Loading...
ITEM 3.5C Lefebvre Greenway Trailots"' o MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner October 9, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator Flaherty 3.5C AGENDA ITEM DETAILS RECOMMENDATION: Approve Pay Estimate #1 in the amount of $48,539.87 to C. W. Houle, Inc. for work completed on the Lefebvre Creek Greenway Trail. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: A portion of the Lefebvre Creek Greenway Trail is located on land deeded to the City as part of the original Crimson Ponds West development. With the progression of the Boulder Creek project and the completion of the Lefebvre Creek Greenway within Boulder Creek, a trail connection from 75th St south has been constructed with this project. During construction of the trail, depths of top soil and water table issues were encountered. To ensure a stable trail bed for longevity of the trail, additional topsoil needed to be removed and in one area where water table was encountered pit run and fabric was added to strengthen the trail bed. This caused items 3, 4 & 5 to increase above plan quantities. An additional minor work order for the pit run and fabric is anticipated. We are estimating that cost to be $1,600. Those increases total almost $15,600. There were savings by using existing silt fence and not needing the stabilized construction entrances which amounted to $3,700. We do not anticipate any significant increase or decreases going forward. Currently, this trail is completed to the stage where only the asphalt and restoration are left. The asphalt will be placed when Boulder Creek 3rd streets are paved. The project has a November 15th completion deadline. The original quote accepted by council is $74,497.80. SUPPORTING DOCUMENTS ATTACHED: • Pay Estimate #1 • Photo of water table issue POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #1 in the amount of $48,539.87 to C. W. Houle, Inc. for work completed on the Lefebvre Creek Greenway Trail. BUDGET INFORMATION FUNDING: BUDGETED: 203 — Park Development Yes PAY ESTIMATE #1 CITY OF OTSEGO Lefevbre Creek Greenway Trail October 3, 2017 Honorable Mayor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 RE: Lefevbre Creek Greenway Trail Contractor. C.W. Houle, Inc. Contract Amount: $74,497.80 Award Date: July 24, 2017 Completion Date: November 15, 2017 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by C.W. Houle, Inc. ITEM NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACTAMOUNT USED TO DATE EXTENSION 1 Mobilization 1 LS $ 500.00 500.00 1 $ 500.00 2 Remove Curb and Gutter 16 LF $ 20.00 $ 320,00 16 $ 320.00 3 Common Excavation P 565 CY 12.30 $ 7.195.50 974 $ 11 980.20 4 A re ato Base Class 3 or 4 1,152 TON $ 12.60 $ 14 515.20 1,489 $ 18,761.40 5 A re ate Base Class 5 556 TON $ 21.00 $ 11 676.00 792 16 632.00 6 Type SP 12.5 Wearing Course Mature (2,B) 247 TON $ 86.80 $ 21 439.60 0 $ 7 Concrete Curb & Gutter Design B618 32 LF $ 35.00 1 $ 1.120.00 0 $ 8 4" Concrete Sidewalk 17 SY 5 76.00 $ 1,29200 0 $ 9 Truncated Domes 40 SF $ 62.00 $ 2,480.00 0 $ 10 Silt Fence Type MS 2,893 LF $ 1.50 $ 4,339.50 1,934 $ 2,901.00 11 I Storm Drain Inlet Protection 10 E4 265.00 $ 2,650.00 0 $ 12 Stabilized Construction Exit 2 LS $ 1,150.00 $ 2,300.00 0 13 Turf Establlshment 1 ILS $ 4,670.00 $ 4,670.00 01 $ QUOTE TOTAL Total Work Completed to Date LESS 5% RETAINAGE: WE RECOMMEND PAYMENT OF: APPROVALS: CONTRACTOR: C.W. HOULE, INC. Certif�bC cator'I cert', Title: �r�s i �s� ENGINEER: HAKANSON ANDERSON Certification by Engineer: We reporr OWNER: CITY OFOTSEGO Total Quote 1 74,497.80 $ 51,094.60 $ 74,497.80 $ 51,094.60 $ 51,094.60 $ 51,094.60 $ 2,554.73 $ 481539.87 that all jams and amounts are correct for the work completed to date. payment for work and quantities as shown. Title: Date o1726 pe PE -1 "Are !Zt,