Loading...
2017 City of Elk River StudyFire Station Feasibility and Facility Study for: Elk River Fire Department Elk River, MN August 16, 2017 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies INTRODUCTION The Elk River Fire Department has been serving the community of Elk River as a paid-on-call department since 1881. Most recently the department has been utilizing two fire stations, Station No. 1 located at 415 Jackson Ave NW and Station No. 2 located at 13073 Orono Parkway NW. Station No. 1 was constructed in 1972 and served as the Cities only station until Station No. 2 was constructed in 2003. Station No. 2 currently serves as the Department’s headquarters station and is joined with the Police Department in the City of Elk River Public Safety Building. There are a number of developing issues in the City of Elk River that are pertinent to the need or direction of this study: The City has a number of barriers that have an impact on response time including Highway 10, Highway 169, the Mississippi River, and the BNSF Railroad. Station No. 1 was constructed in 1972 and has had a number of renovations and expansions. Elk River Fire Department has for the past several years offered firefighter training to candidates from surrounding communities. This effort is a revenue generator for the department. The Department has little in the way of training facilities. Both Stations No. 1 & 2 have classroom style training rooms, but the department lacks any purpose built training facilities for the physical aspects of their training. The Elk River Fire Department currently provides fire service to the City of Elk River, Big Lake Township and the City Otsego. This study uses GIS mapping to determine the best possible arrangement of stations in the community to provide best possible response times. From that data comes a series of recommendations regarding remodeling, expansion and new facilities. Facility recommendations are also provided regarding the Elk River Police Department. The Police Department facilities were designed with some shell space provided for future expansion or growth within the department. The Law Enforcement section of the report examines the Police Department’s operations to explore the need for expansion or renovations. The Study also looks at the question of training facilities for the entire City. Fire, police, municipal utilities and public works all have a need for training. A portion of the study examines the concept of a centralized training facility for the City. The City of Otsego has been considering the construction of a fire station at the intersection of 85th Street and Park Street to better serve their City. This station would assumedly be constructed by Otsego and operated by Elk River Fire Department. The study includes this station location and its impact on both Elk River and Otsego. TABLE OF CONTENTS 1. Station Location and Response Time Study 2. Space Needs Analysis 3. Law Enforcement Center 4. Regional (City Wide) Training 5. Conclusions and Recommendations 6. Appendix 1 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies SECTION 1 – STATION LOCATION AND RESPONSE TIME STUDY Five Bugles Design and our GIS mapping partner, Graef Engineering, used GIS mapping technology to create response time mapping of the department’s existing stations. This data is then compared to required response times from NFPA 1720 and well as Department policy and historical response. A gap analysis is generated that defines areas where response times can be improved so that new station(s) locations can be recommended. Finally, response time maps are created that project the department’s response times from the newly recommended locations. Additional mapping and consideration is given to land use, soils, population densities and other pertinent data. Applicable mapping is included in this section. All mapping is included in the appendix. Figure 10: Existing Stations Response Time Mapping 2 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies GIS mapping was created for the existing station location (figure 10) representing the projected emergency response time superimposed on the department’s response area showing two-minute incremental response zones. The Elk River Fire Department is not capable of responding to all areas of the City of Elk River within a recommended eight-minute response time* from its existing stations. Eight-minute response zones are used for this analysis as an approximation of NFPA 1720 guidelines which specifies required response from paid-on-call departments. When added to a six minute or less response to the station, which Elk River Fire Department generally meets, the total response should be less than the 14 minutes required for rural population centers. It should be noted that this analysis is not intended to prove that the department meets NFPA1720, but to recommend optimal response characteristics to the City. It is important to remember that the map in figure 10 is showing response time from the station to the scene and does not include response time to the station. Elk R iver is faced with some unique challenges due to barriers that are created by Highways 10 and 169, the BNSF Railroad and the Mississippi River. At certain times of the day, the response time for staff to get to the station can be much longer than average. The following map shows the relationship of staff residences to the stations relative to those barriers. Figure 21: Major Barriers for Mobility 3 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies It is the team’s recommendation that a four station model will better serve the City and the areas of the adjoining communities that are the Elk River Fire Department’s responsibility. This model would have the following characteristics: 1. The existing headquarters station at the Public Safety Building would remain. 2. A new station would be built in Otsego (on property currently owned by the City of Otsego and designated for a future fire station) to serve the southern reaches of the service area that are currently challenged by the Mississippi River. It is assumed that this would be constructed by the City of Otsego, but staffed by Elk River Fire Department personnel. 3. A new station would be constructed east of Highway 169. 4. Station No. 1 would be reconstructed further north. This eliminates current overlap with Station No. 2 and would serve a growing population in the northern part of the City. Figure 23: Alternate Final Build Out Response Zones 4 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Phased Implementation The four station model is not immediately necessary. Station No. 1 currently serves an important function in that it is located close to existing firefighter residences. Also, current population densities in the northern parts of the City do not yet justify that station. Future city planning efforts should however include acquiring land as shown in figure 23. The following map shows response times with an interim four station model that includes current Station No. 1 to be still in service. Again, a station in Otsego is assumed to be constructed by the City of Otsego as it will mostly serve that community. Figure 22: Final Build Out Response Zones 5 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies SECTION 2 – SPACE NEEDS ANALYSIS The space needs portion of the study is informed by the Station Location section and assumes the following: 1. The Elk River Fire Department administration will remain at the Public Safety Building, as will current fire response. 2. A new satellite station will be required on the east side of Highway 169. 3. Station No. 1 is reaching the end of its useful life. Multiple remodeling and expansions have extended it to fit its entire lot and large expenditures now or in the future would be inappropriate. Probable costs for expansion and remodeling work is expressed as square foot costs due to the early stages of this work. These estimates are further represented as a range of potential costs; it should be assumed that the final cost will be somewhere between the low and high range presented. 2.1 - Station No. 2 Space Needs Recommendations Station No. 2 is the newest of the department’s facilities and has been well maintained. Recent renovations by the department have developed reasonable accommodations for the administrative staff, however the remainder of the station is lacking in station personnel space. The team recommends the following additional spaces be added to provide necessary staff support space. SPACE 20 YEAR NEED Decontamination Spaces 1,054 SF Office/Living Spaces 488 SF Staff Support Spaces 1,295 SF Mechanical and Electrical Spaces 142 SF Total New Construction 2,978 SF Renovations of Training Room 800 SF Total 3,779 SF Some items of note regarding the above recommendations: 1. Gear, equipment and personnel decontamination is a growing concern within the fire industry due to growing evidence of increased cancer risks from larger quantities of carcinogens in today’s fires. 2. Space is provided for Officer Offices that can, over time, become combined sleeping quarters should the department need to implement duty crews in coming years. 6 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies 3. Station No. 2 Training Room is too small for current need with growth of the training program. Expanding it will eliminate the station kitchen which should be replaced in any addition. Probable Cost for this work is developed using square foot costs. Low and high ranges are established due to the early nature of the project. The range is established using costs from Engineering New Record a national construction cost source) and Five Bugles Designs historical cost data base. It should be assumed that the final construction cost will fall between the low and high range. Low Range High Range Cost of Construction $579,709 $644,198 Other Costs (FF&E, Technology, Contingencies, Fees and Legal) 261,968 $322,905 Total $841,676 $967,103 Recommended Fire Station No. 2 Additions and Renovations 7 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies 2.2 - Proposed East Station and Otsego Station (Elk River Station No. 3 and Otsego Station) The station location portion of the study recommends a satellite station on the east side of Highway 169 as well as one south of the Mississippi River. These stations could be essentially identical, three bay stations. Probable Cost for these Stations are developed using square foot costs. Low and high ranges are established due to the early nature of the project. The range is established using costs from Engineering New Record (a national construction cost source) and Five Bugles Designs historical cost data base. It should be assumed that the final construction cost will fall between the low and high range. Low Range High Range Cost of Construction $3,735,370 $4,134,503 Other Costs (FF&E, Technology, Contingencies, Fees and Legal) 1,017,680 $1,408,357 Total $4,735,050 $5,542,860 SPACE 20 YEAR NEED Apparatus Bays 5,040 SF Apparatus Support 3,252 SF Training 4,413 SF Administration/Office 1,630 SF Living Quarters 900 SF Mechanical and Electrical Spaces 2,285 SF Total 17,520 SF Potential East Station Site on City Owned Property at 191 St. Ave NW and Cleveland St. NW 8 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies 2.3 Northwest Station (Station No. 1 Replacement) Station No. 1 has reached the end of its useful life. The community is not , however, at a point where replacement of this station is warranted. The report recommends that only minor upkeep and maintenance be performed on this facility with a goal of replacing it in the next 10 years. The following are recommended space needs for this facility as a fire station and training facility for the Elk River Fire Department only. See Section No. 4 of the report of discussions of a potential Elk River Regional Training Center. A few items of note regarding these spaces: 1. As noted, the department has few opportunities for training in other facilities. This facility therefore has a larger training element. 2. Training spaces indicated in this facility are those spaces required specifically by the fire department. Section No. 4 of the report details other training opportunities and needs from other City of Elk River Departments. Probable Cost for these Stations are developed using square foot costs. Low and high ranges are established due to the early nature of the project. The range is established using costs from Engineering New Record (a national construction cost source) and Five Bugles Designs historical cost data base. It should be assumed that the final construction cost will fall between the low and high range. Low Range High Range Cost of Construction $5,808,379 $6,426,788 Other Costs (FF&E, Technology, Contingencies, Fees and Legal) 1,439,430 $2,029,450 Total $7,247,809 $8,456,238 Note: This station is not recommended for a number of years. Costs should be adjusted to account for inflation to the midpoint of expected construction once that date had been determined. SPACE 20 YEAR NEED Apparatus Bays 7,655 SF Apparatus Support 4,452 SF Training 5,045 SF Administration/Office 3,810 SF Living Quarters 1,295 SF Tempered Storage Spaces 1,700 SF Mechanical and Electrical Spaces 3,593 SF Total 27,550 SF 9 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies SECTION 3 – LAW ENFORCEMENT CENTER The Elk River Police Department has been operating out of the Public Safety Building since its construction in 2003. At that time, approximately 4000 SF was constructed as shell space for future build out. While the facility is in fairly good shape, there are some operational and some space needs challenges that have been identified: 1. While it is not the scope of this project to identify normal maintenance issues, it should be noted that many systems in the building are approximately 15 years old with a 20-25 year expected life. Maintenance funds should be increased over the coming years to account for failing mechanicals. Any major construction efforts should include replacement of heat pumps and major mechanicals in those locations. 2. There was only enough garage space built for 11 squad cars. Current requirement is for 26 vehicles. 3. There have been a number of changes to personnel and staffing structures. The following plans show suggested plan changes to the facility to resolve these issues. The work is divided into 4 categories: No Work: No construction work required. Minor Work: Mostly fit and finish type work as required to accomplish work shown and to provide new finishes. Major Work: Movement or construction of walls and subsequent changes to mechanical and electrical systems. Additions: Construction of additional space. Proposed Additions and Renovations at Police Department 10 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Probable Cost for expansions and renovations at the Police Department are developed using square foot costs. Low and high ranges are established due to the early nature of the project. The range is established using costs from Engineering New Record (a national construction cost source) and Five Bugles Designs historical cost data base. It should be assumed that the final construction cost will fall between the low and high range. Low Range High Range Cost of Construction $2,334,675 $2,690435 Other Costs (FF&E, Technology, Contingencies, Fees and Legal) 685,259 $896,941 Total $3,019,934 $3,587,376 11 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies SECTION 4 – REGIONAL TRAINING CENTER There are a number of training centers with fire service specific venues in the State of Minnesota; unfortunately, most of them are not in the northwest metro area. Elk River’s training program is growing and has become a revenue source for the department. The department’s existing facilities have some classroom type training facilities, but are lacking in the type of physical training props that are critical to developing a safe and efficient fire staff such as stair towers, stand pipes, confined space training, rappelling, smoke and maze training. Other large scale training actives that would be important to Elk River Fire Department would include water rescue, rail car, and vehicle extractions. Other Departments within the City also have training concerns. The following is a brief list of the types of training the City should be considering: Fire Department: Live Burn Tower Training Tower (rappelling) Rubble Pile Rail Car Police Department: Traffic Stop Training Accident Scene Investigation SWAT Training with buildings, buses, trains and vehicles Elk River Municipal Utilities: Construction and demolition of electrical substations Cross training with Fire Department on power and gas shut-offs. Public Works Department: Small equipment training; backhoes, skid steers Street Department Utilities installation training. There is also a need for classroom style training to compliment the physical training elements listed above. It should be noted that the construction of this training facility does not negate the need for a fire station in this same general location. The required fire station is covered under Section No. 2 of the report. There is likely some overlap of spaces that should be explored at the time of construction for either or both facilities. 12 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Two critical elements are to be considered with any training center of this sort; buildings and training props. The facility will require flexible meeting and training spaces, personnel support and break areas , and administrative space. The following program allows for meeting space for 100 to 150 people in a variety of different sized spaces. It also provides for locker and shower spaces for trainees and appropriate break areas to provide catered meals for day long training events. The detailed space program is available in the appendix. Adequate site is required to not only allow for the training activity, but to do so safely and in isolation from other training props and activities. Similarly, there is an opportunity to share spaces such as a train car used to stage fire response as well as SWAT tactics training. These issues will need to be explored in detail at time of implementation of this plan. The areas estimated below are given in a range since implementation of this element of the study is anticipated to be a number of years in the future. A more detailed planning effort that examines a specific mix of activities tailored to available funding should be done prior to purchasing property. SPACE 20 YEAR NEED Training Support 1,944 SF Training 8,339 SF Training Office 3,553 SF Tempered Spaces 3,810 SF Mechanical and Electrical Spaces 842 SF Total 17,677 SF SPACE AREA Fire Department 4-6 Acres Police Department 2-4 Acres Elk River Municipal 3-4 Acres Public Works and Streets Departments 3-4 Acres Parking, Roads and Circulation 50% Total 18-27 Acres 13 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Estimates of probable construction costs for the training center, exclusive and site costs will include the following: SPACE AREA Training Center - Building 5,000,000 Fire Department North Station $8,500,000 Burn Tower (Custom, Cast Concrete) $3,000,000 Rubble Pile $250,000 Train Car and Bus $500,000 SWAT/Rescue Village $2,500,000 Public Works and Streets Departments $50,000 Municipal Utilities (Transformer Station Training) $1,250,000 Total $21,050,000 14 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Training Center Concept Diagram BURN TOWER RUBBLE PILE/CONFINED SPACE TRAINING CENTER FIRE STATION VEHICLE RESCUE/ EXTRACTION CITY STREET (TACTICAL TRAINING) POWER SUB-STATION TRAINING STREETS/PUBLIC WORKS EQUIPMENT TRAINING 15 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies SECTION NO. 5 - CONCLUSIONS AND RECOMMENDATIONS The following recommendations and conclusions are offered in the order of importance that they should be considered in future planning. Conclusion No. 1: Response time mapping of current station locations indicates some gaps in coverage. These gaps in coverage are exacerbated by barriers such as limited access highways, the Mississippi River, and general traffic congestion at peak travel times. Recommendation: Construct a new, 17,500 SF, 3 bay, satellite fire station on the east side of Highway 169. Total project cost will range from $4.7M to $5.5M. Conclusion No. 2: Some of the gaps in coverage are occurring in portions of the City of Otsego served by the Elk River Fire Department. Mapping shows that solving this issue with a new station in Otsego will also reduce response times to the southern portions of Elk River, especially during heavy traffic times. Recommendation: Work with the City of Otsego to construct a new, 17,500 SF, 3 bay, satellite fire station similar to the new East Station for City of Elk River. Total project cost will range from $4.7M to 5.5M. The study assumes the station would be financed by the City of Otsego and operated by Elk River Fire Department. Conclusion No. 3: Station No. 2, Elk River Fire Department’s Headquarters station in the Public Safety Building provides a good base of operations for the department’s full time staff. However, it is lacking in station personnel (paid-on-call staff who report to this station) support spaces such as locker rooms, showers, offices and dayroom facilities. Construction of a new East Fire Station will also create an equity issue between the stations. Recommendation: Construct an addition to Station No. 2 of approximately 3,800 SF to include support spaces for station staff. Project Cost will range from $850K to $1M. Conclusion No. 4: The Elk River Fire Department’s Firefighter Training Program has become a regional asset and revenue generator. A small increase in the size of the existing training room will allow this activity to continue and to grow. Recommendation: Expand the training room at Station No. 2 to incorporate the kitchen as part of the expansion project outlined in Conclusion No. 3. Costs for this work are included with Recommendation No. 3. Conclusion No. 5 (Police Department): In 2003, the Elk River Police Department planned in expansion space in the form of 4,000 SF of shell space on a second floor. They have experienced enough growth in the intermediate years to warrant building out that space, as well as to construct minor changes throughout the facility to improve workflow. 16 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Conclusion No. 6 (Police Department): The existing Police Department squad garage was only constructed to hold 11 vehicles; the department now has over 20. Moreover, the amount of expensive electronics and fit out that is added to a squad car upon purchase is often as much as the squad car itself. Recommendation: When the considering addition to the fire department portions of the building, consider adding a squad car expansion and completing other interior renovations and buildouts recommended in this report. Project Cost will range from $3M to $3.6M. Conclusion No. 7: Station No. 1 has reached the end of its useful life. It is however well located for response by firefighters and there are not yet enough calls for service in the northwest quadrant of the city to justify a new station. This will likely change as the community continues developing to the north. Begin planning for a Northwest Station to replace Station No. 1. Recommendation: Acquire property as it becomes available. Plan for additional space in that acquisition for a Regional Training Center. Begin seeking regional, state, and federal partners for this effort. Study revenue generating options to determine cost shares so that participants can begin planning. 17 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies APPENDIX A STATION LOCATION MAPPING 18 70TH ST NE 95TH STNECSAH 15 NWELK LAKE RD NW RANCH RDNW 85TH ST NE RI V E R R D NE TWIN LAKES RDNWODEANAVE NECSAH 30 NW MEADOWVALE RDNWJARVIS ST NW192ND AVE NW STATEHIGHWAY101NEBROOK RD N W US HIGHWAY 169 NW221ST AVENW 209THAVENW181STAVE NWRAMP PARRISH AVE NENASHUA AVE NEZEBULON ST NWCOUNTYROAD 79 NWMAIN ST N W MISSISSIPPI RD NW83RDSTNE 165TH AVE NWTYLER ST NWCOUNTY ROAD 35NWCSAH14NWMASON AVENE65THSTNECLEVELANDST NWLANDER ST NWQUEENS AVE NE175TH AVE NWJACKSON AVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NWQUADAY AVE NE185THAVE NW60TH ST NEPROCTOR RD NWPOLK ST NWLOWELL ST NWVERNON STNW91STSTNE75THSTNE213THAVENW190THAV E N W SMITH STNWLABEAUX AVENEOBRIAN AVE NEFRONT A GERD 196TH LN NW ISLAND VIEWDR80THSTNE146TH ST NW96TH ST NE207TH AVEN W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152ND STNW225TH AVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NEUS H I G H W A Y 1 0 N WBALDWINSTNW182NDAVENWPARELLAVENE205THAVENW171STLNNWSMITHDRNW159THSTNW227THAVENWLINE AVENW217THAVENWNEEDHAMAVENEFRESNO ST NW191ST AVE NW UPLAND ST NWL INCOLNS T NW 214T H LNNW223RDAVENW92NDSTNE160TH ST NW89TH ST NE GATES AVE NWTYLER DR NWOCHOA CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NW RANCHRD NW 85TH ST NE RI V E R R DNETWINLAKESRDNWODEANAVENECSAH30NW JARVIS ST NWMEA D O W VAL E R D N W 192ND AVE NW CSAH 14 NWSTATEHIGHWAY101 NEBROOK RD NW221ST AVE NW 209TH AVE NWRAMP181ST AVENWPARRISHAVENENASHUA AVE NEZEBULON ST NWCOUNTY ROAD79 NW MAINST N W 83RD ST NE MISSISSIPPI RD NW 165THAVENWTYLER ST NWCOUNTY ROAD 35 N W 193RD AVE NW 65TH ST NEMASON AVE NECLEVELAND ST NWLANDER ST NWQUEENSAVENE175THAVENW145THST NW77TH ST NE147TH ST NWDODGE ST NWYORK ST NWQUADAY AVE NEQUAM AVE NE60TH ST NE 185TH AVE NW FILLMORE ST NW167TH ST NWPOLK STNW198THAVEPROCTORRDNW170THST NW91ST ST NE VERNON ST NWCOUNTY ROAD 83NW 75TH ST N E 213TH AVE NW 190THAVE NWSMITHST NWLABEAUX AVE NE196TH LN NW FRONT A G E R D 228TH AVE NW 80TH ST NE ISLAND VIEW D R 96TH ST NE207TH AVE N W NABER AVE NE201ST AVE NW VANCE ST NW152ND ST NW 215TH AVE NW 225TH AVE NW 194T H A V E NWZANE ST NW88TH ST NE 211TH AVE NW UNKNOWN198TH AVE NW169TH ST NWRAWLINGS AVE NEBALDWIN STNW182NDAVENW151STSTNWPARELLAVE NE205TH AVE NW 171STLN NWSMITH DR NW159TH STNW227THAVE NW LINE AVE NW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVENW 92ND ST NE 223RD AVE NW 195TH LN NW 148TH ST NW1 5 5 TH S T NW 183RD AVE NW 8TH 70TH STNECSAH15NW95THST NE ELK LAKE RD NW RANCH RDNW 85TH ST NE RI V E R R D NE TWIN LAKES RDNWODEANAVE NECSAH 30 NW MEADOWVALE RDNWJARVIS ST NW192ND AVE NW STATEHIGHWAY101NEBROOK RD N W 221ST AVE NW 209TH AVENW 181ST AVE NWRAMP PARRISHAVENENASHUA AVENEZEBULON ST NWCOUNTY ROAD 79 NW MAIN ST NW MISSISSIPPI RDNW 83RD ST NE 165TH AVE NWTYLER ST NWCSAH 14 NWCOUNTY ROAD 35 N W 193RD AVE NW MASONAVENE65THSTNECLEVELANDST NWLANDERSTNWQUEENSAVENE175THAVE NWJACKSON AVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NW231ST AVE NW QUADAY AVENE185TH AVE NW 60THST NEIRVING ST NWPROCTOR RD NWPOLK ST NWLOWELL ST NWVERNON STNW91STSTNE75THSTNE213THAVENW190THAV E N W SMITH STNWLABEAUX AVENEOBRIAN AVE NEFRONT A GERD 196TH LN NW ISLAND VIEWDR80THSTNE146TH ST NW96TH ST NE207TH AVEN W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152ND STNW225TH AVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGSAVE NEUS H I G H W A Y 10NWBALDWINSTNW182NDAVENWPARELLAVE NE205TH AVENWGARYSTNW171STLNNWSMITHDRNW159TH ST NW227TH AVE NW LINE AVENW217THAVENWNEEDHAMAVENEFRESNO ST NW191ST AVE NW UPLAND ST NWAUBURN STNWLINCO LN S T NW 214T H LNNW223RDAVENW92NDSTNE160TH ST NW89TH ST NE GATES AVE NWOCHOA AVE NE1 5 5 TH S T NW CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NWRANCH RDNW 85TH ST NE RI V E R R D N E TWIN LAKES RD NWODEANAVENECSAH 30 NW JARVIS ST NWMEADOWVALE RD NW192ND AVE NW STATE HIGHWAY101NEBROOKRD N W US HIGHWAY 169 NW221ST AVE NW 209TH AVE NW RAMP181ST AVE NW PARRISH AVENEPAGE AVE NENASHUA AVE NEZEBULON STNWCOUNTY ROAD 79NW MAIN ST N W MISSISSIPPI RD NW83RDST NE 165TH AVE NW CSAH 14 NW TYLERSTNWCOUNTYROAD35NW MASONAVENE65THSTNECLEVELAND ST NWLANDER ST NWQUEENS AVE NE175TH AVE NWJACKSON AVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NW231ST AVE NW QUADAY AVENEQUAM AVE NE60TH ST NE POLK ST NWPROCTOR RDNWLOWELLSTNWVERNON ST NW91STST NE75TH STNE213THAVE NW 190TH A VE NWSMITH ST NWLABEAUX AVE NEOBRIANAVENEFRONT A G E R D196THLNNW228THAVE NW ISLAND VIEW D R 80TH ST NE146TH ST NW96TH ST NE207TH AVE NW NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152NDSTNW225TH AVENW ZANE ST NW202ND AVENWUNKNOWNRAWLINGS AVE NEUS H I G H W A Y 1 0 N WBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NWCONCORD ST NW171ST LN NWSMITH DR NW227TH AVE NWLINEAVENW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVENWUPLANDST NWLINCOLNSTNW214T H L N NW 92ND ST NE 223RDAVENW 148TH ST NW89TH ST NEGATESAVENW210THAVENW72NDSTNEOCHOAAVE NE1 5 5 TH S T NW 183RD AVE NW 21 4 T H A V E N W 197TH AVE NW 8TH ST NW XAVIER ST NW221ST AVE NW Source: City of Elk River & CountyDataUser: 1918Date Saved: 4/18/2017 2:41:21 PMProj. Number: 2017-0700.00 1in = 6, 500 fto02,8005,6001,400FeetZONINGMAPFIRE STATION LOCATION STUDYCITY Path: O:\GIS_Client_Data\Five Bugles\Elk River\Figure 6 - Land_Use_Map.mxdSource: City of Elk RiverUser: 1918DateSaved: 4/18/2017 2:47:16 PMProj. Number: 2017-0700.001in = 6,500 fto Source: City of Otsego & CountyZoningUser: 1918Path: O:\GIS_Client_Data\ Five Bugles\ Elk Source: City of Otsego & CountyZoningUser: 1918Path: O:\GIS_Client_Data\ Five Bugles\ Elk Source: USDA NRCS, Esri Source: USDAUser: 1918Path: O:\GIS_Client_Data\ Five Bugles\Elk River\Figure 8 - Soil_Survey_Map.mxdDateSaved: 4/18/20172:52:25PMProj. Number: 2017-0700.00 1 in = 6, 500 fto 0 2, 800 5, 6001,400 Feet SOIL SURVEY MAPFIRE STATION LOCATION CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NW RANCHRD NW 85TH ST NE RI V E R R DN E TWIN LAKES RD NWO DEAN AVENECSAH30NW MEADOWVALE RD NW192ND AVE NWJARVIS ST NWCSAH 14 NW STATEHIGHWAY101 NEBROOK RD N W 221ST AVE NW 209THAVE NW181STAVENWRAMPPARRISH AVE NENASHUA AVE NEZEBULON STNWCOUNTY ROAD 79 NW MAIN ST NW MISSISSIPPI RD NW 83RD ST NE 165THAVE NWUS HIGHWAY 169 NWTYLER STNWCOUNTYROAD 35 N W MASON AVE NE65TH STNECLEVELANDSTNWLANDERSTNWQUEENSAVENE175THAVE NWJACKSONAVENW145THSTNW77THST NE DODGE ST NW229TH AVE NW 198TH AVE QUADAY AVE NE185TH AVE NW 60TH ST NE167TH ST NWPROCTOR RD NWPOLK ST NWCOUNTYROAD 83 NW LOWELL STNW147THSTNWVERNONSTNW91STST NE 75TH ST NE 213TH AVE NW 190T H A V E N W170TH ST NWSMITH STNWLABEAUX AVENE197THAVE NW O BRIAN AVENEFRONTAG E R D 196TH LNNW228THAVENWISLAND VIEW D R 80TH ST NE146TH ST NW96TH ST NE207TH AVE N W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152ND ST NW225TH AVE NW 194T H A V E N W 202ND AVE NW ZANE ST NW211TH AVE NW 88TH ST NE UNKNOWNRAWLINGS AVE NE169TH ST NWBALDWIN ST NW182ND AVENWPARELLAVENE205THAVENW171STLNNWSMITHDRNW159THSTNW227THAVENWLINEAVE NW217TH AVE NWNEEDHAMAVENEFRESNOSTNW191STAVE N W UPLAND STNWL INCO LN S TNW214T H L NNW223RDAVENW92NDSTNE89TH ST NE GATES AVE NWTYLER DR NWOCHOA AVE NE1 5 5 TH S T NW 183RD AVE NW 8TH ST NW XAVIER ST NWSTATE HIGHWAY 101 NE83RD ST NE RAMP225TH AVE NW FRESNO ST NW227TH AVE NW 205TH AVE NW 221ST AVE NW PROCTOR RD NW209TH AVE NW 223RD AVE NW JARVIS ST CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NW RANCHRD NW US HIGHWAY 169 NW85TH ST NE RI V ER R D N E TWIN LAKESRDNWODEAN AVE NECSAH 30 NW MEADOWVALERD NW192ND AVE NW CSAH 14NWSTATEHIGHWAY 101 NEBROOK RD N W JARVIS ST NW221STAVE NW209THAVENW181ST AVE NWRAMP PARRISH AVE NENASHUA AVE NEZEBULON STNWCOUNTY ROAD 79 NW MAIN ST N W MISSISSIPPI RDNW 83RD ST NE 165TH AVE NWTYLER ST NWCOUNTY ROAD 35 N W 193RDAVE NW MASON AVE NE65TH STNE CLEVELAND ST NWLANDER ST NWQUEENS AVE NE175TH AVENWJACKSONAVENW145THSTNW77THST NEDODGE ST NW198THAVEQUADAYAVENEUS H I G H W A Y 1 0 N W 185TH AVE NW 60TH ST NE167TH ST NWPROCTORRD NWPOLK ST NWCOUNTY ROAD 83 NW LOWELL ST NWVERNON ST NW91ST ST NE 75TH ST NE 213TH AVE NW 190TH AVE N W SMITH STNWLABEAUXAVENE147TH ST NWO BRIAN AVE NE197THAVENWFRONTAG E R D 196TH LN NW ISLAND VIEW D R 80TH ST NE146TH ST NW170TH ST NW96TH ST NE207TH AVE NW NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152ND ST NW 225TH AVE NW 202ND AVE NW ZANE ST NW211TH AVE NW 88TH ST NE UNKNOWNRAWLINGS AVENE169THSTNW182NDAVENWPARELLAVENE205THAVENW171STLNNWSMITHDRNW159THSTNW227THAVENW LINEAVENW217THAVENWNEEDHAMAVE NEFRESNO ST NW191ST AVEN W UPLAND ST NWLINCOLN S T NW 214T H LNNW223RDAVENW92NDSTNE 89TH ST NE GATES AVE NWTYLER DR NWOCHOA AVE NE1 5 5 TH S T NW 183RD AVE NW 8TH ST NW 225TH AVE NW 83RD ST NE 70TH ST NE 95TH STNECSAH 15 NWELK LAKE RD NW RANCH RDNW 85TH ST NE RI V E R R D NE TWIN LAKES RDNWODEANAVE NECSAH 30 NW MEADOWVALE RDNWJARVIS ST NW192ND AVE NW STATEHIGHWAY101NEBROOK RD N W US HIGHWAY 169 NW221ST AVENW 209THAVENW181STAVE NWRAMP PARRISH AVE NENASHUA AVE NEZEBULON ST NWCOUNTYROAD 79 NWMAIN ST N W MISSISSIPPI RD NW83RDSTNE 165TH AVE NWTYLER ST NWCOUNTY ROAD 35NWCSAH14NWMASON AVENE65THSTNECLEVELANDST NWLANDER ST NWQUEENS AVE NE175TH AVE NWJACKSON AVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NWQUADAY AVE NE185THAVE NW60TH ST NEPROCTOR RD NWPOLK ST NWLOWELL ST NWVERNON STNW91STSTNE75THSTNE213THAVENW190THAV E N W SMITH STNWLABEAUX AVENEOBRIAN AVE NEFRONT A GERD 196TH LN NW ISLAND VIEWDR80THSTNE146TH ST NW96TH ST NE207TH AVEN W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152ND STNW225TH AVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NEUS H I G H W A Y 1 0 N WBALDWINSTNW182NDAVENWPARELLAVENE205THAVENW171STLNNWSMITHDRNW159THSTNW227THAVENWLINE AVENW217THAVENWNEEDHAMAVENEFRESNO ST NW191ST AVE NW UPLAND ST NWL INCOLNS T NW 214T H L N NW223RDAVENW92NDSTNE160THSTNW89TH ST NE GATES AVE NWTYLER DR NWOCHOA AVE NE1 5 5 TH S T NW 183RD CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NW RANCHRD NW 85TH ST NE RI V E R R DN E TWIN LAKES RD NWO DEANAVENECSAH30 NW MEADOWVALE RD NWJARVIS STNW192ND AVE NW STATE HIGHWAY 101NECSAH14NW BROOK RD N W 221ST AVE NW 209THAVE NW181STAVENWRAMPPARRISH AVE NENASHUA AVE NEZEBULON ST NWCOUNTY ROAD 79 NW MAIN ST NWMISSISSIPPI RD NW 83RD ST NE165TH AVE NWTYLER ST NWCOUNTY ROAD 35NW 193RDAVE NW MASON AVE NE65TH ST NE CLEVELAND ST NWLANDER STNWQUEENSAVENE175THAVE NW U S H I G H W A Y 10NWJACKSONAVENW145TH STNW77THSTNE147T H S T N W DODGE ST NW231ST AVE NW QUADAY AVE NE185TH AVENW60TH ST NE167TH ST NWIRVING STNWPROCTORRD NWPOLK STNWLOWELL ST NW170TH ST NWVERNON ST NW91ST ST NE COUNTY ROAD 83 NW 75TH ST NE 213TH AVE NW 190T HA VEN W SMITH ST NWLABEAUXAVENEOBRIAN AVE NEFRONT A G ERD196THLNNW 228TH AVE NW ISLAND VIEW D R 80TH ST NE146TH ST NW 197TH AVE NW 96TH ST NE166TH ST NW207TH AVENW NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152ND ST NW 225TH AVE NW 202ND AVE NW ZANE ST NW211TH AVE NW 88TH ST NE UNKNOWNRAWLINGS AVE NE169TH STNWBALDWINSTNW182NDAVENWPARELLAVENE205THAVENWGARY ST NW171ST LN NWSMITH DR NW227TH AVE NW LINEAVENW217THAVENWNEEDHAMAVE NEFRESNO ST NW191ST AVEN W UPLAND ST NWAUBURNSTNWL INCO LN S T NW 214T H LNNW223RDAVENW92NDSTNE 89TH ST NE GATES AVE NWOCHOA AVE NE1 5 5 TH S T NW 183RD AVE NW 8TH ST NW 225TH AVE NW 147TH ST NW209TH AVE NW STATE HIGHWAY 101 NE83RD CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NW RANCHRD NW 85TH ST NE RI V E R R D N E TWINLAKES RD NWO DEAN AVENECSAH30NW CSAH 14 NW MEADOWVALE RDNWJARVIS ST NW192ND AVE NW STATEHIGHWAY101 NEBROOK RD N W 221ST AVE NW 209THAVE NW 181ST AVE NWRAMPPARRISHAVENENASHUAAVE NEZEBULON ST NW172ND ST NWCOUNTY ROAD 79 NW MAIN ST NW MISSISSIPPI RD NW 83RD STNE 165TH AVE NWTYLER ST NW211TH AVE NW COUNTY ROAD 35NW 193RD AVE NW MASON AVENE65TH ST NE CLEVELAND ST NWLANDER ST NWQUEENSAVENE175THAVENW 198THAVE229TH AVE NW JACKSON AVE NW145TH ST NW77THSTNE147THSTNWDODGESTNW231ST AVENWCOUNTYROAD83NW QUADAY AVE NEU S H I G H W A Y 1 0 N W 185TH AVE NW 60TH ST NE167TH STNWIRVING ST NWPROCTOR RD NWPOLK ST NWLOWELL ST NW170TH ST NWVERNON ST NW91ST ST NE 197TH AVE NW75TH STNE213TH AVE NW 190T HAVE N W SMITH ST NWLABEAUXAVENEOBRIANAVENEFRONT A G E R D 196TH LN NW 228TH AVE NW ISLAND VIEW D R 80TH ST NE146TH ST NW96TH ST NE207TH AVE N W NABER AVE NE201ST AVE NW VANCESTNW215TH AVE NW152ND ST NW 225TH AVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NE169TH ST NWBALDWIN ST NW182ND AVE NWPARELLAVENE205THAVENWGARYSTNW171STLNNWSMITHDRNW159THSTNW227THAVE NWLINEAVENW217THAVENWNEEDHAM AVE NEFRESNO ST NW191STAVE N W UPLAND STNWAUBURNST NWL INCO LN S TNW214THLNNW223RDAVE NW 92ND ST NE 89TH ST NE GATES AVE NWOCHOA AVE NE1 5 5 TH S T NW 183RD AVE NW 8TH ST NW 223RD AVE NW 83RD ST NE JARVIS CSAH15 NW70 TH S T NE 95T H S T NE ELK LAKE RDNWRA NCH RDNW 85 T H S T NE RIV E R R D N E TWIN LAKES RD NWO DEAN AVE NECS AH 30 N W CS AH14NWMEADOWVALE RD NWJARVIS ST NW192ND AVE NW STATEHIGHWAY 101NEBRO OK RD NW221ST AV E N W 20 9 TH AV ENW18 1 S T AV E N WRAMP PARRISH AVE NENASHUA AVE NEZEBULON ST NW172ND ST NWCO UNTY RO A D 7 9 NW MAIN ST NWMIS S IS S IP P I RD NW 83R D S T NE 165TH AV E NWTYLER ST NW21 1T H AV E N W COUNTY ROAD 35 NW 1 9 3 R D A VE N W MASON AVE NE65 T H S T NE CLEVELAND ST NWLANDER ST NWQUEENS AVE NE17 5 TH AV E NW 198TH AVE 22 9 TH AV E NW JACKSON AVE NW145TH STNW77THS T NE147TH ST NWDODGESTNW231STAVENW CO UNT Y ROAD 83 NW QUADAY AVE NEU S HIG H W A Y 10 N W 185TH AV E NW 60 T H S T NE167TH ST NWIRVING ST NWPROCTORRD NWPOLK ST NWLOWELL ST NW170TH ST NWVERNON ST NW91ST ST NE 197TH AVE NW 7 5 T H S TN E 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NEO BRIAN AVE NEFRONTAGE RD 19 6 T HL N N W 228TH AVE NW IS L A NDV IE W D R 80TH S T N E146TH ST NW96TH ST NE2 0 7 T H A V E N W NABER AVE NE20 1 S T AV E N W VANCE ST NW215TH AVE NW152N D ST NW225TH AV E NW 202ND AVE NW ZANE ST NW88T H ST NE UNKNOWNRAWLINGS AVE NE169TH ST NWBALDWIN ST NW182ND AV E NW PARELL AVE NE205TH AVE NW GARY ST NW171ST LN NWSMITH DR NW159TH ST NW227TH AVE NW LINE AVE NW21 7 TH AV E NW NEEDHAM AVE NEFRESNO ST NW191ST AVENW UPLAND ST NWAUBURN ST NWL I NCOL N ST NW214TH LN NW 22 3 R D AV E N W 92NDSTNE89THSTNEGATESAVENWOCHOAAVENE155THSTNW183RDAVENW8THSTNW223RDAVENW83RD S T NEJARVISSTNWPROCTORRDNW205THAVE NW UNKNOWN225TH AVE NW RAMP22 1S T AV E NW209TH AVE NW 22 7 TH AV ENWSTATEHIGHWAY101NE183RDAVE NW So ur ces: Esr i, HER E, DeLorme , USG S , In term ap , INC RE ME NT P, N RCa n, Esr i Jap an , ME TI, E sriChina ( Ho ng K o ng ), Esr i Ko re a, E sri (Th ai lan d ), M ap myIn dia , N GC C, © Op en S tr ee tMa pcontributors, a nd the G IS U ser C ommunitySource : ESR CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NWRANCH RD NW 85TH ST NE RIV E R R D NE TWIN LAKES RD NWO DEAN AVE NECSAH30 NWMEADOWVALERD NWJARVIS ST NW192ND AVE NWSTATE HIGHWAY 101 NECSAH 1 4NW BRO O K RD NW221ST AVE NW 209THAVE NW181STAVENWRAMP PARRISH AVE NENASHUA AVE NEZEBULON STNWCOUNTY ROAD 79 NW MAIN ST NW MISSISSIPPI RDNW 83RD ST NE 165TH AVE NWTYLER ST NWCOUNTY ROAD 35 NW 1 9 3 R D A V E N W MASON AVE NE65TH ST NE CLEVELANDSTNWLANDERSTNWQUEENS AVE NE17 5 TH AV E NW U S HIG H W A Y 10 NWJACKSON AVENW145TH ST NW77TH ST NE 147TH ST NW DODGE ST NW231ST AVE NW QUADAY AVE NE185TH AVE NW 60TH ST NE167TH ST NWIRVING ST NWPROCTOR RD NWPOLKSTNWLOWELL ST NW170TH ST NWVERNON ST NW91ST ST NE COUNTY ROAD 83NW 7 5 TH S T N E 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NEO BRIAN AVE NEFRONTAGE RD 19 6TH L N N W228THAVE NW IS L A NDV IEW D R80TH STNE146TH ST NW197TH AVE NW 96TH ST NE166TH ST NW2 0 7 T H A V EN WNABER AVE NE201ST AVE NW VANCE STNW215TH AVE NW152N D ST NW225TH AVE NW 202ND AVE NW ZANE ST NW211TH AVE NW 88TH ST NE UNKNOWNRAWLINGS AVE NE169TH ST NWBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NW GARY ST NW171ST LNNWSMITHDRNW227THAVENWLINEAVENW217THAVENWNEEDHAM AVE NEFRESNO ST NW191ST AVE NW UPLAND ST NWAUBURN STNWLINCOLNSTNW214THLNNW 2 2 3 RD AV E NW 92NDSTNE 89TH ST NE GATES AVENWOCHOAAVENE155THSTNW18 3 R D AV E N W 8TH ST NW 225TH AVE NW 147TH ST NW209TH AVE NW STATE HIGHWAY 101 NE8 3 CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NWRANCH RD NW US HIGHWAY 169 NW85TH ST NE RIV E RR D N E TWINLAKES RD NWO DEANAVENECSAH30 NW MEADOWVALE RD NW192ND AVENW CSAH 14 N W STATEHIGHWAY101 NEBRO O K RD NW JARVIS ST NW221STAVE NW209THAVENW 181ST AVE NWRAMP PARRISH AVE NENASHUAAVE NEZEBULON ST NWCOUNTY ROAD 79 NW MAINSTNW MISSISSIPPIRDNW 83RD ST NE 165TH AVE NWTYLER ST NWCOUNTY ROAD 35 NW 1 9 3 R D A V E NW MASON AVE NE65TH ST NECLEVELAND ST NWLANDERSTNWQUEENSAVENE175THAV E NWJACKSON AVE NW145THSTNW77TH STNEDODGE STNW198TH AVE QUADAY AVE NEU S HIG H W A Y 10 N W 185TH AVE NW 60TH ST NE167TH ST NWPROCTOR RD NWPOLK ST NWCOUNTY ROAD 83 NW LOWELL ST NWVERNON ST NW91ST ST NE 7 5T H S T N E 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NE147TH ST NWO BRIAN AVENE197TH AVENWFRONTAGE RD 1 9 6TH L N N W ISLA N D V IE W D R 80TH ST NE146TH ST NW170TH ST NW96TH ST NE2 0 7 T H A V E N W NABER AVE NE201ST AVE NW VANCE STNW215TH AVE NW152N D ST NW225TH AVE NW 202ND AVE NW ZANE ST NW211TH AVE NW 88TH ST NE UNKNOWNRAWLINGS AVE NE169TH ST NW182ND AVE NW PARELL AVE NE205TH AVE NW 171ST LN NWSMITH DR NW159TH ST NW227TH AVE NW LINEAVENW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVENWUPLANDSTNWLINCOLNSTNW214TH LN NW223RDAVENW 92ND ST NE 89THST NE GATES AVE NWTYLERDRNWOCHOA AVE NE1 5 5 THSTNW183RDAVEN W 8TH ST NW 225TH AVE NW 8 3 R D S T N E STATE HIGHWAY 101 NE205TH AVE NW 209TH AVE NW FRESNO ST NW2 2 1 CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NWRANCH RD NW US HIGHWAY 169 NW85TH ST NE RIV E RR D N E TWINLAKES RD NWO DEANAVENECSAH30 NW MEADOWVALE RD NW192ND AVENW CSAH 14 N W STATEHIGHWAY101 NEBRO O K RD NW JARVIS ST NW221STAVE NW209THAVENW 181ST AVE NWRAMP PARRISH AVE NENASHUAAVE NEZEBULON ST NWCOUNTY ROAD 79 NW MAINSTNW MISSISSIPPIRDNW 83RD ST NE 165TH AVE NWTYLER ST NWCOUNTY ROAD 35 NW 1 9 3 R D A V E NW MASON AVE NE65TH ST NECLEVELAND ST NWLANDERSTNWQUEENSAVENE175THAV E NWJACKSON AVE NW145THSTNW77TH STNEDODGE STNW198TH AVE QUADAY AVE NEU S HIG H W A Y 10 N W 185TH AVE NW 60TH ST NE167TH ST NWPROCTOR RD NWPOLK ST NWCOUNTY ROAD 83 NW LOWELL ST NWVERNON ST NW91ST ST NE 7 5T H S T N E 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NE147TH ST NWO BRIAN AVENE197TH AVENWFRONTAGE RD 1 9 6TH L N N W ISLA N D V IE W D R 80TH ST NE146TH ST NW170TH ST NW96TH ST NE2 0 7 T H A V E N W NABER AVE NE201ST AVE NW VANCE STNW215TH AVE NW152N D ST NW225TH AVE NW 202ND AVE NW ZANE ST NW211TH AVE NW 88TH ST NE UNKNOWNRAWLINGS AVE NE169TH ST NW182ND AVE NW PARELL AVE NE205TH AVE NW 171ST LN NWSMITH DR NW159TH ST NW227TH AVE NW LINEAVENW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVENWUPLANDSTNWLINCOLNSTNW214TH LN NW223RDAVENW 92ND ST NE 89THST NE GATES AVE NWTYLERDRNWOCHOA AVE NE1 5 5 THSTNW183RDAVEN W 8TH ST NW 225TH AVE NW 8 3 R D S T N E STATE HIGHWAY 101 NE205TH AVE NW 209TH AVE NW FRESNO ST NW2 2 1 Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, EsriJapan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community Source: ESRIUser: 1771Path: O:\GIS_Client_Data\ Five Bugles\Elk River\Figure 18 - Otsego_Response_Zones.mxdDateSaved: 8/3/2017 2:32:04PMProj. Number: 2017-0700.001in = 6, 500 fto 0 2,800 5,6001,400 Feet PROPOSED OTSEGO STATION RESPONSE ZONESFIRE STATION LOCATION STUDYCITY OF ELK RIVERSHERBURNE COUNTY, MINNESOTA FIGURE 18 New 2 Min New 4 Min 70TH ST NE 95TH STNECSAH 15 NWELK LAKE RD NWRANCH RD NW 85TH ST NE RIV E R R D N ETWIN LAKES RD NWO DEANAVENECSAH30 NW MEADOWVALE RD NWJARVIS STNW192ND AVE NW STATE HIGHWAY 101NEBROO K RD NW US HIGHWAY 169 NW221ST AVENW 209THAVENW181ST AVE NWRAMP PARRISH AVE NENASHUA AVE NEZEBULON ST NWCOUNTY ROAD 79 NW MAINST NW MISSISSIPPIRD NW 83RD ST NE 165TH AVENWTYLERSTNWCOUNTY ROAD 35 NW C S A H 1 4 N W MASONAVENE65TH STNE CLEVELAND ST NWLANDER ST NWQUEENS AVE NE175TH AVE NWJACKSON AVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NWQUADAY AVE NE185TH AVE NW 60TH ST NEPROCTOR RD NWPOLK ST NWLOWELL ST NWVERNON ST NW91ST ST NE 75 TH S T N E 213TH AVE NW 190TH AVE NWSMITHSTNWLABEAUXAVE NEO BRIAN AVE NEFRONTAGE RD1 96T H L N NWIS L A N D VIEW D R 80TH ST NE146TH ST NW96TH ST NE2 0 7T H A V E N W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152N D STNW225THAVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NEUS HIGHWAY 10 NWBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NW 171ST LN NWSMITH DR NW159THSTNW227THAVENWLINEAVENW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVE NW UPLAND ST NWL I NCOLNSTNW214THLNNW223 R D AV EN W 92ND ST NE160THSTNW89TH ST NE GATES AVE NWTYLERDRNWOCHOAAVENE155THSTNW1 8 3 R D AV E N W 197TH AVE NW 8TH ST NW XAVIER ST NWSTATE HIGHWAY 101 70TH ST NE 95TH STNECSAH 15 NWELK LAKE RD NWRANCH RD NW 85TH ST NE RIV E R R D N ETWIN LAKES RD NWO DEANAVENECSAH30 NW MEADOWVALE RD NWJARVIS STNW192ND AVE NW STATE HIGHWAY 101NEBROO K RD NW US HIGHWAY 169 NW221ST AVENW 209THAVENW181ST AVE NWRAMP PARRISH AVE NENASHUA AVE NEZEBULON ST NWCOUNTY ROAD 79 NW MAINST NW MISSISSIPPIRD NW 83RD ST NE 165TH AVENWTYLERSTNWCOUNTY ROAD 35 NW C S A H 1 4 N W MASONAVENE65TH STNE CLEVELAND ST NWLANDER ST NWQUEENS AVE NE175TH AVE NWJACKSON AVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NWQUADAY AVE NE185TH AVE NW 60TH ST NEPROCTOR RD NWPOLK ST NWLOWELL ST NWVERNON ST NW91ST ST NE 75 TH S T N E 213TH AVE NW 190TH AVE NWSMITHSTNWLABEAUXAVE NEO BRIAN AVE NEFRONTAGE RD1 96T H L N NWIS L A N D VIEW D R 80TH ST NE146TH ST NW96TH ST NE2 0 7T H A V E N W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152N D STNW225THAVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NEUS HIGHWAY 10 NWBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NW 171ST LN NWSMITH DR NW159THSTNW227THAVENWLINEAVENW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVE NW UPLAND ST NWL I NCOLNSTNW214THLNNW223 R D AV EN W 92ND ST NE160THSTNW89TH ST NE GATES AVE NWTYLERDRNWOCHOAAVENE155THSTNW1 8 3 R D AV E N W 197TH AVE NW 8TH ST NW XAVIER ST NWSTATE HIGHWAY 101 NEPROCTOR RD CSAH 15 NW70THST N E 95TH ST NE ELK LAKE RD NWRANCH RD NW 85TH ST NE RIV E R R D N E TWIN LAKES RD NWO DEAN AVE NECSAH 30 NWMEADOWVALERDNWJARVISST NWCS AH 14 N W192ND AVE NW STATE HIGHWAY 101 NEBROOK RD N W221ST AVE N W 209TH AVENW 181ST AVE NWRAMP PARRISH AVE NENASHUA AVE NEZEBULON ST NWCOUNTY RO AD 79 NW MAIN ST NW MISSISSIPPI RD NW 83RD ST NE 165TH AVE NWTYLER ST NW211 TH AVE N W COUNTY ROAD 35 NW 1 9 3R D A V E N W MASON AVE NE65T H ST NECLEVELANDSTNWLANDER ST NWQUEENSAVENE175THAVE NW198TH AVE JACKSON AVE NW229THAVE NW145TH ST NW77TH ST NE147TH ST NWDODGE ST NWCOUNTY ROAD 83 NW QUADAY AVE NE185 TH AV E N W 60TH ST NE167TH ST NWIRVINGSTNWPROCTORRDNWPOLKSTNWLOWELLSTNW170THSTNWVERNONST NW91ST ST NE 7 5T H S T NE197TH AVE NW 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NEO BRIANAVE NEFRONTAGERD1 9 6 T HLN N W 228TH AVE NWIS L A N D V IE W D R 80TH ST NE172ND ST NW146TH ST NW96TH ST NE2 0 7 T H A V E N W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVE NW152N D ST NW225TH AVE NW 194TH AVE NW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NE169TH STNWBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NW GARY ST NW171ST LN NWSMITH DR NW159TH ST NW227TH AVENWLINEAVENW217THAVENWNEEDHAMAVENEFRESNOSTNW191STAVENWUPLANDST NWAUBURN STNWLINCOLNSTNW214THLNNW 2 2 3 RD AV E N W92NDST NE 89TH ST NE GATESAVENWOCHOAAVENE155THST NW1 8 3 R D AV E N W 8TH ST NW 205TH AVE NW 209TH AVE NW 8 3 R D S T N E JARVIS ST NWRAMPSTATE HIGHWAY 101 CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NWRANCH RD NW 85TH ST NE RIV E R R D N E CSAH 14NW TWIN LAKESRDNWODEANAVENECSAH30NW MEADOWVALE RD NWJARVIS ST NW192NDAVE NWSTATE HIGHWAY 101NEBRO O K R D NW221STAVEN W 209TH AVENW 181STAVE NWRAMP172ND ST NWPARRISH AVENENASHUA AVE NEZEBULON STNW211T HAVE N W COUNTY ROAD 79 NWMAIN ST NW MISSISSIPPI RD N W 83R D ST NE 165TH AVE NWTYLER ST NW198TH AVE COUNTY ROAD 35NW 1 9 3 R D A V E N W 229T H AVE N W MASON AVE NE65T H ST NE CLEVELAND ST NWLANDER ST NWQUEENS AVE NE175THAV ENWJACKSON AVE NW145TH ST NW77T H ST NE 147TH ST N W DODGESTNW231ST AVENW QUADAY AVE NEU S HIG H W A Y 10 N W 185T H AVE N W 60TH ST NE167TH ST NWIRVING ST NWPROCTOR RD NWPOLK ST NWLOWELL ST NW170TH ST NWVERNON ST NW91ST ST NE 197TH AVE NW 7 5 TH S T N E 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NEO BRIAN AVENEFRONTAGE RD19 6 T H LNN W 228TH AVE NW ISLA ND V IE W D R 80T H S T NE146TH ST NW96TH ST NE2 0 7 T H A V E N W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVENW152ND ST NW225TH AVENW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NE169TH STNWBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NW GARY ST NW171ST LN NWSMITH DR NW159TH ST NW227TH AVE NWLINE AVE NW217TH AVE NWNEEDHAM AVE NEFRESNO ST NW191ST AVENW UPLAND ST NWAUBURN ST NWL I NCOLNSTNW214THLNNW22 3 RDAVENW92NDSTNE 89TH ST NE GATESAVE NWOCHOA AVE NE1 55T H S T NW1 83RDAVENW8THSTNW 225TH AVE NW RAMP147TH ST NWJARVIS ST NWPROCTOR RD NW172ND ST NWSTATE HIGHWAY 101 NE221ST AVE N W 172ND ST NWRAMP227TH AVE NW 8 3 R D S CSAH 15 NW70TH ST NE 95TH ST NE ELK LAKE RD NWRANCH RD NW 85TH ST NE RIV E R R D N E CSAH 14NW TWIN LAKESRDNWODEANAVENECSAH30NW MEADOWVALE RD NWJARVIS ST NW192NDAVE NWSTATE HIGHWAY 101NEBRO O K R D NW221STAVEN W 209TH AVENW 181STAVE NWRAMP172ND ST NWPARRISH AVENENASHUA AVE NEZEBULON STNW211T HAVE N W COUNTY ROAD 79 NWMAIN ST NW MISSISSIPPI RD N W 83R D ST NE 165TH AVE NWTYLER ST NW198TH AVE COUNTY ROAD 35NW 1 9 3 R D A V E N W 229T H AVE N W MASON AVE NE65T H ST NE CLEVELAND ST NWLANDER ST NWQUEENS AVE NE175THAV ENWJACKSON AVE NW145TH ST NW77T H ST NE 147TH ST N W DODGESTNW231ST AVENW QUADAY AVE NEU S HIG H W A Y 10 N W 185T H AVE N W 60TH ST NE167TH ST NWIRVING ST NWPROCTOR RD NWPOLK ST NWLOWELL ST NW170TH ST NWVERNON ST NW91ST ST NE 197TH AVE NW 7 5 TH S T N E 213TH AVE NW 190TH AVE NW SMITH ST NWLABEAUX AVE NEO BRIAN AVENEFRONTAGE RD19 6 T H LNN W 228TH AVE NW ISLA ND V IE W D R 80T H S T NE146TH ST NW96TH ST NE2 0 7 T H A V E N W NABER AVE NE201ST AVE NW VANCE ST NW215TH AVENW152ND ST NW225TH AVENW 202ND AVE NW ZANE ST NW88TH ST NE UNKNOWNRAWLINGS AVE NE169TH STNWBALDWIN ST NW182ND AVE NW PARELL AVE NE205TH AVE NW GARY ST NW171ST LN NWSMITH DR NW159TH ST NW227TH AVE NWLINE AVE NW217TH AVE NWNEEDHAM AVE NEFRESNO ST NW191ST AVENW UPLAND ST NWAUBURN ST NWL I NCOLNSTNW214THLNNW22 3 RDAVENW92NDSTNE 89TH ST NE GATESAVE NWOCHOA AVE NE1 55T H S T NW1 8 3RDAVENW8THSTNW225TH AVE NW RAMP147TH ST NWJARVIS ST NWPROCTOR RD NW172ND ST NWSTATE HIGHWAY 101 NE221ST AVE N W 172ND ST NWRAMP227TH AVE NW 8 3 R D S T N E 223R Zone Zone Minutes No. of Calls (1322 Total)% of Calls Covers City Boundary Existing 2 581 43.90%no 4 960 72.60%no 6 1167 88.30%no 8 1282 97%no 10 1294 97.90%yes 12 1298 98.20%yes 14 1302 98.50%yes Station 1 2 499 37.70%no 4 849 64.20%no 6 1139 86.20%no 8 1276 96.50%no 10 1293 97.80%yes 12 1298 98.20%yes 14 1301 98.40%yes Station 2 2 56 4.20%no 4 225 17%no 6 739 56%no 8 1046 79.10%no 10 1241 93.90%no 12 1292 97.70%no 14 1296 98%yes Station 3 2 26 2%no 4 264 20%no 6 773 58.50%no 8 969 73.30%no 10 1207 91.30%no 12 1288 97.40%no 14 1299 98.30%yes New Station West 2 30 2.27%no 4 316 23.90%no 6 870 65.80%no 8 1083 81.90%no 10 1196 90.50%no 12 1299 98.30%no 14 1305 98.70%no Otsego Station 2 94 7.11%no 4 535 40.50%no 6 923 69.80%no 8 1175 88.90%no 10 1253 94.80%no 12 1290 97.60%no 14 1297 98.10%yes Call Analysis Per Zone 44 Firefighter Station 1 Station 1 Station 2 Station 2 Proposed Station 3 Proposed Station 3 Proposed North West Proposed North West Otsego Otsego Minutes Length (ft)Minutes Length (ft)Minutes Length (ft)Minutes Length (ft)Minutes Length (ft) 1 5.1 18418.8 5.8 19403.8 8.8 33493.5 4.3 20712.1 8.1 28529.1 2 3.7 13118.7 7.0 21732.1 6.2 25286.9 6.9 29859.5 5.9 21217.1 3 4.8 16582.4 8.1 25503.7 2.8 12262.0 7.4 31473.2 7.0 24988.7 4 5.1 21744.6 3.1 12868.5 9.5 38707.2 7.3 29903.3 7.8 31314.6 5 1.7 4252.0 4.4 11848.5 5.3 19326.7 4.0 12775.0 5.0 15422.1 6 2.8 7926.3 3.2 8059.8 7.2 24914.0 5.0 16085.0 5.5 17521.4 7 8.8 34477.5 12.1 43398.8 4.5 19345.6 6.3 25008.6 11.0 42883.8 8 3.9 10771.2 7.2 19692.5 2.2 8657.1 5.9 22915.5 6.1 19177.5 9 4.6 16898.8 5.0 17032.3 9.1 33886.4 6.1 21677.0 7.3 26493.8 10 6.1 20239.4 9.6 31275.8 4.7 16537.9 3.0 11231.0 8.8 28642.0 11 4.8 14928.7 5.2 15062.2 9.3 31916.4 6.5 20360.7 7.6 24523.8 12 2.5 6487.1 6.2 16827.2 4.4 13990.9 2.8 7829.0 5.6 20348.4 13 1.2 2808.3 4.9 12988.8 4.4 16977.9 4.3 17606.4 3.8 12473.8 14 3.3 10357.1 3.7 10490.6 7.7 27344.7 5.4 17549.5 6.0 19952.1 15 3.2 7850.2 5.5 15532.1 5.7 16777.9 2.4 7739.9 6.5 19020.3 16 4.0 11416.9 7.3 20338.1 3.7 15358.7 6.6 26307.6 6.2 19823.1 17 5.4 19042.7 8.6 27964.0 0.3 787.9 7.0 25499.5 7.5 27449.0 18 4.6 15771.2 1.5 3933.8 9.1 32670.6 6.9 23943.0 7.3 25278.0 19 3.2 7958.9 6.9 18299.0 4.5 13352.1 5.0 17392.2 6.0 19362.9 20 7.5 29005.4 4.9 17947.6 11.9 45904.8 9.7 37177.2 10.2 38512.2 21 2.6 7396.3 5.8 15795.2 6.5 22887.4 7.1 21568.1 1.7 5491.2 22 4.0 11034.7 7.3 19956.0 3.1 12182.5 6.0 23179.0 6.2 19441.0 23 4.6 14973.8 5.2 15958.8 8.2 30048.5 4.5 15205.6 7.5 25084.1 24 4.2 13234.8 4.6 13368.3 8.6 30222.4 5.8 18666.8 6.9 22829.8 25 2.2 6518.0 2.2 5767.7 6.7 23417.5 4.5 14733.9 4.9 15132.1 26 5.7 17863.5 6.3 18848.5 9.3 32938.2 5.5 24452.5 8.6 27973.8 27 3.4 9564.0 6.7 18485.3 2.5 10711.8 5.4 21708.3 5.6 17970.3 28 4.1 11206.5 7.3 20127.8 3.2 12354.3 6.1 23350.8 6.3 19612.8 29 5.2 19669.7 5.6 19803.2 9.6 36657.3 6.7 24447.9 7.9 29264.7 30 4.3 13642.5 4.9 14627.4 7.9 28717.2 4.2 13874.2 7.2 23752.8 31 5.4 18668.8 5.8 18802.3 9.8 35656.5 6.9 23447.0 8.1 28263.8 32 4.0 11424.3 5.7 16422.4 7.0 19997.9 2.2 6980.4 6.9 21534.6 33 4.5 14291.4 5.1 15276.4 8.2 29366.1 4.5 14523.2 7.4 24401.7 34 5.4 22378.9 3.4 13419.2 9.8 39278.3 7.6 30525.9 8.1 31885.7 35 4.9 15917.3 5.6 16902.2 8.6 30992.0 4.9 16149.0 7.9 26027.5 36 3.2 8007.5 7.0 18347.5 3.8 12016.1 3.7 14340.1 6.1 19411.4 Firefighter Drive Times To Stations 45 37 2.8 6865.1 5.5 15713.2 5.3 15792.8 2.4 7921.0 6.1 18035.1 38 2.5 6638.4 6.2 16978.5 4.2 13167.8 3.8 14730.3 5.3 18042.3 39 7.2 34607.5 5.2 25731.5 11.7 51570.1 9.4 42766.2 9.9 44177.5 40 3.4 8493.2 7.2 18833.3 3.3 10651.9 4.4 16167.8 6.3 19897.1 41 5.9 16958.5 9.6 31011.6 4.4 15741.1 3.0 10966.8 8.5 27845.3 42 5.9 16958.5 9.6 31011.6 4.4 15741.1 3.0 10966.8 8.5 27845.3 43 2.5 7694.8 2.9 7828.3 6.9 24682.5 4.7 15853.5 5.2 17289.9 44 5.1 16895.2 3.1 8019.2 9.6 33857.8 7.3 25053.9 7.9 26465.2 45 3.9 12697.6 4.3 12831.1 8.0 29072.4 4.3 14229.5 6.6 22292.6 Average 4.3 14081.3 5.8 17779.2 6.5 23671.6 5.4 19752.3 6.9 23620.0 Mean 4.009483 12455.411 5.432224 16313.88 5.680443865 20410.30708 5.040904693 18223.53012 6.67557 22470.116 3rd Quartile 5.134785 16958.546 6.960382 19803.176 8.805443355 31916.37568 6.662949459 24447.88344 7.853801 27845.28 46 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies APPENDIX B SPACE NEEDS ANALYSIS PROBABLE PROJECT COST ANALYSIS Fire Station No. 2 New East Fire Station New Northwest Fire Station Police Department (Probable Project Cost Only) Training Center 47 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Fire Station No. 2 48 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Proposed Bay Engines /Pumpers Engine(s)45 x 18 =810 0 0 Rescue Pumper 45 x 18 =810 0 0 Quint 90 x 18 =1620 0 0 Aerial Apparatus Ladder/Snorkel 90 x 18 =1620 0 0 Aerial Platform 90 x 18 =1620 0 0 Telesquirt 90 x 18 =1620 0 0 Heavy Rescue Units Rescue Squad 45 x 18 =810 0 0 Tender 45 x 18 =810 0 0 Light Trucks/SUV's/Pickups Medium or Light Rescue 45 x 18 =810 0 0 Incident Command Vehicle 45 x 18 =810 0 0 Utility/Pickup 45 x 18 =810 0 0 Arson Unit 45 x 18 =810 0 0 Inspections Vehicle(s)45 x 18 =810 0 0 Wildland Unit 45 x 18 =810 0 0 Trailers HazMat 22 x 18 =396 0 0 Incident Support Trailer (IST)45 x 18 =810 0 0 Mass Casualty Unit 22 x 18 =396 0 0 Boat 22 x 18 =396 0 0 Snowmobile/ATV 22 x 18 =396 0 0 Portable Pump 22 x 18 =396 0 0 Firefighter Rehab Unit 22 x 18 =396 0 0 SCBA Cleanand Fill 22 x 18 =396 0 0 Portable lights 22 x 18 =396 0 0 Safe Escape Trailer 22 x 18 =396 0 0 Other Equipment/Space Parade Vehicle/Trailer 45 x 18 =810 0 0 Vehicle Maintenance Bay 45 x 18 =810 0 0 Wash Bay 45 x 18 =810 0 0 Building Maintenance Equip 20 x 20 =400 0 0 EMS Ambulance 45 x 18 =810 0 0 First Responder 45 x 18 =810 0 0 EMS Command Vehicle 45 x 18 =810 0 0 Mass Casualty Trailer 22 x 18 =396 0 0 Staff Support Unit 25 x 18 =450 0 0 Other Space Need TOTAL 0 0 0 0 0 Existing Equipment Future Equipment See also Training for other Apparatus and Large Equipment 3 4 5 6 7 8 60 80 100 120 140 160 60 3600 4800 6000 7200 8400 9600 80 4800 6400 8000 9600 11200 12800 90 5400 7200 9000 10800 12600 14400 100 6000 8000 10000 12000 14000 16000 Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Location: Elk River, MN Notes Apparatus Bays 1-Aug-17 In Cold Storage 1936 Chevy Fire Engine in Lobby Depth Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign. com Subtotal ( Ft2)Efficiency Ratio of 5%Apparatus Floor Total ( Ft2)Number of Bays Length Apparatus Bay Sizing Table ( Ft2)Same as IST Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Training Tower 30 x 20 =600 0 0 Hose/Gear Dryer 8 x 10 = 80 0 0 Protective Gear Lockers 5 x 2 =10 25 250 Decon Spaces Dirty Restroom 8 x 8 =64 2 128 Gear Laundry 10 x 10 =100 1 100 Residential Laundry Equip.8 x 10 = 80 1 80 Equipment Decon 8 x 10 = 80 1 80 Personnel Decon Locker Room 10 x 12 =120 1 120 Personal Decon Spaces 6 x 10 = 60 2 120 SCBA Equipment Work Room/SCBA 8 x 11 = 88 0 0 SCBA Clean and Fill Room 8 x 12 = 96 0 0 Vehicle Maintenance Room 10 x 12 =120 0 0 Hazmat. Booms and Other Storage 10 x 10 =100 0 0 General Storage 10 x 10 =100 0 0 Mezzanine 80 x 20 =1600 0 0 Medical Related Spaces EMS Report Writing 8 x 12 = 96 0 0 EMS Storage 8 x 10 = 80 0 0 Regulated Storage 6 x 6 =36 0 0 Bio Hazard Control 6 x 6 =36 0 0 Janitors Closet 8 x 4 =32 0 0 TOTAL 0 878 35 x 16 560 4 176 1,054 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Apparatus Support Total (Ft2) Efficiency Ratio of 20% See also Living Quarters With (20) 1/2 lockers 1 shower and 1 steam room Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Notes Location: Elk River, MN In Decon Spaces Toilet and Shower with hose real Separate from Ap Bay Commercial extractor and dryer Cleaning backboards, etc. Apparatus Support 50 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Internal Training Training Room/Community Room 35 x 60 =2100 0 0 Training Storage 12 x 12 = 144 0 0 Table and Chair Storage 10 x 12 = 120 0 0 General Storage 10 x 12 = 120 0 0 Large Training Props 20 x 24 = 480 0 0 Kitchen/Kitchenette 16 X 12 = 192 0 0 Physical Fitness Exercise Room 30 x 30 = 900 0 0 Wellness space 8 x 10 = 80 0 0 Locker Room(s)20 x 15 = 300 0 0 Shower/Toilets 8 x 10 = 80 0 0 Sub Total TEMPERED STORAGE, Proposed TRAINING APPARATUS & EQUIPMENT Bay Building Maintenance Equipment 20 x 20 = 400 0 0 Training Props 10 x 20 = 200 0 0 General Storage 10 x 20 = 200 0 0 Mobile Live Burn Trlr (MLFTU)60 x 16 = 960 0 0 Mobile Training Tower (MTT)60 x 16 = 960 0 0 Ventilation Trlr (Vent)40 x 16 = 640 0 0 Driving Simulator (Driving)40 x 16 = 640 0 0 Tractor Trailer (semi)30 x 16 = 480 0 0 Survive Alive Trailer 40 x 16 = 640 0 0 Portable lighting 24 x 16 = 384 0 0 Boat and Trailer 35 x 16 = 560 0 0 Snowmobile/ATV/Trailer 16 x 16 = 256 0 0 Safe Escape Trailer 60 x 16 = 960 0 0 Sub Total TOTAL 0 0 0 0 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Training Total (Ft2) Includes efficiency ratio 0 0 Includes efficiency ratio 25 Full size lockers In decon area Serving with fridge Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Location: Elk River, MN Notes Training 1-Aug-17 100 at table and chairs. Shared with community 51 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Fire Chief 20 x 12 =240 0 0 Training Chief 16 x 12 =192 0 0 Fire Marshal/Investigator 16 x 12 =192 0 0 Evidence Storage 6 x 8 =48 0 0 Plan/Equip Storage 8 x 8 =64 0 0 Deputy/Battalion Chiefs 30 x 10 =300 0 0 Sleeping Room 10 x 13 =130 0 0 Toilet/Shower 8 x 10 = 80 0 0 Officers Offices 10 x 13 =130 3 390 Pub Ed Office 14 x 12 =168 0 0 Pub Ed Storage 6 x 8 =48 0 0 Inspections Unit Inspectors Office 14 x 12 =168 0 0 Plan Review 18 x 12 =216 0 0 Conference Room 18 x 14 =252 0 0 Resource Library 2 x 10 = 20 0 0 Record Storage 14 x 12 =168 0 0 Future Office 16 x 10 =160 0 0 Administrative Assist. Office 16 x 12 =192 0 0 Fax/Work/Copy 8 x 10 = 80 0 0 Record Storage 8 x 10 = 80 0 0 Misc. Office Supplies 4 x 6 =24 0 0 Conference Room 20 x 20 =400 0 0 Staff Toilets 8 x 8 =64 0 0 Watch/Comm Office 16 x 12 =192 0 0 POC Staging Area 8 x 12 = 96 0 0 Study/Work Area 8 x 10 = 80 0 0 Resource Library 2 x 10 = 20 0 0 New Gear and Uniform Storage 8 x 16 =128 0 0 General Storage 8 x 10 = 80 0 0 Communications/ IT 10 x 20 =200 0 0 Public/Support Spaces Entrance Vestibule 30 x 20 =600 0 0 Walk-in Med Check/Ed Space 6 x 8 =48 0 0 Public Toilets 10 x 14 =140 0 0 Elevator 10 x 20 =200 0 0 Stairs 24 x 10 =240 0 0 Janitors Closet 6 x 4 =24 0 0 TOTAL 0 390 98 488 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Administration/Office Spaces Total (Ft2) Efficiency Ratio of 25% Subtotal (Ft2) 1936 Chevy Location: Elk River, MN Open area with layout table Notes Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Administration/Office Spaces Murphy Beds Public Entrance to Training Center Training Materials Code Books 52 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Day Room 20 x 15 =300 1 300 Kitchen 20 x 20 =400 1 400 Pantry 8 x 8 =64 0 0 Dining for 8-12 20 x 15 =300 1 300 Dorm Room 10 x 13 =130 0 0 Restrooms/Showers 8 x 10 = 80 0 0 Linen Closet 6 x 8 =48 0 0 Supply Closet 4 x 5 =20 0 0 Residential Laundry 8 x 10 = 80 0 0 Janitor's Closet 6 x 6 =36 1 36 TOTAL 0 1,036 259 1,295 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Living Quarters Spaces Total (Ft2) Future Future 4) Future Future Future Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Location: Elk River, MN Notes Living Quarters/Support Spaces 8-10 people 53 Location: Elk River, MN 1-Aug-17 Spaces Existing Quantity Parking Fire Staff Parking 8 EMS Staff Parking 0 Public Parking 0 Training Parking 0 Total Parking 8 Fire Apparatus Apron 0 EMS Apparatus Apron 0 Outdoor Training 0 Outdoor Patio 1 Enclosed Dumpster 0 External Generator 0 Storm Water Treatment 0 Heliport Pad 0 Extrication pavement 0 Detatched storage building 0 Live Burn Building 0 Confined Space Prop 0 Car Fire Prop 0 Utility Fire Prop 0 Rail Car Prop 0 Hazmat Prop 0 Other Agencies Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Site Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Notes Near new addtion 54 Date: 1-Aug-17 Totals Existing Areas 0 0 1,054 0 0 0 488 0 1,295 0 0 0 2,836 Station Footprint (Ft2) Sub Total 0 142 Infrastructure (M & E) Space Factor 15% 2,978 TOTAL PROGRAM SPACE REQUIRMENT NOTES: Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Apparatus Bays Location: Elk River, MN Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Living Quarters & Support Apparatus Support Training Administration/Office Tempered Spaces 55 Date: 1-Aug-17 Low High I. Site Acquisition Preferred Site $0 $0 Other Sites Sub Total $0 $0 II. Site Development 15%20% Utility Extensions $0 $0 Unsuitable Soils/Rock Removal $0 $0 Natural Gas Extensions $0 $0 Storm Water $0 $0 Site Improvements (hardscape)5%-10% of building costs $27,605 $58,563 Sub Total $27,605 $58,563 III. Building Construction Costs Size Cost/SF RS Means (20165)2,978 $ 196.66 $585,635 Five Bugles Historic (2016/17)2,978 $ 185.40 $552,104 Cold Storage 0 $151.87 $0 $0 Sub Total $552,104 $ 585,635 IV. Furniture Fixtures and Equipment FF&E $25,000 $35,000 Specific Equipment by Owner $0 $0 Others $0 $0 Sub Total $25,000 $35,000 V. Communications and Technology Technology $15,000 $20,000 Communications $0 $0 Audio Visual Equipment $0 $0 Sub Total $15,000 $20,000 VI. Contingencies, Inflation and Other Costs Inflation to mid-point of construction $32,845 $34,960 Owners Contingency $65,255 $73,416 Sub Total $98,100 $108,376 VI. Professional Fees and Legal Architectural/Engineering $78,565 $83,904 Geotechnical Studies $15,000 $25,000 Commissioning $0 $0 LEED/Sustainability $0 $0 Hazardous Materials $0 $0 Testing and Inspections $15,000 $25,000 Legal $15,303 $25,625 Sub-Total $123,868 $ 159,529 TOTALS $841,676.31 $ 967,103.20 Location: Elk River, MN Potential Costs Remarks Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Typical hardscape Assume spring of 2018 construction start Assumes mostly new SCBA, Exercise, vehicle exhaust Building Only Building Only Tempered construction Allowance Allowance Allowance 3%-5% total construction cost Data systems, backbone, patch panels Radio, Tower, Repeaters, Etc. 10% of total construction costs Unforeseen Conditions, Owner Changes, E&O 12% of Construction Costs 2.5-4% of Costs Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Cost of borrowing, Att. Fees, etc. 56 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies New East Fire Station 57 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Proposed Bay Engines /Pumpers Engine(s)45 x 18 =810 1 810 Rescue Pumper 45 x 18 =810 0 0 Quint 90 x 18 =1620 0 0 Aerial Apparatus Ladder/Snorkel 90 x 18 =1620 0 0 Aerial Platform 90 x 18 =1620 0 0 Telesquirt 90 x 18 =1620 0 0 Heavy Rescue Units Rescue Squad 45 x 18 =810 0 0 Tender 45 x 18 =810 1 810 Light Trucks/SUV's/Pickups Medium or Light Rescue 45 x 18 =810 0 0 Command Vehicle 45 x 18 =810 0 0 Utility/Pickup 45 x 18 =810 1 810 Arson Unit 45 x 18 =810 0 0 Inspections Vehicle(s)45 x 18 =810 0 0 Wildland Unit 45 x 18 =810 1 810 Trailers HazMat 22 x 18 =396 0 0 Special Operations 22 x 18 =396 0 0 Mass Casualty Unit 22 x 18 =396 0 0 Boat 22 x 18 =396 0 0 Snowmobile/ATV 22 x 18 =396 0 0 Portable Pump 22 x 18 =396 0 0 Firefighter Rehab Unit 22 x 18 =396 0 0 SCBA Cleanand Fill 22 x 18 =396 0 0 Portable lights 22 x 18 =396 0 0 Other Equipment/Space Parade Vehicle/Trailer 45 x 18 =810 0 0 Vehicle Maintenance Bay 45 x 18 =810 0 0 Wash Bay 45 x 18 =810 0 0 Building Maintenance Equip 20 x 20 =400 0 0 EMS Ambulance 45 x 18 =810 0 0 First Responder 45 x 18 =810 0 0 EMS Command Vehicle 45 x 18 =810 0 0 Mass Casualty Trailer 22 x 18 =396 0 0 Staff Support Unit 25 x 18 =450 0 0 Other Space Need 4800 TOTAL 0 4 4,800 240 5,040 Existing Equipment Future Equipment See also Training for other Apparatus and Large Equipment 3 4 5 6 7 8 60 80 100 120 140 160 60 3600 4800 6000 7200 8400 9600 80 4800 6400 8000 9600 11200 12800 90 5400 7200 9000 10800 12600 14400 100 6000 8000 10000 12000 14000 16000 Project: Elk River Fire Department - East Station/Otsego Location: Elk River, MN Notes Apparatus Bays 1-Aug-17 Depth Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign. com Subtotal ( Ft2)Efficiency Ratio of 5%Apparatus Floor Total ( Ft2)Number of Bays Length Apparatus Bay Sizing Table ( Ft2)Assume (3)80'-90' bays to allow for training, reserve vehicle storage and equipment placement issues Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Hose/Training Tower 30 x 20 = 600 0 0 Hose Dryer 8 x 10 = 80 1 80 Protective Gear Lockers 5 x 2 = 10 25 250 Decon Spaces Dirty Restroom 8 x 8 = 64 1 64 Gear Laundry 10 x 10 = 100 1 100 Residential Laundry Equip.8 x 10 = 80 1 80 Equipment Decon 8 x 10 = 80 1 80 SCBA Equipment Work Room/SCBA 8 x 11 = 88 1 88 SCBA Clean and Fill Room 8 x 12 = 96 1 96 Vehicle Maintenance Room 8 x 10 = 80 1 80 Hazmat. Booms and Other Storage 8 x 10 = 80 1 80 General Storage 8 x 10 = 80 1 80 Mezzanine 80 x 20 =1600 1 1600 Medical Related Spaces EMS Report Writing 8 x 12 = 96 0 0 EMS Storage 8 x 10 = 80 0 0 Regulated Storage 6 x 6 = 36 0 0 Bio Hazard Control 6 x 6 = 36 0 0 Janitors Closet 8 x 4 = 32 1 32 TOTAL 0 2,710 35 x 16 560 4 542 3,252 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Apparatus Support Total (Ft2) Efficiency Ratio of 20% See also Living Quarters Project: Elk River Fire Department - East Station/Otsego Notes Location: Elk River, MN Toilet and Shower with hose real Commercial extractor and dryer Cleaning backboards, etc. Apparatus Support 59 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Internal Training Training Room/Community Room 30 x 60 =1800 1 1800 Training Storage 8 x 10 = 80 1 80 Table and Chair Storage 8 x 10 = 80 1 80 General Storage 8 x 10 = 80 1 80 Kitchen/Kitchenette 10 X 12 =120 1 120 Physical Fitness Exercise Room 25 x 30 =750 1 750 Wellness space 8 x 10 = 80 1 80 Locker Room(s)20 x 15 =300 1 300 Shower/Toilets 12 x 10 =120 2 240 Large Training Props 20 x 24 =480 0 0 Sub Total TEMPERED STORAGE, Proposed TRAINING APPARATUS & EQUIPMENT Bay Building Maintenance Equipment 20 x 20 =400 0 0 Training Props 10 x 20 =200 0 0 General Storage 10 x 20 =200 0 0 Mobile Live Burn Trlr (MLFTU)60 x 16 =960 0 0 Mobile Training Tower (MTT)60 x 16 =960 0 0 Ventilation Trlr (Vent)40 x 16 =640 0 0 Driving Simulator (Driving)40 x 16 =640 0 0 Tractor Trailer (semi)30 x 16 =480 0 0 Survive Alive Trailer 40 x 16 =640 0 0 Portable lighting 24 x 16 =384 0 0 Boat and Trailer 35 x 16 =560 0 0 Snowmobile/ATV/Trailer 16 x 16 =256 0 0 Other Sub Total TOTAL 0 3,530 883 4,413 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Training Total (Ft2) Includes efficiency ratio 0 4412.5 Includes efficiency ratio At other facilities Steam or other decontamination space Fridge, no stove Project: Elk River Fire Department - East Station/Otsego Location: Elk River, MN Notes Training 1-Aug-17 Shared with community. 50 people with public access 60 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Fire Chief 20 x 12 =240 0 0 Assistant Chief 16 x 12 =192 0 0 Fire Marshal/Investigator 16 x 12 =192 0 0 Evidence Storage 6 x 8 =48 0 0 Plan/Equip Storage 8 x 8 =64 0 0 Deputy/Battalion Chiefs 30 x 10 =300 0 0 Sleeping Room 10 x 13 =130 0 0 Toilet/Shower 8 x 10 = 80 0 0 Officers Offices 10 x 13 =130 3 390 Pub Ed Office 14 x 12 =168 0 0 Pub Ed Storage 6 x 8 =48 0 0 Inspections Unit Inspectors Office 14 x 12 =168 0 0 Plan Review 18 x 12 =216 0 0 Conference Room 18 x 14 =252 0 0 Resource Library 2 x 10 = 20 0 0 Record Storage 14 x 12 =168 0 0 Future Office 16 x 10 =160 0 0 Administrative Assist. Office 16 x 12 =192 0 0 Fax/Work/Copy 8 x 10 = 80 0 0 Record Storage 8 x 10 = 80 0 0 Misc. Office Supplies 4 x 6 =24 0 0 Conference Room 20 x 20 =400 0 0 Staff Toilets 10 x 12 =120 2 240 Watch/Comm Office 16 x 12 =192 1 192 POC Staging Area 8 x 12 = 96 0 0 Study/Work Area 8 x 10 = 80 0 0 Resource Library 2 x 10 = 20 0 0 New Gear and Uniform Storage 8 x 16 =128 0 0 General Storage 8 x 10 = 80 1 80 Communications/ IT 10 x 10 =100 1 100 Public/Support Spaces Entrance Vestibule 10 x 15 =150 1 150 Walk-in Med Check/Ed Space 6 x 8 =48 0 0 Public Toilets 8 x 8 =64 2 128 Elevator 10 x 20 =200 0 0 Stairs 24 x 10 =240 0 0 Janitors Closet 6 x 4 =24 1 24 TOTAL 0 1,304 326 1,630 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Administration/Office Spaces Total (Ft2) Efficiency Ratio of 25% Subtotal (Ft2) Historic displays or vehicles Location: Elk River, MN Open area with layout table Notes Project: Elk River Fire Department - East Station/Otsego Administration/Office Spaces With showers Murphy beds in offices Training Materials Code Books 61 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Day Room 20 x 15 =300 1 300 Kitchen 15 x 20 =300 1 300 Pantry 8 x 8 =64 1 64 Dining for 8-12 20 x 15 =300 0 0 Dorm Room 10 x 13 =130 0 0 Restrooms/Showers 8 x 10 = 80 0 0 Linen Closet 6 x 8 =48 0 0 Supply Closet 4 x 5 =20 1 20 Residential Laundry 8 x 10 = 80 0 0 Janitor's Closet 6 x 6 =36 1 36 TOTAL 0 720 180 900 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Living Quarters Spaces Total (Ft2) 4 recliners Dining for 4-6 Future Addition Future Addition Future Addition Project: Elk River Fire Department - East Station/Otsego Location: Elk River, MN Notes Living Quarters/Support Spaces 62 Location: Elk River, MN 1-Aug-17 Spaces Existing Quantity Parking Fire Staff Parking 25 EMS Staff Parking 0 Public Parking 5 Other Parking 0 Total Parking 30 Fire Apparatus Apron 1 EMS Apparatus Apron 0 Outdoor Training 0 Outdoor Patio 1 Enclosed Dumpster 1 External Generator 1 Storm Water Treatment 1 Heliport Pad 0 Extrication pavement 0 Detatched storage building 0 Other 0 Other 0 Other 0 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Site Project: Elk River Fire Department - East Station/Otsego Notes 63 Date: 1-Aug-17 Totals Existing Areas 5,040 0 3,252 0 4,413 0 1,630 0 900 0 0 0 15,235 Station Footprint (Ft2) Sub Total 0 2,285 Infrastructure (M & E) Space Factor 15% 17,520 TOTAL PROGRAM SPACE REQUIRMENT NOTES: Project: Elk River Fire Department - East Station/Otsego Apparatus Bays Location: Elk River, MN Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Living Quarters & Support Apparatus Support Training Administration/Office Tempered Spaces 64 Date: 1-Aug-17 Low High I. Site Acquisition Preferred Site $0 $0 Other Sites Sub Total $0 $0 II. Site Development 15%20% Utility Extensions $0 $0 Unsuitable Soils/Rock Removal $0 $0 Natural Gas Extensions $0 $0 Storm Water $0 $0 Site Improvements (hardscape)15%-20% of building costs $487,222 $689,084 Sub Total $487,222 $ 689,084 III. Building Construction Costs Size Cost/SF RS Means (20165)17,520 $ 196.66 $3,445,419 Five Bugles Historic (2016/17)17,520 $ 185.40 $3,248,148 Cold Storage 0 $151.87 $0 $0 Sub Total $3,248,148 $3,445,419 IV. Furniture Fixtures and Equipment FF&E $97,444 $172,271 Specific Equipment by Owner $0 $0 Others $0 $0 Sub Total $97,444 $172,271 V. Communications and Technology Technology $97,444 $172,271 Communications $0 $0 Audio Visual Equipment $0 $0 Sub Total $97,444 $172,271 VI. Contingencies, Inflation and Other Costs Inflation to mid-point of construction $208,304 $ 223,952 Owners Contingency $206,928 $ 235,150 Sub Total $415,232 $ 459,102 VI. Professional Fees and Legal Architectural/Engineering $287,177 $ 403,114 Geotechnical Studies $15,000 $25,000 Commissioning $0 $0 LEED/Sustainability $0 $0 Hazardous Materials $0 $0 Testing and Inspections $15,000 $25,000 Legal $90,383 $151,598 Sub-Total $407,560 $ 604,713 TOTALS $4,753,050.38 $5,542,859.70 Location: Elk River, MN Potential Costs Remarks Project: Elk River Fire Department - East Station/Otsego Typical hardscape Assume spring of 2018 construction start Assumes mostly new SCBA, Exercise, vehicle exhaust Building Only Building Only Tempered construction 3-5% of Building Construction 3-5% of Building Construction Allowance 3%-5% total construction cost Data systems, backbone, patch panels Radio, Tower, Repeaters, Etc. 5% of total construction costs Unforeseen Conditions, Owner Changes, E&O 7-9% of Construction Costs 2.5-4% of Costs Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Cost of borrowing, Att. Fees, etc. 65 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies New Northwest Fire Station 66 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Proposed Bay Engines /Pumpers Engine(s)45 x 18 =810 2 1620 Rescue Pumper 45 x 18 =810 0 0 Quint 90 x 18 =1620 0 0 Aerial Apparatus Ladder/Snorkel 90 x 18 =1620 1 1620 Aerial Platform 90 x 18 =1620 0 0 Telesquirt 90 x 18 =1620 0 0 Heavy Rescue Units Rescue Squad 45 x 18 =810 0 0 Tender 45 x 18 =810 1 810 Light Trucks/SUV's/Pickups Medium or Light Rescue 45 x 18 =810 0 0 Incident Command Vehicle 45 x 18 =810 1 810 Utility/Pickup 45 x 18 =810 1 810 Arson Unit 45 x 18 =810 0 0 Inspections Vehicle(s)45 x 18 =810 0 0 Wildland Unit 45 x 18 =810 1 810 Trailers HazMat 22 x 18 =396 0 0 Incident Support Trailer (IST)45 x 18 =810 1 810 Mass Casualty Unit 22 x 18 =396 0 0 Boat 22 x 18 =396 0 0 Snowmobile/ATV 22 x 18 =396 0 0 Portable Pump 22 x 18 =396 0 0 Firefighter Rehab Unit 22 x 18 =396 0 0 SCBA Cleanand Fill 22 x 18 =396 0 0 Portable lights 22 x 18 =396 0 0 Safe Escape Trailer 22 x 18 =396 0 0 Other Equipment/Space Parade Vehicle/Trailer 45 x 18 =810 0 0 Vehicle Maintenance Bay 45 x 18 =810 0 0 Wash Bay 45 x 18 =810 0 0 Building Maintenance Equip 20 x 20 =400 0 0 EMS Ambulance 45 x 18 =810 0 0 First Responder 45 x 18 =810 0 0 EMS Command Vehicle 45 x 18 =810 0 0 Mass Casualty Trailer 22 x 18 =396 0 0 Staff Support Unit 25 x 18 =450 0 0 Other Space Need TOTAL 0 8 7,290 365 7,655 Existing Equipment Future Equipment See also Training for other Apparatus and Large Equipment 3 4 5 6 7 8 60 80 100 120 140 160 60 3600 4800 6000 7200 8400 9600 80 4800 6400 8000 9600 11200 12800 90 5400 7200 9000 10800 12600 14400 100 6000 8000 10000 12000 14000 16000 Same as IST Depth Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign. com Subtotal ( Ft2)Efficiency Ratio of 5%Apparatus Floor Total ( Ft2)Number of Bays Length Apparatus Bay Sizing Table ( Ft2)1936 Chevy Fire Engine in Lobby In Cold Storage Project: Elk River Fire Department - New Northwest Station Location: Elk River, MN Notes Apparatus Bays 1-Aug- 17 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Training Tower 30 x 20 =600 1 600 Hose/Gear Dryer 8 x 10 = 80 1 80 Protective Gear Lockers 5 x 2 =10 25 250 Decon Spaces Dirty Restroom 8 x 8 =64 1 64 Gear Laundry 10 x 10 =100 1 100 Residential Laundry Equip.8 x 10 = 80 1 80 Equipment Decon 8 x 10 = 80 1 80 Personnel Decon Locker Room 10 x 12 =120 1 120 Personal Decon Spaces 6 x 10 = 60 2 120 SCBA Equipment Work Room/SCBA 8 x 11 = 88 1 88 SCBA Clean and Fill Room 8 x 12 = 96 1 96 Vehicle Maintenance Room 10 x 12 =120 1 120 Hazmat. Booms and Other Storage 10 x 10 =100 1 100 General Storage 10 x 10 =100 1 100 Mezzanine 80 x 20 =1600 1 1600 Medical Related Spaces EMS Report Writing 8 x 12 = 96 0 0 EMS Storage 8 x 10 = 80 1 80 Regulated Storage 6 x 6 =36 0 0 Bio Hazard Control 6 x 6 =36 0 0 Janitors Closet 8 x 4 =32 1 32 TOTAL 0 3,710 35 x 16 560 4 742 4,452 Project: Elk River Fire Department - New Northwest Station Notes Location: Elk River, MN In Decon Spaces Toilet and Shower with hose real Separate from Ap Bay Commercial extractor and dryer Cleaning backboards, etc. Apparatus Support See also Living Quarters With (20) 1/2 lockers 1 shower and 1 steam room Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Apparatus Support Total (Ft2) Efficiency Ratio of 20% 68 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Internal Training Training Room/Community Room 35 x 60 =2100 1 2100 Training Storage 12 x 12 = 144 1 144 Table and Chair Storage 10 x 12 = 120 1 120 General Storage 10 x 12 = 120 1 120 Large Training Props 20 x 24 = 480 0 0 Kitchen/Kitchenette 16 X 12 = 192 1 192 Physical Fitness Exercise Room 30 x 30 = 900 1 900 Wellness space 8 x 10 = 80 0 0 Locker Room(s)20 x 15 = 300 1 300 Shower/Toilets 8 x 10 = 80 2 160 Sub Total TEMPERED STORAGE, Proposed TRAINING APPARATUS & EQUIPMENT Bay Building Maintenance Equipment 20 x 20 = 400 0 0 Training Props 10 x 20 = 200 1 200 General Storage 10 x 20 = 200 1 200 Mobile Live Burn Trlr (MLFTU)60 x 16 = 960 0 0 Mobile Training Tower (MTT)60 x 16 = 960 0 0 Ventilation Trlr (Vent)40 x 16 = 640 0 0 Driving Simulator (Driving)40 x 16 = 640 0 0 Tractor Trailer (semi)30 x 16 = 480 0 0 Survive Alive Trailer 40 x 16 = 640 0 0 Portable lighting 24 x 16 = 384 0 0 Boat and Trailer 35 x 16 = 560 0 0 Snowmobile/ATV/Trailer 16 x 16 = 256 0 0 Safe Escape Trailer 60 x 16 = 960 1 960 Sub Total TOTAL 0 5,396 1,349 6,745 In decon area Serving with fridge Project: Elk River Fire Department - New Northwest Station Location: Elk River, MN Notes Training 1-Aug-17 100 at table and chairs. Shared with community 5045 Includes efficiency ratio 25 Full size lockers 1700 Includes efficiency ratio Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Training Total (Ft2) 69 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Fire Chief 20 x 12 =240 0 0 Training Chief 16 x 12 =192 1 192 Fire Marshal/Investigator 16 x 12 =192 0 0 Evidence Storage 6 x 8 =48 0 0 Plan/Equip Storage 8 x 8 =64 0 0 Deputy/Battalion Chiefs 30 x 10 =300 0 0 Sleeping Room 10 x 13 =130 0 0 Toilet/Shower 8 x 10 = 80 0 0 Officers Offices 10 x 13 =130 2 260 Pub Ed Office 14 x 12 =168 1 168 Pub Ed Storage 6 x 8 =48 1 48 Inspections Unit Inspectors Office 14 x 12 =168 0 0 Plan Review 18 x 12 =216 0 0 Conference Room 18 x 14 =252 0 0 Resource Library 2 x 10 = 20 0 0 Record Storage 14 x 12 =168 0 0 Future Office 16 x 10 =160 0 0 Administrative Assist. Office 16 x 12 =192 1 192 Fax/Work/Copy 8 x 10 = 80 1 80 Record Storage 8 x 10 = 80 1 80 Misc. Office Supplies 4 x 6 =24 1 24 Conference Room 20 x 20 =400 1 400 Staff Toilets 8 x 8 =64 2 128 Watch/Comm Office 16 x 12 =192 1 192 POC Staging Area 8 x 12 = 96 0 0 Study/Work Area 8 x 10 = 80 1 80 Resource Library 2 x 10 = 20 1 20 New Gear and Uniform Storage 8 x 16 =128 0 0 General Storage 8 x 10 = 80 1 80 Communications/ IT 10 x 20 =200 1 200 Public/Support Spaces Entrance Vestibule 30 x 20 =600 1 600 Walk-in Med Check/Ed Space 6 x 8 =48 0 0 Public Toilets 10 x 14 =140 2 280 Elevator 10 x 20 =200 0 0 Stairs 24 x 10 =240 0 0 Janitors Closet 6 x 4 =24 1 24 TOTAL 0 3,048 762 3,810 Murphy Beds Public Entrance to Training Center Training Materials Code Books Location: Elk River, MN Open area with layout table Notes Project: Elk River Fire Department - New Northwest Station Administration/Office Spaces Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Administration/Office Spaces Total (Ft2) Efficiency Ratio of 25% Subtotal (Ft2) 1936 Chevy 70 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Day Room 20 x 15 =300 1 300 Kitchen 20 x 20 =400 1 400 Pantry 8 x 8 =64 0 0 Dining for 8-12 20 x 15 =300 1 300 Dorm Room 10 x 13 =130 0 0 Restrooms/Showers 8 x 10 = 80 0 0 Linen Closet 6 x 8 =48 0 0 Supply Closet 4 x 5 =20 0 0 Residential Laundry 8 x 10 = 80 0 0 Janitor's Closet 6 x 6 =36 1 36 TOTAL 0 1,036 259 1,295 Future Project: Elk River Fire Department - New Northwest Station Location: Elk River, MN Notes Living Quarters/Support Spaces 8-10 people Future Future 4) Future Future Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Living Quarters Spaces Total (Ft2) 71 Location: Elk River, MN 1-Aug-17 Spaces Existing Quantity Parking Fire Staff Parking 25 EMS Staff Parking 0 Public Parking 100 Training Parking 0 Total Parking 125 Fire Apparatus Apron 2 EMS Apparatus Apron 0 Outdoor Training 1 Outdoor Patio 1 Enclosed Dumpster 1 External Generator 1 Storm Water Treatment 1 Heliport Pad 0 Extrication pavement 1 Detatched storage building 1 Live Burn Building 1 Confined Space Prop 1 Car Fire Prop 1 Utility Fire Prop 1 Rail Car Prop 1 Hazmat Prop 1 Other Agencies Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Site Project: Elk River Fire Department - New Northwest Station Notes See public parking MMUA, Police Department 72 Date: 1-Aug-17 Totals Existing Areas 7,655 0 4,452 0 5,045 0 3,810 0 1,295 0 1,700 0 23,957 Station Footprint (Ft2) Sub Total 0 3,593 Infrastructure (M & E) Space Factor 15% 27,550 TOTAL PROGRAM SPACE REQUIRMENT NOTES: Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Living Quarters & Support Apparatus Support Training Administration/Office Tempered Spaces Project: Elk River Fire Department - New Northwest Station Apparatus Bays Location: Elk River, MN 73 Date: 1-Aug-17 Low High I. Site Acquisition Preferred Site $0 $0 Other Sites Sub Total $0 $0 II. Site Development 15%20% Utility Extensions $0 $0 Unsuitable Soils/Rock Removal $0 $0 Natural Gas Extensions $0 $0 Storm Water $0 $0 Site Improvements (hardscape)15%-20% of building costs $757,615 $1,071,131 Sub Total $757,615 $1,071,131 III. Building Construction Costs Size Cost/SF RS Means (20165)25,850 $ 196.66 $5,083,656 Five Bugles Historic (2016/17)25,850 $ 185.40 $4,792,585 Cold Storage 1,700 $ 151.87 $258,179 $ 272,000 Sub Total $5,050,764 $5,355,656 IV. Furniture Fixtures and Equipment FF&E $101,015 $ 214,226 Specific Equipment by Owner $0 $0 Others $0 $0 Sub Total $101,015 $ 214,226 V. Communications and Technology Technology $101,015 $ 214,226 Communications $0 $0 Audio Visual Equipment $0 $0 Sub Total $101,015 $ 214,226 VI. Contingencies, Inflation and Other Costs Inflation to mid-point of construction $318,552 $ 342,762 Owners Contingency $316,448 $ 359,900 Sub Total $635,000 $ 702,662 VI. Professional Fees and Legal Architectural/Engineering $435,725 $ 616,972 Geotechnical Studies $15,000 $25,000 Commissioning $0 $0 LEED/Sustainability $0 $0 Hazardous Materials $0 $0 Testing and Inspections $15,000 $25,000 Legal $136,676 $ 231,364 Sub-Total $602,400 $ 898,336 TOTALS $7,247,809.41 $8,456,237.79 5% of total construction costs Unforeseen Conditions, Owner Changes, E&O 7-9% of Construction Costs 2.5-4% of Costs Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Cost of borrowing, Att. Fees, etc. 2-4% of Building Construction 2-4% of Building Construction Allowance 3%-5% total construction cost Data systems, backbone, patch panels Radio, Tower, Repeaters, Etc. Assume spring of 2018 construction start Assumes mostly new SCBA, Exercise, vehicle exhaust Building Only Building Only Tempered construction Typical hardscape Location: Elk River, MN Potential Costs Remarks Project: Elk River Fire Department - New Northwest Station 74 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Police Department (Probable Project Cost Only) 75 Date: 2-Feb-17 Low High I. Site Acquisition Preferred Site $0 $0 Other Sites Sub Total $0 $0 II. Site Development 15%20% Utility Extensions $0 $0 Unsuitable Soils/Rock Removal $0 $0 Natural Gas Extensions $0 $0 Storm Water $0 $0 Site Improvements (hardscape)5%-10% of building costs $111,175 $244,585 Sub Total $111,175 $ 244,585 III. Building Construction Costs Size Cost/SF (Plus 10%) New Construction 5,980 $ 175.00 $1,046,500 $1,151,150.0 Major Renovations 1,745 $ 120.00 $209,400 $ 230,340 Minor Renovations 12,095 $80.00 $967,600 $1,064,360 Cold Storage 0 $151.87 $0 $0 Sub Total $2,223,500 $2,445,850 IV. Furniture Fixtures and Equipment FF&E $35,000 $50,000 Specific Equipment by Owner $0 $0 Others $0 $0 Sub Total $35,000 $50,000 V. Communications and Technology Technology $15,000 $20,000 Communications $0 $0 Audio Visual Equipment $0 $0 Sub Total $15,000 $20,000 VI. Contingencies, Inflation and Other Costs Inflation to mid-point of construction $126,388 $ 138,022 Owners Contingency $251,106 $ 289,846 Sub Total $377,494 $ 427,867 VI. Professional Fees and Legal Architectural/Engineering $170,427 $ 248,439 Geotechnical Studies $15,000 $25,000 Commissioning $0 $0 LEED/Sustainability $0 $0 Hazardous Materials $0 $0 Testing and Inspections $15,000 $25,000 Legal $57,338 $100,634 Sub-Total $257,765 $ 399,073 TOTALS $3,019,933.80 $3,587,375.58 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com 2.5-4% of Costs Cost of borrowing, Att. Fees, etc. Allowance Data systems, backbone, patch panels Allowance 3%-5% total construction cost Assume spring of 2018 construction start 10% of total construction costs Unforeseen Conditions, Owner Changes, E&O 7-9% of Construction Costs Radio, Tower, Repeaters, Etc. Tempered construction Allowance Assumes mostly new Typical hardscape Building Only Project: Elk River Fire Department - Public Safety Building Fire Station No.2 Location: Elk River, MN Potential Costs Remarks 76 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Training Center 77 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Training Tower 30 x 40 =1200 1 1200 Hose/Gear Dryer 8 x 10 = 80 0 0 Protective Gear Lockers 5 x 2 =10 0 0 Mud Room Spaces Dirty Restroom 8 x 12 = 96 2 192 Gear Laundry 10 x 10 =100 0 0 Residential Laundry Equip.8 x 10 = 80 0 0 Equipment Decon 8 x 16 =128 1 128 Personnel Decon Locker Room 10 x 12 =120 0 0 Personal Decon Spaces 6 x 10 = 60 0 0 SCBA Equipment Work Room/SCBA 8 x 11 = 88 0 0 SCBA Clean and Fill Room 8 x 12 = 96 0 0 Vehicle Maintenance Room 10 x 12 =120 0 0 Hazmat. Booms and Other Storage 10 x 10 =100 0 0 General Storage 10 x 10 =100 1 100 Mezzanine 80 x 20 =1600 0 0 Medical Related Spaces EMS Report Writing 8 x 12 = 96 0 0 EMS Storage 8 x 10 = 80 0 0 Regulated Storage 6 x 6 =36 0 0 Bio Hazard Control 6 x 6 =36 0 0 Janitors Closet 8 x 4 =32 0 0 TOTAL 0 1,620 35 x 16 560 4 324 1,944 Elk River Fire Department - Regional Training Center Notes Elk River, MN In Decon Spaces Toilet and Shower with hose real Separate from Ap Bay Commercial extractor and dryer Cleaning backboards, etc. Apparatus Support See also Living Quarters With (20) 1/2 lockers 1 shower and 1 steam room Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Apparatus Support Total (Ft2) Efficiency Ratio of 20% 78 Date: Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Internal Training Training Room/Community Room 35 x 85 =2975 1 2975 Training Storage 12 x 12 = 144 1 144 Table and Chair Storage 10 x 12 = 120 1 120 General Storage 10 x 12 = 120 1 120 Large Training Props 20 x 24 = 480 1 480 Kitchen/Kitchenette 16 X 12 = 192 1 192 Physical Fitness Exercise Room 30 x 40 =1200 1 1200 Wellness space 8 x 10 = 80 1 80 Locker Room(s)20 x 30 = 600 2 1200 Shower/Toilets 8 x 10 = 80 2 160 Sub Total TEMPERED STORAGE, Proposed TRAINING APPARATUS & EQUIPMENT Bay Building Maintenance Equipment 20 x 20 = 400 1 400 Training Props 10 x 20 = 200 1 200 General Storage 10 x 20 = 200 1 200 Mobile Live Burn Trlr (MLFTU)60 x 16 = 960 0 0 Mobile Training Tower (MTT)60 x 16 = 960 0 0 Ventilation Trlr (Vent)40 x 16 = 640 0 0 Driving Simulator (Driving)40 x 16 = 640 0 0 Tractor Trailer (semi)30 x 16 = 480 0 0 Survive Alive Trailer 40 x 16 = 640 1 640 Portable lighting 24 x 16 = 384 0 0 Boat and Trailer 35 x 16 = 560 0 0 Snowmobile/ATV/Trailer 16 x 16 = 256 0 0 Safe Escape Trailer 60 x 16 = 960 1 960 Sub Total TOTAL 0 9,071 2,268 11,339 In decon area Serving with fridge Elk River Fire Department - Regional Training Center Elk River, MN Notes Training 1-Aug-17 150 attendees, dividable into 3 space 8338.75 Includes efficiency ratio 25 Full size lockers 3000 Includes efficiency ratio Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Subtotal (Ft2) Efficiency Ratio of 25% Training Total (Ft2) 79 Date: 1-Aug-17 Spaces Existing Length x Width =Ft2 Quantity Total Ft2 Fire Chief 20 x 12 =240 0 0 Training Chief 16 x 12 =192 1 192 Fire Marshal/Investigator 16 x 12 =192 0 0 Evidence Storage 6 x 8 =48 0 0 Plan/Equip Storage 8 x 8 =64 0 0 Deputy/Battalion Chiefs 30 x 10 =300 0 0 Sleeping Room 10 x 13 =130 0 0 Toilet/Shower 8 x 10 = 80 0 0 Training Assistant 10 x 13 =130 1 130 Pub Ed Office 14 x 12 =168 1 168 Pub Ed Storage 6 x 8 =48 1 48 Inspections Unit Inspectors Office 14 x 12 =168 0 0 Plan Review 18 x 12 =216 0 0 Conference Room 18 x 14 =252 0 0 Resource Library 2 x 10 = 20 0 0 Record Storage 14 x 12 =168 0 0 Future Office 16 x 10 =160 1 160 Administrative Assist. Office 16 x 12 =192 1 192 Fax/Work/Copy 8 x 10 = 80 1 80 Record Storage 8 x 10 = 80 1 80 Misc. Office Supplies 4 x 6 =24 1 24 Conference Room 20 x 20 =400 2 800 Staff Toilets 8 x 8 =64 1 64 Watch/Comm Office 16 x 12 =192 0 0 POC Staging Area 8 x 12 = 96 0 0 Study/Work Area 8 x 10 = 80 0 0 Resource Library 2 x 10 = 20 0 0 New Gear and Uniform Storage 8 x 16 =128 0 0 General Storage 8 x 10 = 80 0 0 Communications/ IT 10 x 20 =200 0 0 Public/Support Spaces Entrance Vestibule 30 x 20 =600 1 600 Walk-in Med Check/Ed Space 6 x 8 =48 0 0 Public Toilets 10 x 14 =140 2 280 Elevator 10 x 20 =200 0 0 Stairs 24 x 10 =240 0 0 Janitors Closet 6 x 4 =24 1 24 TOTAL 0 2,842 711 3,553 One for training, one for office staff Murphy Beds Public Entrance to Training Center Training Materials Code Books Elk River, MN Open area with layout table Notes Elk River Fire Department - Regional Training Center Administration/Office Spaces Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Administration/Office Spaces Total (Ft2) Efficiency Ratio of 25% Subtotal (Ft2) 1936 Chevy 80 Elk River, MN 1-Aug-17 Spaces Size Quantity Parking Training Staff Parking 5 Public Parking 95 Total Parking 100 Fire Department Rubble Pile 1 Acre Burn Tower 0.5 Acre Train car 3 Acre Bus Incl Incl Police Department Traffic Stop Training 2 Acres Accident Scene Invest.Incl Incl Elk River Municipal Transformer Station 2 Acres Public Works/Streets Department 2 Acres Sub Total 10.5 Roads and Circulation 50% Total Area Required 15.75 Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Site Elk River Fire Department - Regional Training Center Notes Includes parking for large vehicles with trailers and fire trucks Shared with Police Shared with Police Consider small scale neighborhood block 81 Date: 1-Aug-17 Totals Existing Areas 1,944 0 8,339 0 3,553 0 3,000 0 16,835 Station Footprint (Ft2) Sub Total 0 842 Infrastructure (M & E) Space Factor 15% 17,677 TOTAL PROGRAM SPACE REQUIRMENT NOTES: Elk River Fire Department - Regional Training Center Elk River, MN Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Training Support Training Training Office Tempered Spaces 82 Date: 1-Aug-17 Low High I. Site Acquisition Preferred Site $0 $0 Other Sites Sub Total $0 $0 II. Site Development 15%20% Utility Extensions $0 $0 Unsuitable Soils/Rock Removal $0 $0 Natural Gas Extensions $0 $0 Storm Water $0 $0 Site Improvements (hardscape)5%-10% of building costs $158,836 $336,638 Sub Total $158,836 $ 336,638 III. Building Construction Costs Size Cost/SF RS Means (20165)14,677 $ 196.66 $2,886,381 Five Bugles Historic (2016/17)14,677 $ 185.40 $2,721,118 Cold Storage 3,000 $ 151.87 $455,610 $ 480,000 Sub Total $3,176,728 $3,366,381 IV. Furniture Fixtures and Equipment FF&E $25,000 $35,000 Specific Equipment by Owner $0 $0 Others $0 $0 Sub Total $25,000 $35,000 V. Communications and Technology Technology $15,000 $20,000 Communications $0 $0 Audio Visual Equipment $0 $0 Sub Total $15,000 $20,000 VI. Contingencies, Inflation and Other Costs Inflation to mid-point of construction $178,905 $ 187,901 Owners Contingency $355,447 $ 394,592 Sub Total $534,352 $ 582,493 VI. Professional Fees and Legal Architectural/Engineering $409,268 $ 450,962 Geotechnical Studies $15,000 $25,000 Commissioning $0 $0 LEED/Sustainability $0 $0 Hazardous Materials $0 $0 Testing and Inspections $15,000 $25,000 Legal $80,918 $136,855 Sub-Total $520,186 $ 637,818 TOTALS $4,430,102.33 $4,978,329.99 10% of total construction costs Unforeseen Conditions, Owner Changes, E&O 12% of Construction Costs 2.5-4% of Costs Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com Cost of borrowing, Att. Fees, etc. Allowance Allowance Allowance 3%-5% total construction cost Data systems, backbone, patch panels Radio, Tower, Repeaters, Etc. Assume spring of 2018 construction start Assumes mostly new SCBA, Exercise, vehicle exhaust Building Only Building Only Tempered construction Typical hardscape Elk River, MN Potential Costs Remarks Elk River Fire Department - Regional Training Center 83 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies FIRE FACILITIES ASSESSMENT The following conditions report examines two aspects of the existing station; physical condition of the infrastructure and operational characteristics of the facility. These should be considered together when making decisions regarding the long term disposition of these facilities. Station No. 1 415 Jackson Ave NW Fire Station No. 1 was originally constructed in 1972 as a, 3 bay station with drive through bays. It has been expanded twice increase the capacity for the fire department (1989) and to add space for Elk River Ambulance Service (2006). The facility has six apparatus bays dedicated to Fire and one dedicated to the Ambulance Service. PHYSICAL CONDITION: Building Envelope: This facility is predominantly a masonry load bearing structure with metal bar joists and metal deck for a roofing structure. Visible elements of the buildings superstructure, including exterior masonry walls appear to be in good condition. Exterior doors and windows are in good, operable condition. Most windows are aluminum with insulated glazing. The roof of the EMS portion is original to its construction (2006). The remainder of the roof was replaced in 2013. Both remain in serviceable condition. Interior Fit and Finish: The facility is very clean and in good repair. The apparatus bay floors, walls and ceilings appear to have been recoated since construction. The support areas of the fire department however have seen heavy traffic and appear to be reaching the end of their useful life. Specifically, the kitchen area is small, cramped with dated cabinetry, counter tops and trim. Only the 2006 addition provides ADA accessibility. Any major construction on the facility would require updating. 84 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Mechanical/Electrical Infrastructure – A number of the buildings systems are original to its construction. Of most concern is the building’s electrical system. The facility relies on a number of inefficient HVAC systems to provide heating and cooling. The Office and training rooms are heated with aging gas fire roof top units. The apparatus bays are heated with ceiling mounted, gas fired heating units supported by air handlers. More efficient systems are available that will improve indoor air quality, reduce energy related costs, and reduce maintenance. Specifically, any new stations should consider an in-slab heating system for the apparatus bay. These systems provide heat at the ground level, dry the floor and equipment faster and are more efficient to operate than other systems. The electrical service has reached its capacity. This single phase service is, however, inappropriate for the use; much of the support equipment for the department requires a three phase service. Accommodations were recently made in order to purchase a new SCBA Compressor unit due power concerns. The building isnot sprinklered which was compliant atthe time of construction, but would not be compliant today. Any major work to the building should include adding a sprinkler system. OPERATIONS Drive through operations – Drive through fire stations are safer and more efficient than back-in stations. Safely backing a fire truck into a station requires a minimum of 3 personnel who have been trained in the specifics of the operation. This becomes even more unsafe when combined with Personal Protective Gear (turn out gear) stored on the apparatus floor. Station No. 1 has some drive through bays (2 of 6), but the approach that creates the drive through uses the parking lot for a neighboring property. If this situation were to change the department would be severely hampered by stacked equipment that could not be easily accessed. This condition should be resolved with an easement to allow this condition as long as the station is to remain. The apparatus bay doors are small (12’X12’) as are the bay widths with some as narrow as 15’-4”. Lot size – The existing facility, parking, drives, and aprons currently occupies the entire site. Fire trucks have large turning radii. A full department turn out for a fire call or training event could entail 35-40 members and staff at the station. Adequate training requires the deployment of vehicles on the aprons and the attachment and deployment of hoses and other equipment. There is currently no room for these activities and no opportunity to acquire more space. Personnel and Equipment Decontamination Spaces – Recent studies related to the prevalence of cancers within the fire service is raising awareness of the contaminants 85 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies released during fire events. Proper decontamination of equipment and personnel. Station No. 1 does not have appropriate facilities for current best practices. Installation of such might be cost prohibitive given the facilities age. Some of the specific challenges include: No showers or personnel decontamination spaces. Turnout gear is stored in the apparatus bays leading to increased contamination. Space for cleaning of gear, including trucks is limited, and shared with other uses. No direct vent exhaust available for trucks. Staff Support Spaces – Staff support spaces such as Day Room and Office/Sleeping Rooms do not exist. Adding them would require reductions in other spaces that are needed or additions for which there is not room on site. Future construction at other Elk River Fire Department facilities is recommending construction of these spaces which will lead to inequities in the overall department. Training – Training for fire departments comes in two types, classroom style and physical training. The facility has a small training room, but will not sit the entire compliment that shows up for a training. There is no space dedicated to the physical training activities such as hose and ladder drills, stairs, standpipes, confined space, etc. Location – The station location study indicates that this facility is correctly located for the current demographics of Elk River. However, it there is response overlap with Station No. 2 and does not provide adequate response to the northern reaches of the City. A time can be envisioned when a station will be needed north of Station No. 1, and when fewer of the department’s personnel live within timely reach of the station. Also, it is located relatively close in both time and distance to Station No. 2 making a large percentage of its response redundant to that station. Energy Efficiency – Energy usage was not a major consideration in building construction in 1972. Those portions of the building certainly do not meet current energy codes. Any major updating of the facility would require some energy usage improvements. Newer portions, with the possible exception the EMS addition are likely to only be slightly better performing. RECOMMENDATIONS Recommendation No. 1: Obtain an easement allowing the current drive through situation to continue to protect the department from a sudden change in operations due to change in that situation. Recommendation No. 2: Station No. 2 is newer, serves as the Department Headquarters, is well located at the Government Center and will continue to serve the department well. Station No. 1 on the other hand is older, landlocked, and isnot providing coverage that it could for the City. Future planning should assume replacement of Station No. 1 in the next 10 years. Minimize maintenance to repair where possible and replacement only when necessary. 86 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies Station No. 2 13073 Orono Parkway NW PHYSICAL CONDITION Building Envelope: Station No. 2 shares space in the Public Safety Building with the Elk River Police Department. It appears to be well constructed of load bearing masonry construction with metal bar joist and metal deck roof structure. It was constructed in 2003 and is well within its operating life, though some systems may be expected to need replacement in the coming years. Exterior doors and windows are in good, operable condition with aluminum windows with insulated glazing. The roof is original to its construction and within its operational limits. Mechanical and Electrical Systems: The HVAC system is a Geothermal heat exchange system with a variety of heat pumps providing point of service control. This system seems to be operating well all though there are some reports of failing heat pumps in random areas of the building; which should be considered normal for the life of these systems. The building is sprinklered. No concerns have been reported with the heating or electrical systems beyond normal maintenance. OPERATIONS Station No. 2 operates as the department’s headquarters station. Changes made in recent years have reorganized the administrative offices to better function for that role. Otherwise the facility functions 87 Elk River Fire Department Elk River, MN Fire Station Feasibility and Facilities Study Five Bugles Design A Division of Wendel Companies well in its role as a fire station. There are however several challenges at this facility that should be addressed: Staff Support Spaces: There are no spaces dedicated to the support of the Paid-On-Call staff such as Day Room, lockers and showers, equipment and personnel decontamination, office/living spaces. Paid-On- Call staff provide a great value to the City of Elk River. Providing spaces for them to clean up after fire calls and drills, to share a meal and decompress are critical to the physical and emotional health of the department. Creating spaces that the department wants to and can use at all hours provides the City with a ‘manned’ facility, greatly reducing response times. Personnel and Equipment Decontamination Spaces – Recent studies related to the prevalence of cancers within the fire service is raising awareness of the contaminants released during fire events. Proper decontamination of equipment and personnel. Station No. 1 does not have appropriate facilities for current best practices. Installation of such might be cost prohibitive given the facilities age. Some of the specific challenges include: No showers or personnel decontamination spaces. Turnout gear is stored in the apparatus bays leading to increased contamination. Space for cleaning of gear, including trucks is limited, and shared with other uses. No direct vent exhaust available for trucks. Training: The Department’s training program has been very successful and is seen as a revue generating program in the future. This will require expansion of the training room. There is currently no onsite physical training capability, nor is there room on site. This activity should be provided at other new stations as they are constructed. RECOMMENDATIONS Recommendation No. 1: Add support spaces (office, dayroom, kitchen, showers and lockers) similar to those recommended for the new East Station. This will allow the department to continue with best practices in their operations. Recommendation No. 2: Implementation of Recommendation No. 1 will construct a kitchen at this facility as part of the addition. The existing kitchen area can then be used to enlarge the training room. 88 Banbury Place Building D04 800 Wisconsin Street Eau Claire, WI 54703 715.832.4848 4715 Pilgrim Lane N Minneapolis, MN 55442 612.840.3773 FiveBuglesDesign.com