Loading...
ITEM 3.5B Watermain extension Project 17-06O 0tSTe F o MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner October 9, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Consent Item City Administrator/ Finance Director Flaherty 3.5B AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Pay Estimate #3 in the amount of $330,769.10 for the Kadler Avenue Watermain Extension, City Project No. 17-06 to LaTour Construction, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/1 USTIFICATION: The work has progressed along Kadler Avenue with all of the directionally drilling complete and all of the open cut pipe being installed by LaTour Construction and their subcontractors. Testing and disinfection along with general cleanup remains This payment is being made for the completion of the work through September 30th, 2017. Pay Estimate #3 is for $330,769.10. The total work completed to date is $1,000,033.00. The total contract amount of the project is $1,015,234.50. In accordance with Minnesota Statute, the City is withholding the maximum of 5% retainage of work completed, which accounts to $50,001.65 at this time. SUPPORTING DOCUMENTS ATTACHED: • Pay Estimate No. 3 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #3 to LaTour Construction, Inc. in the amount of $330,769.10 for the Kadler Avenue Watermain Extension, City Project No. 17-06. BUDGET INFORMATION FUNDING: BUDGETED: Water Utility Operating Fund 601-49400-530 Yes PAY ESTIMATE #3 CITY OF OTSEGO KADLER AVENUE WATERMAIN EXTENSION PROJECT October 4, 2017 Honorable Mayor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 RE: Kadler Avenue Watermain Extension, City Project No. 17-06 Contractor: LaTour Construction, Inc. Contract Amount: $1,015,234,5 Award Date: June 19, 2017 Completion Date: October 15, 2017 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by LaTour Construction, Inc. Bid Schedule "A" - Road Construction ITEM NO. SPEC, I NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2021.501 MOBILVATION 1 LS $$,$00,00 $ 8 300.00 1.00 $ 8,300,00 2 2104.521 SALVAGE & REINSTALL 36" RGP 10 LF $44.00 $ 440.00 16 $ 704.00 3 2104.523 SALVAGE & REINSTALL 36" RG APRON 1 EA $675.00 $ 876.00 1 $ 876.00 4 2104.623 SALVAGE & REINSTALL MAILBOX 3 EA $07.00 $ 291.00 $ 5 1 2118.501 IAGGREGATE SURFACING CLASS 5 6 TON $61.00 $ 366.00 $ 744.00 6 2501.511 24" CS PIPE APRON 1 EA $485.00 $ 485.00 $ 7 2501.511 24" CS PIPE CULVERT 9 LF $46,00 $ 414.00 $ 8 2611 12"BUTTERFLY VALVE & BOX 6 EA $2,300X0, 3 11,500,00 5 11600.00 9 2811 16" BUTTERFLY VALVE & BOX 3 EA ,2 ,060.00 $ 8,860.00 2 $ 5,920.0D 10 2611 8" GATE VALVE &BOX 14 EA $1,250.00 $ 17 500.00 14 $ 17 690.00 11 2611 CONNECT TO EXISTING WATERMAIN 1 EA $1,610,00 1 610.00 1 $ 1510,00 12 2611 HYDRANT 14 EA $3 770.00 $ 52 780,00 14 $ 52 780.00 13 2611 12" WATERMAIN PIPE - HORIZONTAL DIRECTIONAL DRILLI 5,689 LF $76.00 $ 426 675.00 5 480 $ 409 600.00 14 2611 12" WATERMAIN PIPE 46 LF $43,00 $ 1,978.00 39 1677.00 15 2611 16" WATERMAIN PIPE- HORIZONTAL DIRECTIONAL DRILLI 263 LF $146.00 $ 38 398.00 270 $ $9,420.00 16 2611 18" WATERMAIN PIPE 2.452 LF $59.00 $ 144 668.00 2 377 $ 140,243.0D 17 2611 6" DUCTILE IRON PIPE OL 52 125 LF $37.00 $ 4 625.00 99 3,663.00 18 2611 4" INSULATION 13 5Y $47.00 $ 011.00 13 811,00 19 2611 DUCTILE IRON FITTINGS 8731 LBS $3,15 $ 27602,66 10 080 $ 31 889.00 20 2563,601 ITRAFFIC CONTROL 1 LS $1,866.00 $ j'865.00 1.OD 1,865.00 21 2504.602 IPORTABLE CONCRETE; BARRIERS 24 EA $160,00 $ 3,840.00 50 $ 8,960.00 222573.502 SILT FENCE TYPE MACHINE SLICED 3,422 LF $1.551$ 6304,10 680 $ 1023.00 23 2573.530 CULVERT INLET PROTECTION 2 FA $140.001$ 280,00 $ 24 2575.523 EROSION OONTROL BLANKET CAT 3 1,750 SY $1,251$ 2187,50 1 046 $1 307.80 25 2575.605 TURF ESTABLISHMENT 1 ACRE $1 245.00 $ 1 245.00 0.70 $ 871.50 Total Bid Schedule "A" $ 762,520,25 $ 738,919.00 Work Order No.1 ITEM NO. SPEC, NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2021.601 MOBILIZATION FOR DEEP SEWER i LS $3 500.00 3.600.00 1 t $1500.00 2 2104,521 SALVAGE AND REINSTALL EXISTING CMP 16 LF 464.00 $ 1024.00 16 $ 1,024.00 3 2118.501 AGGREGATE SURFACING CLASS 6 ie8 TON $26.25 $ 4 410.00 $ 4 2663.601 TRAFFIC CONTRO i LS $775.00 $ 775.00 6 2573.602 SILTFENCE TYPE MACHINE SLICED 2,000 LF 1.55.$ 3,100.00 480 $ 744.00 8 2673.530 CULVERT INLET PROTECTION 2 EA $140.00 $ 280.00 $ 7 2 75.605 TURF ESTABLISHMENT 1.5 ACRE $1,245.00 $ J,867.0 8 2611 10" GATE VALVE & BOX 3 EA $Z 810.00 $ 7 830.00 T3$ 7830.00 9 2611 18"BUTTERFLYVALVE&BOX 5 EA 2960.00 $ 14800.00 1000.00 S:xmunlGpaiWUiShiC;u1331%vAY t.5 IMAI k51V 531 Pt.xisx PAY ESTIMATE #3 CITY OF OTSEGO KADLER AVENUE WATERMAIN EXTENSION PROJECT 10 2611 6" GATE VALVE & BOX 6 EA $1,280.04 $ 6,250.00 5 $ 6,260.00 11 2811 CONNECT TO EXISTING WATERMAIN 1 EA $1,610.00 $ 1'510,00 1 $ 1,510.00 12 26i1 HYDRANT 5 EA $3,770.00 $ 18 860,00 5 18 860,00 13 2611 10" DUCTILE IRON PIPE CL 62 99 LF 48.76 $ 4,826.26 100 $ 4,875.00 14 2611 16" PVC DR 18 WATERMAIN PIPE 2,490 LF $59.00 $ 148 010.00 2,786 $ 164,316.00 15 2611 6" DUCTILE IRON PIPE CL 52 50 LP $37.00 $ 1 850.00 52 $ 1,924.00 116 2611 DUCTILE IRON FITTINGS 4,790 LBS $3.15 $ 15,088.60 4,520 $ 14,238.00 17 2621 CONNECT TO EXISTING MANHOLE W1 INSIDE DROP 1 EA $0,000.0 $ 9,000.00 1 $ 9,000.00 16 2621 CONNECT TO EXISTING MANHOLE W/CORE 1 EA $6,500,00 $ 5,60D.00 1 $ 580000 19 2621 8" PVC SDR 35 SEWER PIPE 20' - 22' DEPTH 78 LF $68.601s 6,343.00 1 84 $ 5,754.00 Total Work Order#1 Schedule Bid Schedule "A" Work Order No, 1 Schedule TOTAL Total Work Completed to Date LESS 5% RETAINAGE LESS PAY ESTIMATE #1 LESS PAY ESTIMATE #2 WE RECOMMEND PAYMENT OF: CONTRACTOR: LATOUR CONSTRUCTION, INC. Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. Signed:____ �� Titke —tovcr Date to ENGINEER: HAKANSON ANDERSON Certification by Engineer: We rgXgn M OWNER: CITY OF OTSEGO payment for work and quantities as shown, Title: Date S:Wunlclpa11AOTSEG015311PAY ESTIMATES1OTb31 PE.xlsx n PE -2 $ 262,714,25 $ 762,520.26 $ 252,714.25 $ 1,015,234,50 $ 260,114,00 $ 739,919,00 $ .260,114.00 $ 1,000,033.00 $ 1,000,033,00 $ 60,001.65 $ 293,653,80 $ 326,708,46 $ 330,769,10