single Phase ti-ansfonnet .. .................. $450.00
Installation of Three Phase ti-ansfonner . 06141SIMMENJEMIGNIN go 1614*191 IN love pop lost@ 16614, boom imbed item I mem IN I NO@ 191 NO s2puo
Installationof Thive Plunse undei-p-ound line 0404 1 Ifidemael I ISO 101101101401116101011111011, powl4s pop stoma oe, oam me, isomemoteeitio v votow, on $6s562.50
I' Total Chai-ge: $165912.50
I agree to pay the actual construction cost for this project base on the above cost estimate. Final cost will be based on
anial consti-tiction footage, and will be invoiced afler the work has been compteted. State and local taxes Neill be
applied.
Signature:
Prepared By: Wayne Bauernschmitt'
OTSEGO SOCCER FIELDS
POWER SUPPLY AND STREET LIGHT
�Tc.T
NE
La
Lj
L � � �L
90 1H STREET NE ' �I.
�
OTSEGO PUBLIDIN
WORK BUILDIN
P OJ EC
L CATIO
I�LW�
_111771-
%'01 1 1 w 1 %w 1 %—j " W %l
WRIGHT COUNTY, MINNESOTA
I
2000 a 1400 2000
Civil Engineers and Lund Surveyors SCALE FEET
3601 Thurston Ave., Anoka, Minne o#a 55303
763-427-5860 FAX 763-427-0520 SHEET 1 OF 4 SHEETS
0T720 -2U12
WRIGHT HENNEPIN
TP, 30'STREET
LIGHT w/ 24" BASE
TRANSFORMER
m
E�somtnt imu Doc- No4 251134
p -(H
DIRECTIONAL
DRILLfRORE
UNDER GINIEL
PARKING LOT
TREES REMOVED
APPROX1MATELY
I O' WIDE AND
TRIMMED 12'
ABOVEGROUND
VU-MIZE WATERLINTE -[AUT OF POND
P-" Icy P-"
Aid ROX. 400)F'r TO 1300STER
POWE�T IRRIGATION
BOOST, R UTNP STATION
LIT
in
CY
Iy
L
PUBLIC`
'WORKS RUIADIN
FUTURE WATERLINE -
OUT OF BUILDING,,
CONNECT TO EXISTING
STOWNI PIPE, AND TO
POND
P -,*I P-Oi ?--OH
SOCCER F;ELbS--PHASE2-4-8A--d.-3
Haan Anderson OTSEGO SOCCER FIELDS
Civil Englneers and Land Surveyors
3601 Thurston Ave., Anoka, Minnesota 55303 CITY PROJECT 13-05
763-427-5860 FAX 763-427-0520
www.hau—ine.com
ELM
STREET LIG I ITS SHALL WRIGHT-
TIENNEPIN'S STANDARD
ASSEMBLY.
ALL STREET LIGHT FOUNDATIONS
SHALL BE EXTENDED 24" ABOVE
THE FINISHED GROUND.
BOOSTER PU.,NIP STATION
REQUIRES 460 VOLT, PHASE III
LINE
76 0 75 150
SCALE IN FEET
POWER SUPPLY 'SHEET
2
AND STREET LIGHTS OF
2
SHEETS
CITY OF OTSEGO, MINNESOTA Xj
OT720-2013
WRIGHT HENNEPIN
TYP. 30' STREET
LIGHT iv/ 24" BASE
POWER TO IRRIGATION
CONTROLPANEL
WRIGHT HENNEPIN
TYP. 30' STREET
LIGIIT w/ 24" BASE 11
no
NV141GHT HENNEPIN
TYP. 0' S'T'REET
LIG ItTiv/ 24 BASF,
WRIGHT HENNEPIN
TP, 30'STREET
LIGHT w/ 24" BASE
TRANSFORMER
m
E�somtnt imu Doc- No4 251134
p -(H
DIRECTIONAL
DRILLfRORE
UNDER GINIEL
PARKING LOT
TREES REMOVED
APPROX1MATELY
I O' WIDE AND
TRIMMED 12'
ABOVEGROUND
VU-MIZE WATERLINTE -[AUT OF POND
P-" Icy P-"
Aid ROX. 400)F'r TO 1300STER
POWE�T IRRIGATION
BOOST, R UTNP STATION
LIT
in
CY
Iy
L
PUBLIC`
'WORKS RUIADIN
FUTURE WATERLINE -
OUT OF BUILDING,,
CONNECT TO EXISTING
STOWNI PIPE, AND TO
POND
P -,*I P-Oi ?--OH
SOCCER F;ELbS--PHASE2-4-8A--d.-3
Haan Anderson OTSEGO SOCCER FIELDS
Civil Englneers and Land Surveyors
3601 Thurston Ave., Anoka, Minnesota 55303 CITY PROJECT 13-05
763-427-5860 FAX 763-427-0520
www.hau—ine.com
ELM
STREET LIG I ITS SHALL WRIGHT-
TIENNEPIN'S STANDARD
ASSEMBLY.
ALL STREET LIGHT FOUNDATIONS
SHALL BE EXTENDED 24" ABOVE
THE FINISHED GROUND.
BOOSTER PU.,NIP STATION
REQUIRES 460 VOLT, PHASE III
LINE
76 0 75 150
SCALE IN FEET
POWER SUPPLY 'SHEET
2
AND STREET LIGHTS OF
2
SHEETS
CITY OF OTSEGO, MINNESOTA Xj
OT720-2013
QUOTATION FORM
To: City of Otsego
Project: Otsego Soccer Fields - Power Supply and Street Lights
Proposal of:
(hereinafter called the "Bidder"), organized and existing under the laws of the State of
and doing business as
The Bidder hereby ,proposes to perform all work for the construction of the above referenced Project in
accordance with the attached Construction Plans, Work will be awarded on .duly 3, 2013. All work shall be
completed by August 1, 2013. All labor, material, equipment and other expenses required to complete this
project; as shown on the Construction ction Plans shall be considered incidental unless otherwise noted and provided
for below.
Bidder agrees to perform all the word described in the Construction dans and contract Documents for the
following unit prices and/or lump sums, which include sales tax and other applicable takes and fees.
ITEMII
ESTIMATED
No.
ITEM DESCRIPTION
QUANTITY
UNIT PRICE
EXTENSION
1
Installation of transformer
1
LS
LS
2
Installation of underground line for street lights
1
LS
LS
Installation of underground line to Booster Pump
Station
1
LS
Ls
4
-
and Assemblies wi light pole bases " Above
EA
EA
Total Quotation
Respectfully submitted:
Attest:
Signature
Title
Address
Date -
CSF -1 00300
CITY OF OTSEGO SERVICES CONTRACT
AGREEMENT, made this day of 1 2013, between the CITY OF OTSEGO, a
political subdivision ("CITY") and
RECITALS
0 C' CONTRACTOR");
CITY has awarded to CONTRACTOR the job described below,
Description of Project:
The work consists of installation of a transformer if necessary), approximately 1,500 ft. of
underground power lines, and street lights (including bases). The fines shall be sized to
Provide sufficient power to:
(3) Holophane Mongoose Luminalre. Street Lights (15 0 Watts HP S Mulivolt)
(1) Irrigation Power Control Panel (_ 800 Watts) and
(1) Booster Pump Station (- Watts)
All lines shall be buried a minimum of 36" below the finished ground surface. The power
line(s) will be located west of the gravel parking lot. along the ,avid to the booster punsp
station sufficient all trees and tLIMPS and trimming of branches tip to a point 12 feet above
the ground along a 10 foot x 50 foot long swath through a wooded area between the newly
constructed Otsego Soccer Fields and the irrigation pond north of the Otsego Public Works
building. There are approximately teii (10) trees to be removed, see attached construction
plans and photos. The Contractor's Quotation dated 2013 is attached as part of this
contract. The project will be completed by July 151" of 2013.
I . Contract Performance. CONTRACTOR shall complete performance of the
PROJECT in accordance with the Project Description, Construction Plans, and Contractor's
Quote dated 52013.
2. Compliance with Applicable Regulations. CONTRACTOR. shall, pursumit to
performance, comply with all applicable rules, regulations, statutes or ordinances of any
other unit or agency of goverranent, including but not limited to those relating to non-
discrimination in hiring or labor practices, payment of all required withholding taxes,
workers' compensation and unemployment compensation insurance, liability insurance,
OSHA or other safety tiles and regulations, construction practices, environmental practices,
wetland protection measures, vehicular safety and/or weight restrietions, reffise disposal
practices, and notices to employees, whether or not such rules, regulations, statutes or
ordinances are set forth or adopted by reference in the Submission Requirements herein.
Pursuant to Laws of Minnesota 1995, Chapter 3 1, if CONTRACTOR shall fail to pay any
subcontractor hired by CONTRACTOR under this project within 10 days after
CONTRACTOR receives payment from CITY for work for which CONTRACTOR is
liable to any subcontractor, CONTRACTOR shall be liable to the subcontractor for interest
on the unpaid balance, at the rate of 1.5 per cent per n-ionth. Any subcontractor aggrieved by
CONTRACTOR'S failure to remit payment to the subcontractor shall, for the purpose of
enforcement, be considered a third -party beneficiary of this contract. However, nothing in.
this contract shall be deemed to itupose upon CITY any duty to monitor, enforce or
otherwise become revolved in payments from CONTRACTOR to any subcontractor.
3. Indeninification. CONTRACTOR shall indeiluu*fy and save harmless CITY from
any liability arising out of COI TI failure to observe compliance with Paragraph
2 above, specifically including, without limitation, liability arising out of the improper
disposal or storage of any hazardous waste by CONTRACTOR or any entity hired or used
by CONTRACTOR for such disposal.
4. Warranty of Workmanship and Timely Completion. L -i addition to any warranty
which might be a pant of the Plans and Specifications Proposal, CONTRACTOR warrants
that all work completed in connection with the PROJECT shall be done in a worlanaillike
and timely maiuier in accord with applicable industry standards, Where materials are being
frimn-ished by CONTRACTOR, CONTRACTOR warrants that all materials will be of good
quality and suited for the purpose for which they are intended.
5. Comliance with Statutm Reouirenients
fNje.a I
A. Data Practices Complianc
Contractor inay have access to data collected or 1-naintained by the City to the extent
necessary to perfomi Contractor's obligations. under this contract. Contractor agrees
to maintain all data obtained fi-ons the City in the same manuier as the City is
required under the Mhuiesota. Government Data Practices Act, Minnesota StatUtes
Chapter 13. Contractor will not release or disclose the contents of data classified as
not public to any person except at the written direction of the City. Contractor
agrees to defend and indemnify the City from any claim, liability, damage or loss
asserted against the City as a result of Contractor's failure to con-1ply with the
requirement of the Act or this contract. Upon termination of this contract,
Contractor agrees to return data to the City, as requested by the City.
B. Worker's Conn)ensatioii
Contractor shall, at the time of execution of this contract, ftirnish evidence
satisfactory to the City that Contractor maintains or is exempt from maintaining
Worker's Compensation coverage, pursuant to Miluiesota Statutes Chapter 176.182.
C. Income Tax Withli
Prior to the time of final payment of any amounts owing to Contractor under this
agreement, Contractor shall furnish a copy of Form I C- 13 4, certified by the
Minnesota Depatiment of Revenue, documenting that all withholding tax
requirements have been observed by Contractor.
D. Audit
Pursuant to Mhuiesota Statutes Chapter 160.05 (subd. 5), the books and records of
Contractor which are relevant to the services being perforined under this Contract
shall be subject to inspection in accord with said statute, for a period of six years
from the date of final 1yn-ient hereunder.
6. Performance and Payment Security (Check One
X Contractor is not required to post any performance and payment security as a
condition of this Contract by reason of the fact that the contract amount is for less than
$75,000.00, and City is not requiring performance security.
Contractor is required to post performance and payment security acceptable to the
City, even though the contract price is less that $75,000.00.
Contractor is required to post performance and payment security because the
contract price is more than $75,000.00.
Ar e: Regardless of which option above ischeckecl, ifl-vifonnance ancipayment secin-ity is
i-e(juh-eco; the secia-ify shall meet that standarcls outlined in Minnesota Statutes Chal),tei*
574.26
7. Notices
Any notice which is or should be required to be given to CONTRACTOR shall be
sufficient if addressed as follows, and deposited, postage prepaid, in the regular
United States Mail. Notice shall be deemed to have been -received on the third
business day following the postmark:
(contractot)
(address)
8. Termination
Either party may terininate this agreement on 30 days written notice to the other.
9. Payment
City shall remit to Contractor the amounts billed for services assuming that
Contractor has fully complied with all of the terms of this agreement, completing
the project in a finiely and compliant mainier.
IN WITNESS WHET EOF, the parties have executed this Agreement the date above written.
CITY OF OTSEGO
By Jessica Stockat%)
Mayor
By Tari Loft'
City Clerk
CONTRACTOR
is
Its