Loading...
ITEM 3.4A Watermain Extension Project 17-06OtkgoF MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner August 14, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Consent Item City Administrator/Finance Director Flaherty 3.4A AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Pay Estimate #1 in the amount of $293,553.80 for the Kadler Avenue Watermain Extension, City Project No. 17-06 to LaTour Construction, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROU ND/JUSTI ACAT] ON: The work has progressed along Kadler Avenue with approximately%of the directional drilling completed by LaTour Construction and their subcontractors. The remaining directional drilling as well as 100% of the direct bury pipe remains to be completed. This payment is being made for the completion of the work through August 4th, 2017. Pay Estimate #1 is for $293,553.80. Total contract amount of the project is $762,520.25. In accordance with Minnesota Statute, the City is withholding the maximum of 5% retainage of work completed, which accounts to $15,450.20 at this time. SUPPORTING DOCUMENTS ATTACHED: • Pay Estimate No. 1 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #1 to LaTour Construction, Inc. in the amount of $293,553.80 for the Kadler Avenue Watermain Extension, City Project No. 17-06. BUDGET INFORMATION FUNDING: BUDGETED: Water Utility Operating Fund 601-49400-530 Yes PAY ESTIMATE #1 CITY OF OTSEGO KADLER AVENUE WATERMAIN EXTENSION PROJECT August 8, 2017 Honorable Mayor & City Council City of Otsego 13400 801h Street Otsego, MN 55330 RE: Kadler Avenue Walerrnafn Extension, City Project No. 17.05 Contractor. LaTour Construction, Inc. Contract Amount: $762,520.25 Award Dale: June 19, 2017 Completion Dale: September 1, 2017 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by LaTour Construction. Inc. old Sclwdulo "A" ITEMESTIMATED NO. SPEC,NO. ITEM DESCRIPTION QUANTITY UNIT CONTRACTUNIT PRICE CONTRACT AMOUNT USEDTO DATE EXTENSION 1 2021.601 MOBILIZATION 1 LS 58,300.00 $ 6.300.00 0.75 8 225.00 2 2104.521 SALVAGE & REINSTALL 36' RCP 10 LF $44.00 S 440.00 3 21D4.623 SALVAGE& REINSTALL 38' RC APRON 1 EA 5875.00 S $75.00 S 4 2104.523 SALVAGE A REINSTALL MAILBOX 3 EA 597.00 201.00 S 5 2118.601 AGGREGATE SURFACING CLASS 5 6 TON $61.001s 388.00 S 8 2501.511 24'C8 PIPE APRON 1 EA $485.00 S 485.00 S 7 2601.511 24'08 PIPE CULVERT 9 LF $40.00 S 414.00 S 8 2871 12' BUTTERFLY VALVE & BOX 5 EA $2.300.00 S i t 500.00 1 3 2,300.00 9 2811 16' BUTTERFLY VALVE & BOX 3 EA $2,960.00 $ 6 880.00 1 $ 2,960.00 70 2611 6' GATE VALVE & BOX 14 EA $1,260.00 S 17,S00.00 3 S 3,750.00 11 2611 CONNECT TO EXISTING WATERMAIN 1 EA 51,510.005 1,510.60 $ 12 2611 HYDRANT 14 EA $3.770.00 S 52,780.00 31 S 11,310.00 13 2811 12•WATERMAINPIPE •HORIZONTAL DIRECTIONAL DRILLING $.689 LF $75.00 S 426A75.00 2.999 5 22492$.00 14 2814 12` WATERMAIN PIPE 48 LF 543.00 $ 1,978.00 10 S 430.00 15 2811 16' WATERMAIN PIPE • HORIZONTAL DIRECTIONAL DRILLING 263 LF $146.00 S 38396.00 270 S 39.420.00 18 2817 18' WATERMAIN PIPE 2.462 LF $59,00 S 144 808.00 35 S 2,065.00 17 2811 8' DUCTILE IRON PIPE CL 52 125 LF 1 $37.00 $ 4.625.00 19 $ 703.00 78 2811 4 -INSULATION 13 BY $47.00 $ 811.00 $ 19 2611 IOUCTILE IRON FITTINGS 8,731 LBS 5315 S 27502.85 2.005U$10.120 2563.601 TRAFFIC CONTROL I LS $1 865.00 $ 1885.00 0.72 2564.602 PORTABLE CONCRETE BARRIERS 24 EA $160.00 $ 3,840.00 2422 2573.502 SILT FENCE TYPE MACHINE SLICED 3.422 LF 1.55 3 5364.10 380 23 2573.530 CULVERT INLET PROTECTION 2 EA 5140.0(1 S 280.00 S 24 2576.523 EROS ION CONTROL BLANKET CAT 3 1.750 SY 51.25 S 2.187.50 $ 25 2576.605 TURF ESTABLISHMENT 1 ACRE $1,245.001$ 1,245.OD S Total Bid 3cbedule "A" $ 162,620.25 Bld Schedule "A" TOTAL Total Work Completed to Date LESS 6% RETAINAGE WE RECOMMEND PAYMENT OF: CONTRACTOR: LATOUR CONSTRUCTION, INC. Cer116callon by Contractor. I cerllty ti l Items and amounts are correct for the work completed to date. Signed: �. .._ '"IIe:�OS-firCT '"`FW1>�&r-2 Data ENGINEER: HAKANSO ANDERSON Ced6icalion b gineer. We recon d payment for work and quantities as shown. Signed: Title r Date OWNER: CITY OF OTSEGO S:1MunlcipaiWOTSEGO01WAYESTIMATESIOT631 PE.)dsx PE -1 $ 762,620,26 $ 762,620.25 $ 309,004«00 $ 309,004,00. $ 309,004.00 $ 309,004.00 $ 15,450.20 $ 293,663,80