Loading...
ITEM 3.5D Street Reclamation Project 17-050 tsTyF zo MINNESOTA < DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner September 25, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Consent Item 3.51D AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Pay Estimate #1 in the amount of $314,209.27 for the 85th Street Reclamation Project, City Project No. 17-05 to Knife River Corporation. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The work has been completed along 85th Street from Page Avenue to 84th Street. All curb and gutter has been removed and replaced, the street has been reclaimed, paved and striped, and final turf establishment has been completed. Only the verification that vegetation has been established remains to be completed. Pay Estimate #1 is for $314,209.27. The total work completed to date is $330,746.60. The total original contract amount of the project is $348,949.30. In accordance with Minnesota Statute, the City is withholding the maximum of 5% retainage of work completed, which accounts to $16,537.33 at this time. SUPPORTING DOCUMENTS ATTACHED: • Pay Estimate No. 1 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #1 to Knife River Corporation in the amount of $314,209.27 for the 85th Street Reclamation Project, City Project No. 17-05. BUDGET INFORMATION FUNDING: BUDGETED: Otsego Municipal State Aid Yes Date: September 15, 2017 Honorable Mayor & City Council City of Otsego 13400 90th Street NE Otsego, MN 55330 RE: 85th Street Reclamation Project SAP 217-102-008 Contractor: Knife River Corporation Award Date: June 20, 2017 Completion Date: September 15, 2017 Dear Honorable Mayor and Council Members; The following work has been completed on the above -referenced project by Knife River Corporation Rid Qeh.A In "A" _ Ri6,m(nnna ..A str..otc ITEM NO. Mn/DOT SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2021.501 Mobilization 1.00 LS $20,000.00 $ 20,000.00 1.00 $ 20 000.00 2 2104.513 Sawing Bit Pavement Full Depth) 337 LF $2.00 $ 674.00 380 $ 760.00 3 2106.507 Sub rade Excavation E 1944 CY $12.50 $ 24 300.00 1787 $ 22,087.50 4 2211.506 Salvage Aggregate Reclaimto Stockpile EV 3240 CY $3.00 $ 9,720.00 2945 $ 8.835.00 5 2211.506 Salvage Aggregate Reclaimfrom Stockpile EV 3240 CY 1 $3.50 $ 11,340.00 2945 $ 10,307.50 6 2215.501 lFull Depth Reclamation P 10603 SY 1 $1.00 $ 10603.00 10603 $ 10 603.00 7 2232.501 IMill Bituminous Surface 2.0" 54 SY 1 $20.00 $ 1,080,00 41 $ 820.00 8 2357.502 1 Bituminous Material For Tack Coat 565 GAL 1 $2.00 $ 1,132.00 550 $ 1,100.00 9 2360.501 lType SP 9S Wearing Course Mixture (3,C) 1273.00 TON $60.00 $ 76 380.00 1224.00 73,440.00 10 2360.502 Type SP 12.5 Non Wear Course Mixture (3,C) 1592.00 TON $60.00 $ 95 520.00 1410.00 $ 84,600.00 11 2531.507 7" Concrete Drivewa Pavement 34 SY $81.00 2.754.00 110 $ 8 910.00 12 2503.601 Traffic Control 1 LS $6000.00 $ 8,000.00 1 $ 8,000.00 13 2573.530 Storm Drain Inlet Prolaclion 11 EACH $90.00 $ 990.00 11 $ 990.00 14 2573.502 Silt Fence Type MS 80D LF $2.00 $ 1,600.00 0 $ 15 2574.535 Stabilized Construction Exit 2 LS $1.00 $ 2.00 0 $ 16 2582.501 Pavement Message (Arrow)- Paint 5 EACH $70.00 $ 350.00 3 $ 210.00 17 2582.502 4" Double Solid Line Yellow - Paint 3246 LF $0.52 $ 1,687.92 2470 $ 1,284.40 18 2582.502 4" Solid Line Mile - Paint 4233 LF $0.26 $ 1,100.58 3610 $ 938.60 19 2582.502 12" Solid Line Nhite - Paint 282 LF $3,00 $ 786.00 332 $ 996.00 20 2582.502 24" Solid Line Mite - Paint32 LF $3.20 $ 102.40 29 $ 92.80 21 2582.502 24" Solid Line Yellow- Paint 305 LF $2.60 $ 793.00 91 $ 236.60 22 2582.502 Crosswalk Markin 3'X6' Blocks White - Paint 1 198 SF $2.80 $ 554.40 234 $ 655.20 i otai tJla bcneaule "A" JiZba,4tia.JV ;Z54,atiti.bU Bid Schedule "B" -Storm Sewer ITEM NO. Mn/DOT SPEC, NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USEDTO DATE EXTENSION 23 2104.523 Salva o Casting3 2104.501 Remove Concrete Curb and Gutler EACH $350.00 $ 1,050.00 5 $ 1,750.00 24 2508.516 Casting Assembly 5 EACH $850.00 $ 4,250.00 3 $ 2,550.00 25 2506.602 ]Repair Drainage Stucture 8 EACH $350.00 $ 2,800.00 8 $ 2,800.00 i otai w o bcneouie"u" 3b,tuy.yu WAUU.Uu Rid Srhari„Iw "C:T'. r,n,.rwtw ic-i t" r.,,,h R,.,", H ITEM NO. Mn/DOT SPEC, NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE $7,100,00 CONTRACT AMOUNT USED TO DATE EXTENSION 26 2104.501 Remove Concrete Curb and Gutler 4300 LF $3.50 $ 15 050.00 4180 $ 14,630.00 27 2104.511 Sawing Concrete Curb Full Depth) 36 LF $5.00 $ 180.00 20 $ 100.00 28 2531.501 Concrete Curb & Gutter Design 8618 4300 LF $12.50 $ 53 750.00 4180 $ 52 250.00 29 2575.555 Turf Establishment 1.00 LS $2,400.00 $ 2,400.00 0.75 $ 1,800.00 Bid Schedule "A" Bid Schedule "B" Bid Schedule "C2" TOTAL TOTAL WORK COMPLETED TO DATE LESS 5% RETAINAGE: WE RECOMMEND PAYMENT OF: APPROVALS: CONTRACTOR: KNIF IV Certification b lra I Signed: Title: ENGINEER: HA NSON ANDE CertifigpW15y Enginee . We Signed: Title: ,R4P' a OWNER: CITY OF OTSEGO iotai niabcneouie "l -d" an,Jau.vu 4ou'lou.uu $269,469.30 $254,866.60 $8,100,00 $7,100,00 $71,380.00 $68,780,00 $348,949.30 $330,746.60 $ 16,537.33 $314,209.27 ORPORATION certify that all items and amounts are correct for the work completed to date. Title: Date TES, INC. and quantities as shown